ML063050250
Jump to navigation
Jump to search
| ML063050250 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/27/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| Wengert, Thomas | |
| Shared Package | |
| ml062220662 | List: |
| References | |
| TAC MC8970 | |
| Download: ML063050250 (1) | |
Text
ECCW System 3.7.10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify each required ECCW subsystem manual, 31 days power operated, and automatic valve in the fl-ow path, that is not locked, sealed, or otherwise secured in position, is in the correct position or can be aligned to the correct position.
SR 3.7.10.2 Verify each ECCW subsystem actuates on an 24 months actual or simulated initiation signal.
I PERRY - UNIT 1 3.7-20 Amendment No.1 3 9