SEuntergy Entergy Nuclear Operations, Inc.
Pilgrim Station 600 Rocky Hill Road Plymouth, MA 02360 November 17, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket 50-293 License No. DPR-35
REFERENCE:
LETTER NUMBER:
Dear Sir or Madam:
Response to NRC Request for Additional Information Regarding Emergency Plan Changes to the Pilgrim Nuclear Power Station Emergency Response Organization (TAC No. MD2814).
- 1.
NRC letter dated October 16, 2006.
Subject:
Request for Additional Information Regarding Emergency Plan Changes to the Pilgrim Nuclear Power Station Emergency Response Organization 2.06.097 By Reference 1, the NRC requested additional information regarding Emergency Plan changes to the Pilgrim Nuclear Power Station Emergency Response Organization.
Entergy has evaluated the request and the response is provided in Attachment 1.
This letter contains no commitments.
If you have any questions or require additional information, please contact Bryan Ford at (508) 830-8403.
Sincerely, Bryan Ford, Licensing Manager FM/dl
Attachment:
- 1. Response to NRC Request for Additional Information Regarding Emergency Plan Changes to the Pilgrim Nuclear Power Station Emergency Response SOrganization A
YLfs
Entergy Nuclear Operations, Inc Pilgrim Nuclear Station cc:
Mr. James Shea, Project Manager Plant Licensing Branch I-1 Division of Operator Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North O-8C2 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulator Commission 475 Allendale Road King of Prussia, PA 19406 Letter Number 2.06.097 Page 2 Mr. Robert Walker, Director Massachusetts Department of Public Health Schrafft Center Suite 1 M2A Radiation Control Program 529 Main Street Charlestown, MA 02129 Ms. Cristine McCombs, Director Mass. Emergency Management Agency 400 Worcester Road Framingham, MA 01702 Senior Resident Inspector Pilgrim Nuclear Power Station to Letter 2.06. 097 Page I of I Response to NRC Request for Additional Information Regarding Emergency Plan Changes to the Pilgrim Nuclear Power Station Emergency Response Organization NRC RAI #1 Will the required personnel training for the Chemistry Technicians be completed prior to implementing the proposed changes or will the submittal be revised to indicate that a short transition period will be implemented whereby qualifications will be verified prior to assuming the revised watch standing requirements?
Enterq¥ Response Entergy will ensure that the required training is provided prior to implementing the proposed change.
NRC RAI #2 In the evaluation section of your revised submittal, section 3.A., states that you have 4-30 minute and 4-60 minute Health Physics (HP) responders. Section 5 states that you have 2-30 minute and 2-60 minute HP responders. Please resolve the apparent inconsistency.
Enter-qy Response The information identified in Section 5 of the revised submittal was not clear and should have indicated that at the Alert or higher level emergency classification, four (4) thirty-minute and four (4) sixty-minute HP responders will report to the station.