Inspection Plan Changes - James A. FitzPatrick Nuclear Power Plant - Letter to Mr. Dietrich Informing of Plan Change
ML063260550
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/21/2006
From: Cobey E
Reactor Projects Branch 2
To: Peter Dietrich
Entergy Nuclear Northeast
Cobey, Eugene W. RI/DRP/PB2/ 610-337-517
References
Download: ML063260550 (3)


Text

November 21, 2006 Mr. Peter T. Dietrich Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT:

INSPECTION PLAN CHANGES - JAMES A. FITZPATRICK NUCLEAR POWER PLANT

Dear Mr. Dietrich:

On August 31, 2006, the NRC staff provided you an inspection plan, as a part of the Mid-Cycle Assessment Letter, that detailed inspection activities through March 31, 2008. Since then, the NRC has scheduled the region based inspections associated with the license renewal process, as well as radiation monitoring instrumentation and protective equipment for the James A.

FitzPatrick nuclear power plant. The purpose of this letter is to provide you the updated inspection plan through March 31, 2008.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspectors arriving onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

P. Dietrich 2

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5171 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No.

50-333 License No.

DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/Activity Plan cc w/encl:

G. Taylor, CEO, Entergy Operations, Inc.

M. Kansler, President, Entergy Nuclear Operations, Inc (ENO)

J. Herron, Sr, VP and Chief Operating Officer, (ENO)

C. Schwarz, VP, Operations Support (ENO)

K. Mulligan, General Manager, Plant Operations (ENO)

O. Limpias, VP, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. Faison, Manager, Licensing (ENO)

M. Colomb, Director of Oversight (ENO)

D. Wallace, Director, Nuclear Safety Assurance (ENO)

J. Costedio, Manager, Regulatory Compliance (ENO)

T. McCullough, Assistant General Counsel (ENO)

P. Smith, President, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services

P. Dietrich 2

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5171 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eugene W. Cobey, Chief Projects Branch 2 Division of Reactor Projects Docket No.

50-333 License No.

DPR-59

Enclosure:

FitzPatrick Nuclear Power Plant Inspection/Activity Plan cc w/encl:

G. Taylor, CEO, Entergy Operations, Inc.

M. Kansler, President, Entergy Nuclear Operations, Inc (ENO)

J. Herron, Sr, VP and Chief Operating Officer, (ENO)

C. Schwarz, VP, Operations Support (ENO)

K. Mulligan, General Manager, Plant Operations (ENO)

O. Limpias, VP, Engineering (ENO)

J. McCann, Director, Licensing (ENO)

C. Faison, Manager, Licensing (ENO)

M. Colomb, Director of Oversight (ENO)

D. Wallace, Director, Nuclear Safety Assurance (ENO)

J. Costedio, Manager, Regulatory Compliance (ENO)

T. McCullough, Assistant General Counsel (ENO)

P. Smith, President, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law J. Sniezek, PWR SRC Consultant M. Lyster, PWR SRC Consultant S. Lousteau, Treasury Department, Entergy Services DOCUMENT NAME: C:\\FileNet\\ML063260550.wpd SUNSI Review Complete: _DEJ_ (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N

RI/DRP E

NAME DJackson/DEJ ECobey/EWC DATE 11/09 /06 11/21/06 OFFICIAL RECORD COPY