New England Coalitions Proposed Corrections to the Transcript for Evidentiary Hearings of September 13, 14, 2006
ML063120061
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/30/2006
From: Shadis R
New England Coalition
To:
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 12472
Download: ML063120061 (10)


Text

. ý Rj,ý4,5 DOCKETED USNRC November 7, 2006 (11:27am)

OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF UNIT7ED STATES NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of ENTERGY NUCLEAR VERMONT YANKEE, LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

October 30, 2006 Docket No. 50-271 ASLBP No. 04-832-02-OLA NEW ENGLAND COALITION'S PROPOSED CORRECTIONS TO THE TRANSCRIPf FOR EVIDENTIARY HlEARINGS OF SEFfEMBER 13,14,2006 In accordance with the Atomic Safety and Licensing Board's ("Board") Order of October 12, 2006, New England Coalition proposes the following corrections to the transcript of September 14,2006. New England Coalition proposes to incorporate by reference the omitted material from the transcribed opening statements, as provided by the Board on October 19, 2003. New England Coalition proposes no additional corrections to the transcript of September 13,2006.

Page Line Delete Insert 1516 10 base basis for 11 The steady state-the transient conco that the steady state-the transient concern is that 14 the component's already weakened Thie components have already been weakened is problem or it problems that 19 SSSCs are -

"SSCs" 1517 8

And EPU At EPU?

1520 8

but not in II happens

happened, 13 option item 15 know it know that it ThM ( ete

-=sc S

o V/9411

16 it doesn't experience any flowing us it would not experience any flow induced vibrations, well vibrations, well 17 then I don't think, you know, it's then, I don't think, that you still know that throughout it's throughout the plant's 20 Each if each 21 was put was when it was put in 1523 17 knowledgics 22 to for 1524 16 limited what limited to what 20 bee somewhere been installed somewhere 22 say to answer your question, say the answer to your question 23 question answer 24 is depends on 1525 11 would would be 14 the concern is there is a concern becamuse 16 EPU EPU 19 answer is, to this answer to this is 20 we are 22 perform definitely Perform the tests definitely 1526 4

say keep 5

The-we We 9

hydraulics hydraulics is 13 reduces reduces it 14 reduce reduce it 1527 3

be-one be specific. One 18 we 19 rely 21 this ODYN 1528 12 everthing other things 22 and that is, 2

-1 23 that that that this 1529 1

confidence confidence in them 3

hard to operate how they operate 20 averaGe average 1530 4

what you, the trickle power ratio what. The Critical Power Ratio 9

that 14 that here with which 15 the 1531 13

bypass, bypass 14 too flow 1533 13 It 15 density density at Brunswick 21 what you should take is you should use 22 something, something, and 24 5.2, 1 don't know the 5.2 power density, I don't know if the 25 average average power density.

1534 1

spaces spacers 2

there that there. That 6

dryer dryers 9

talking every little talking about including every little parameter 10 inthatODYN intheODYN II that you benchmark and benchmarked 13 at, and you apply that And then you apply ODYN 14 there with at Brunswick 15 these transient 16 you make you can make 17 And you say, that And then you can say that the 18 bank.

band.

21 Al! I-22 says say 23

said, said:

1535 1

is what they said, we agree We (NRC) agree to what they (Entergy)

H 1 said 3

15 NED 241 N ED241-54-A 20 item 01 Exhibit I 1536 13 H-OPENFELD HOPENFELD 1538 3

largetnsient testing exhibit 3 Large Transient Testing-Exhibitl 22 EPU EPU 23 What they They 25 statement Statement means.

1539 7

into to 9

what what is 12 Because as it was-okay

Okay, 16 it them 1540 5

difference difference, 9

originally Oiginaly 15 And they said, the And they (NRC) said the code 16 this is not conservative. These is not conservative. These differences differences are in represent 17 error errors 19 say this code is or say that this code is conservative, 20 say exatly they say this exct. They 22 some few data data in 25 one has to be conservative, 1541 2

first ofal, is to first 3

parameters we are interested parameters that we ame interested in 5

the pressure, and you can see 6

te pressure, they compared and 7

pressure pressure, and 11 by with 12 they can put confidence of on X you can put a confidence of x sigmas on the number of signals on the 13 Confidence of the 14 it ODYN 23 because they Because they (NRC) 24 Arnd 1542 1

the 4

2 Oneof for 3

that analysis that 5

o-riginal intent of the code, to predi( original intent of the code, to predict that 6

parameter, is 7

Critical power ratio for those that The Critical Power Ratio, for those that this a

its is 9

of the in the fuel 15 like like away 17 potential for a melt a potential for a fuel melt Is a safety, a safety issue, 19 to that into 1543 1

that this 3

comparison co"mpal of the data, 5

frequency frequency 1544 1

for for the 1545 3

Because the heart to your question s Because the heart of the answer to your

_________________question is 5

to, so I to explamnsome of those termss othatlI 6

what what are 7

explain some of those terms 9

C and one is the Cand the other one 11 uncertainW.

uncertainties.

