STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS RHODE ISLAND ATOMIC ENERGY COMMISSION Rhode Island Nuclear Science Center 16 Reactor Road Narragansett, RI 02882-1165 Mr. Dan Hughes 15 November 2006 Project Manager Non-Power Reactors, Decommissioning, and Environmental Directorate Division or Reactor Projects - III/IV/V U.S. NRC Washington, D.C. 20555 Dear Mr. Hughes During a recent inspection of the Rhode Island Nuclear Science Center, the inspector noted that the NRC did not have the most recent revision of the Reactor Operator Re-Qualification procedure. Please find a copy of the latest revision enclosed. The procedure has been revised twice since its inception. A copy of both of the Procedure Change Sheets is also enclosed. None of the changes that have been made were substantive in nature, so the Re-Qualification Program has not changed. If you have any questions regarding this matter, please do not hesitate to call me.

Sincerely, Michael J. Davis Reactor Supervisor

/(Ozo

Reactor Operator Re-Qualification Changes Rev.0 to Rev. 1 The following modifications have been made to this procedure:

1. In section IV.G. 1.a, the review for ensuring that operators have participated in at least one reactor operation for at least four hours each quarter has been changed from a monthly review to a quarterly review because it makes more sense to review quarterly requirements on a quarterly basis, rather than a monthly basis.
2. In section VI, an attachment entitled "Operator Requalification Program Checksheet" has been added as a record for the requalification status of each operator.

Reactor Operator Re-Qualification Changes Rev. 1 to Rev. 2 Attachment B "Operational Requalification Exam" has been added to the procedure. This attachment provides a general format for recording the annual operational requalification exam results.

R IN S C OPERATING PROCEDURES Reactor Operator Re-Qualification I. SCOPE:

This instruction outlines the requirements for re-qualifying reactor operators and senior reactor operators at the RINSC.

I1. DISCUSSION:

The RO/SRO re-qualification program is designed to demonstrate RO/SRO competence and to satisfy the requirements of 10CFR55.53 and 10CFR55.59 For the purpose of this procedure, RO shall refer to any licensed Reactor Operator, SRO shall refer to any licensed Senior Reactor Operator, and Operator shall refer to any licensed operator, reactor, or senior reactor.

II1.

REFERENCES:

A. 10CFR55.53 B. 10CFR55.59 C. Non-Power Reactor Operator Licensing Examiner Standards -NUREG 1478, June 1995.

IV. PRECAUTIONS:

A. To maintain an active Operator's License at the RINSC one shall:

1. Be the console operator at least once every three months and operate a total of at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or complete SRO duties for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> (10CFR 55.53e)
2. Complete a yearly operational re-qual exam, and a two year written exam successfully and in a timely manner (within 30 days)
3. Renew one's NRC Operator License every six years in a timely manner
4. Review changes to the Facility License, Technical Specifications, Operating Procedures, Emergency Plan and Implementing Procedures, Security Plan, Facility Design Changes, NRC Notices, and other important reactor related material in a timely manner
5. Successfully complete a biennial medical evaluation Revised by/Date Approved by/Date Revision No. Procedure No.

NRSC MJD 5/2/05 6/29/05 2 App U Page 1 of 1

V. PROCEDURE

S:

A. INTRODUCTION The Re-qualification Program is designed to demonstrate Operator and Senior Operator competence, and to satisfy the requirements of 10CFR55.59 for license renewal. The Program embodies the substance of 10CFR55.59, including provisions for an annual operational examination, a biennial written examination, a structured lecture and study program when necessary to correct deficiencies, on the job training and evaluation of licensees, and a records maintenance system.

During each year, an operational examination shall be administered to all licensed personnel having regular operational responsibility at the RINSC.

Every other year, a written examination shall be administered.

Subsequent to determining any deficiencies indicated by the annual examination, a retraining program will be initiated which consists of a combination of lectures, self-study by the licensee, tutoring of the licensee, and appropriate examination on the material covered. The final selection of the combination of retraining sessions will depend upon the performance of the licensee on the written examination.

All study materials used in the program shall be reviewed to assure they remain current. Study materials shall be collected and made available to all licensees throughout the course of the program.

B. PROGRAM ADMINISTRATION AND REVIEW The Assistant Director for Operations of the RINSC shall serve as the Training Coordinator, and shall be responsible for the implementation, coordination, and operation of the Re-qualification Program. The duties of the Training Coordinator shall be designated to another SRO on alternate years. The Training Coordinator or his designee will prepare, administer, grade, and review all examinations and quizzes required by the program. In this capacity, and since he is a licensed Senior Operator, he will be considered as having completed the examination and retraining program requirements for that period.

C. BIENNIAL WRITTEN EXAMINATION

1. The biennial written examination given to all licensed personnel, will include questions taken from:

Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 2 of 2

a. Reactor Theory, Thermodynamics, and Facility Operating Characteristics.
b. Normal and Emergency Operating Procedures and Radiological Controls.
c. Facility and Radiation Monitoring Systems.
2. The exam should contain at least 10 objective questions from each section.
3. The examinations may be open book.
4. The exams will be graded, reviewed and retained at the RINSC. For each licensee, a review form will be prepared indicating his/her grade in each exam category. The areas of deficiency and the retraining to be followed in improving the licensee's competence in that area will then be determined.

A grade below 70% in a single category shall require retraining for that licensee in that area of deficiency. An overall score below 70% on the exam shall require that:

a. The licensee shall be immediately enrolled in a retraining program.
b. Prior to continuing his/her responsibilities of operation of the reactor, the licensee shall be given an oral exam to verify competence as a console operator.

