Notice of Consideration, Approval of Transfer of Facility Operating License and Conforming Amendment and Opportunity for a Hearing
ML063490097
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 01/18/2007
From: Mcconnell K
NRC/FSME/DWMEP/DURLD
To:
qi gan
References
Download: ML063490097 (4)


Text

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION CONSUMERS ENERGY COMPANY BIG ROCK POINT PLANT DOCKETS NO. 50-155 AND 72-043 NOTICE OF CONSIDERATION OF APPROVAL OF TRANSFER OF FACILITY OPERATING LICENSE AND CONFORMING AMENDMENT AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (the Commission) is considering the issuance of an order under 10 CFR 50.80 and 10 CFR 72.50 approving the transfer of Facility Operating License No. DPR-6 for Big Rock Point (BRP) Plant and Independent Spent Fuel Storage Installation (ISFSI) License No. SFGL-16 for BRP currently held by Consumers Energy Company (Consumers). The transfer would be to Entergy Nuclear Palisades, LLC (Entergy Nuclear Palisades) to possess and own, and Entergy Nuclear Operations, Inc. (ENO), to control and operate, the ISFSI. The Commission is also considering amending the licenses for administrative purposes to reflect the proposed transfer.

According to an application for approval filed by Consumers, Entergy Nuclear Palisades, and ENO, Entergy Nuclear Palisades would acquire ownership of the facility following approval of the proposed license transfer, and ENO would control and operate ISFSI. No physical change to the BRP facility or operational changes are being proposed in the application.

The proposed amendment would replace references to Consumers in the license with references to Entergy Nuclear Palisades and ENO to reflect the proposed transfer.

Pursuant to 10 CFR 50.80 and 10 CFR 72.50, no license, or any right thereunder, shall be transferred, directly or indirectly, through transfer of control of any license unless the Enclosure

Commission shall give its consent in writing. The Commission will approve an application for the transfer of a license, if the Commission determines that the proposed transferee is qualified to hold the license, and that the transfer is otherwise consistent with applicable provisions of law, regulations, and orders issued by the Commission pursuant thereto.

Before issuance of the proposed conforming license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations.

As provided in 10 CFR 2.1315, unless otherwise determined by the Commission with regard to a specific application, the Commission has determined that any amendment to the license of a utilization facility or to the license of an ISFSI which does no more than conform the license to reflect the transfer action involves no significant hazards consideration and no genuine issue as to whether the health and safety of the public will be significantly affected. No contrary determination has been made with respect to this specific license amendment application. In light of the generic determination reflected in 10 CFR 2.1315, no public comments with respect to significant hazards considerations are being solicited, notwithstanding the general comment procedures contained in 10 CFR 50.91.

The filing of requests for hearing and petitions for leave to intervene, and written comments with regard to the license transfer application, are discussed below.

Within 20 days from the date of publication of this notice, any person whose interest may be affected by the Commissions action on the application may request a hearing and, if not the applicant, may petition for leave to intervene in a hearing proceeding on the Commissions action. Requests for a hearing and petitions for leave to intervene should be filed in accordance with the Commissions rules of practice set forth in Subpart C Rules of General Applicability: Hearing Requests, Petitions to Intervene, Availability of Documents, 2

Selection of Specific Hearing Procedures, Presiding Officer Powers, and General Hearing Management for NRC Adjudicatory Hearings, of 10 CFR Part 2. In particular, such requests and petitions must comply with the requirements set forth in 10 CFR 2.309. Untimely requests and petitions may be denied, as provided in 10 CFR 2.309(c)(1), unless good cause for failure to file on time is established. In addition, an untimely request or petition should address the factors that the Commission will also consider, in reviewing untimely requests or petitions, set forth in 10 CFR 2.309(c)(1)(i)-(viii).

Requests for a hearing and petitions for leave to intervene should be served upon Douglas E. Levanway, Wise, Carter, Child, and Caraway, P.O. Box 651, Jackson, MS 39205, 601-968-5524, Facsimile: 601-968-5593, Email: DEL@wisecarter.com, and Sam Behrends, LeBoeuf, Lamb, Greene & MacRae, 1875 Connecticut Ave., NW, Suite 1200 Washington, DC 20009, 202-986-8108, Facsimile: 202-986-8102, Email: Sbehrend@llgm.com; the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (e-mail address for filings regarding license transfer cases only: OGCLT@NRC.gov); and the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:

Rulemakings and Adjudications Staff, in accordance with 10 CFR 2.302 and 2.305.

The Commission will issue a notice or order granting or denying a hearing request or intervention petition, designating the issues for any hearing that will be held and designating the Presiding Officer. A notice granting a hearing will be published in the FEDERAL REGISTER and served on the parties to the hearing.

As an alternative to requests for hearing and petitions to intervene, within 30 days from the date of publication of this notice, persons may submit written comments regarding the license transfer application, as provided for in 10 CFR 2.1305. The Commission will consider and, if appropriate, respond to these comments, but such comments will not otherwise 3

constitute part of the decisional record. Comments should be submitted to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and should cite the publication date and page number of this FR Notice.

For further details with respect to this action, see the application dated October 31, 2006, available for public inspection at the Commission's Public Document Room (PDR),

located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor),

Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System's (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site, http://www.nrc.gov/reading-rm/adams.html.

Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737 or by e-mail to pdr@nrc.gov.

Dated at Rockville, Maryland this __18th_____day of January 2007.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Keith I. McConnell, Deputy Director Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs 4