12 One One, Co, 14 VJ Vi 16 at by 17 is changeis 21 C

Co 22 that subzero V

1546 10 kind of information boiling II would affect, 12 mechanism void Mechanism of void formation 20 they've they've (GE) 1547 1

that so 5

5 in different plants, the only way I from different plants. The only way I know know to make the how 6

thing, to formalize this experience, to formalize this experience, is to use a is to take a 7

computer and these Computer code. These plants g

sitting 9

here 10 fuel level go fuel level in a tank goes 12 has differences, is different 13 to do, analyze the to analyze each 19 not abnormalities between no abnormalities in 23 what abnormality is what is an abnormality 1543 1

be if an enormous be: ifat 2

in into 4

into. transition into transition 8

statement to say, statements as 9

anything herr, therefor t

ferefre 11 would look at, 12 put an uncertainty study on perform an uncertainty study in 13 one.

Case.

1549 17 question, abnormality question by referring to the word "abnormality-.

is they haven't seen any problem. Thi They have not seen any problem, that 20 You see abnormality Do you see abnormality?

21 fuel 1550 1

what what was 2

was 4

just-th-energy the 12 gone to evaluated 15 it here Them somewhere else.

17 Brunswick, of Brumswick, or 20 different different, 24 because this has a dryer, plus both plants have dryers. Plus, 25 modified modified it 1551 3

in,in into 6

Respectfully submitted:

BY:

G

=O Raypr

o.
Sea, pro Se ve P.O. Box 98 (Express delivery. Shadis Road)

Edgecomb, ME 05446 (207) 882-7801 shadiscprexar.com 7

I UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ENTERGY NUCLEAR VERMONT YANKEE LLC and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

Docket No. 50-271OLA ASLBP No. 04-832-02-OLA CERTIFICATE OF SERVICE I hereby certify that copies of NEW ENGLAND COALmON'S PROPOSED CORRECONS TO THE TRANSCRIPT FOR EVIDENTIARY HEARINGS OF SEPTEMBER 13,14,2006 in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class; or by e-mail as indicated by a double asterisk (**), this 30& day of October, 2006.

Alex S. Karlin, Chair" Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nr.gov Dr. Anthony J. Baratta**

Adminisrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Lester S. Rubenstein" Administrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 E-mail: lesrrr@comcast.net Office of the Secretary**

ATTN: Rulemaking and Adjudications Staff Mail Stop: O-16CI U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HWEAIGDOCKET@nrc.gov Office of Commission Appellate Adjudication*

Mail Stop: O-16CI U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 John M. Fulton, Esq.

Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 8

Jay E. Silberg, Esq.**

Matias Travieso-Diaz, Esq.**

Pillsbury Winthrop Shaw PiUtman, LLP 2300 N St, NW Washington, DC 20037-1128 E-mmil: jay.silberg(pillsburylaw.com matias.travieso-diazi*pillsburylaw.com Jonathan M. Rund, Esq.**

Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mad: imr3a*

.jVv 4

Marcia Carpentier, Esq.**

Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-maik MhQTCý7.Wv)

Sherwin E. Turk, Esq.**

Richard Ennis, NRR, US NRC Office of the General Counsel Mail Stop 0-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Raymond Shadis Pro Se Representative New England Coalition 9

UNITED STATES NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of October 30, 2006 ENTERGY NUCLEAR VERMONT YANKEE, LLC Docket No. 50-271 and ENTERGY NUCLEAR OPERATIONS, INC.

(Vermont Yankee Nuclear Power Station)

ASLBP No. 04-832-02-OLA Office of the Secretary ATTN. Rulemaking and Adjudications Staff Mail Stop: 0-16C1I U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Rulemaking and Adjudications Staff,

Please find for filing in the above captioned matter one original and two copies of NEW ENGLAND COALiTION'S PROPOSED CORRECTONS TO THE TRANSCRIPT FOR EVIDENTIARY HEARINGS OF SEPTEMBER 13,14,2006 Thank you for your kind assistance in making this filing, Raymond Shadis Pro se Representative New England Coalition Post Office Box 98 Edgecomb, Maine 04556 207-882-7801 shadis(2prexar.com