D. RETRAINING PROGRAM

1. The retraining program shall consist of an appropriate combination of:
a. Lectures,
b. Self-study of reference materials,
c. Tutoring sessions,
d. Examinations.
2. Retraining shall be completed within 90 days and require passing of a written exam on the appropriate section(s).

E. REACTOR OPERATIONAL EXAM One reactor operation of each year for each licensee shall be devoted to operator re-qualification. The training coordinator shall be present in the control room during all reactivity control manipulations associated with the operation, and shall evaluate the operator's performance, competence, knowledge of the reactor system, and knowledge of operating and emergency Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 3 of 3

procedures. If deficiencies are noted, a retraining program will be organized, implemented and conducted within a period of 90 days. The performance evaluation should include:

1. Administrative topics,
2. Control room systems,
3. Facility walkthrough,
4. Reactor operation.

F. RE-QUALIFICATION PROGRAM STUDY MATERIALS The training coordinator shall provide a complete set of study and reference materials for use. It shall be his/her responsibility to perform a review of the contents of these reference materials to ensure they are adequate and accurately reflect operations, conditions, and design characteristics of the facility. As a minimum, these materials shall include copies of:

1. A suitable general reference text on reactor physics,
2. RINSC Operating Procedures,
3. RINSC Abnormal Procedures,
4. RINSC Emergency Plan & Implementing Procedures,
5. RINSC Technical Specifications,
6. GE Operation and Maintenance manual,
7. 10CFR19, 20, 50, 55, and 70,
8. RINSC Radiation Safety Guide,
9. Health Physics principles & techniques.

G. SPECIAL CONDITIONS

1. Operating Frequency
a. A quarterly review shall be performed to ensure that each licensee has participated in at least one reactor operation during each three month period for at least four (4) hours or supervised licensed activities for at least four (4) hours or a combination totaling four (4) hours.
b. A licensee who does not participate in reactor operation for three or more months shall be given an oral examination on facility and procedure changes, and shall perform a minimum of six (6) hours of supervised reactor operations before being reassigned regular operational duties at the facility, provided he is up to date on the comprehensive biennial written examinations. These actions are required to meet 10CFR55.53(f) re-certification requirements. Results of these examinations shall be retained in the licensee's file.

Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 4 of 4

2. A licensee who does not complete the biennial exam shall not be allowed to assume the operator duties until the exam is successfully completed and graded.
3. Serious deficiencies in either the written exam (<55% overall) or the operational exam may result in removal of certification until retraining is successfully completed.

H. RECORDS These records shall be retained at the RINSC for the period until the individual's license is renewed:

1. All exams and required re-examinations, which were taken by the licensee during each of the re-qualification period.
2. The examination review sheets filled out at the conclusion of the exam and after any indicated re-exams. There should also be an evaluation sheet completed for each operational exam.
3. Summaries of control manipulations for licensees involved in the re-qualification program (NSC-45).
4. Certification that each licensee has reviewed changes in the facility license, design, and procedures (Required Reading List sign-off sheet).
5. Certification of Medical Examination by Facility Licensee (NRC Form 396) for each licensee.

VI. ATTACHMENTS:

A. Written Requalification Exam Cover Sheet B. Operational Requalification Exam Template C. Operator Requalification Program Checksheet Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 5 of 5

THE RHODE ISLAND NUCLEAR SCIENCE CENTER RESEARCH REACTOR OPERATOR REQUALIFICATION EXAMINATION Name: License Number:

Date Administered:

Instructions:

Answers are to be written on the examination page itself. A grade of 70%

is required to pass the examination. Three hours are permitted to complete the examination.

Candidate's Declaration:

All work done on this examination is my own. I have neither given nor received aid.

Candidate's Signature Examination Results:

SECTION SECTION PERCENT SECTION POINTS SCORE OF SECTION A. Reactor Theory, Thermodynamics, Facility Characteristics 10 B. Normal & Emergency Procedures, Radiological Controls 10 C. Facility and Radiation Monitoring Systems 10 TOTAL 30 Evaluation:

Satisfactory (>70%)

Unsatisfactory Examiner's Signature: Date:

Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 6 of 6

Operational Requalification Exam Date :

C 1ndidate :

Candidate Operation Run Number:

1VI .nur *

1. Oneratin*' Procedure Annendix V RINSC Pre-Start Checkout :

I Oneratinf, Procedure Annendix V RINSC Pre-Start Checkout:

2. Operating I I I Procedure Section 7 Routine Startup i

13 LI 3.

Onerating Procedure ADnendix :

i - i,.i I I

4. Operating Procedure Appendix :

Ji LI

5. Emer~encv Plan ImDlementin2 Procedures :

Reactor Operator Re-Qualification

NSC-45 OPERATOR REQUALIFICATION PROGRAM CHECKSHEET Name: License Level: SRO RO: Year:

Complete 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of RO First Second Third Fourth duties, Quarter Quarter Quarter Quarter or 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of SRO duties each 1-1 Review changes to Facility License, Tech Specs, Operating Procedures, Emergency Procedures, Security Plan, Facility Design Changes, NRC Notices, and other related material..

Complete yearly Date:

operational re-qual exam.

Date:

Complete a biennial Date:

medical evaluation.

Renew NRC Operator Date:

License every six years.

Reactor Operator Revision No. Procedure No.

Re-Qualification 2 App U Page 8 of 8