Entergys Initial Disclosures
ML063050134
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/23/2006
From: Doris Lewis
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-LR, ASLBP 06-849-03-LR, RAS 12446
Download: ML063050134 (10)


Text

X-R'45 1,?44ýo

§MTn'MVT7a0Mff=

October 23, 2006 UNITED STATES OF AMERICA

  • NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board DOCKETED USNRC October 24, 2006 (7:50am)

OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF In the Matter of

))

Entergy Nuclear Vermont Yankee, LLC

)

and Entergy Nuclear Operations, Inc.

)

)

(Vermont Yankee Nuclear Power Station)

)

Docket No. 50-271-LR ASLBP No. 06-849-03-LR ENTERGY'S INITIAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336(a), Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. ("Entergy") hereby make the following initial disclosures.

1. Testifying Witnesses Entergy has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. Persons currently employed by Entergy, its affiliates, or its contractors upon whose opinions Entergy bases its position on the admitted contentions are identified below. None of these individuals has yet been asked to provide an analysis responding to the admitted contentions:

Name Alan Cox Floyd T.

Underkoffler Abdolreza Ahrabli Lynn DeWald Mark Mattson Affiliation Entergy Entergy Entergy Entergy Normandeau & Assoc.

Telephone 479-858-3173 802-451-3069 479-858-5342 802-258-5526 603-472-5191 Contention DPS 1 DPS 1 DPS 1 NEC I NECI

--re/y\\p (a&fe =.5isc V-O3-

Craig Swanson Applied Science Associates 401-789-6224 NEC 1 Jim Fitzpatrick Entergy 802-451-3086 NEC 2, NEC 4 Ron Finnan Areva 352-746-2698 NEC 2 Ricco Betti Betti Inc.

508-865-1679 NEC 3 Jim Rogers Entergy 802-451-3032 NEC 3 JeffHorowitz Self employed.

760-747-1397 NEC 4 In accordance with 10 C.F.R. § 2.336(b), Entergy will supplement this disclosure after testifying witnesses are identified.

2. Documents and Data Compilations Documents and data compilations that are relevant to DPS Contention 1 and NEC Contentions 1 through 4, and that are not privilegedor otherwise subject to protected status, are being provided on compact disks to the DPS, NEC, and NRC Staff. Attachment 1 provides a description and location of additional documents, or categories of documents, that have been identified by Entergy as relevant to these contentions, but have not yet been provided on compact disks.
3. Tangible Things.

Other than documents provided or listed, no relevant tangible things have been identified.

4. Privilege Log Lists of documents that are privileged, or that have protected status because they contain proprietary information, are being provided to DPS, NEC, and the NRC Staff, with a copy to the Licensing Board, under separate cover. Except for certain privilege logs related to the thermal discharge issue that were previously prepared in another proceeding, these lists do not include (1) communications that originated from counsel to the client, or from the client to counsel, 2

when no outside person was included, or (2) documents as to which the attorney work-product privilege is asserted when the documents are authored by counsel. Upon issuance by the Board of an appropriate protective order, such as the March 1, 2005 order in the Extended Power Uprate proceeding, Entergy is prepared to obtain the consent from the intellectual property owners to provide copies of proprietary documents to those parties and their representatives executing a suitable confidentiality agreement.

Respectfully Submitted, David R. Lewis Matias F. Travieso-Diaz PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, N.W.

Washington, DC 20037-1128 Tel. (202) 663-8474 Counsel for Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.

Dated: October 23, 2006 3

Additional Documents, or Categories and Locations, Relevant to the Admitted Contentions Relevant Document/Category Location Contention Specifications for.structural concrete for buildings, ACI-301 VYNPS DPS-1 Building Code Requirements for Reinforced Concrete, ACI-318-63 VYNPS DPS-1 LRPD-04 (Rev. 0), TLAA - Metal Fatigue, section 2.5.2 VYNPS NEC-2 NUREG-1801, Generic Aging Lessons Learned, Rev. 1 VYNPS NEC-2 GE Service Information Letter, SIL No. 408, Implementation of VYNPS NEC-2 Hydrogen Water Chemistry is Recommended in all BWRs, July 9, 1984.

26A6019 Revi - GE Reactor Vessel Specification for EPU.

VYNPS NEC-2 ERC 2002-026-SAI - Engineering Record Correspondence for VYNPS NEC-2 FatiguePro ERC 2003-070 - Engineering Record Correspondence for VYNPS NEC-2 Feedwater Nozzle Analysis ERC 2002-036 Rev 5 Engineering Record Correspondence for GE VYNPS NEC-2 EPU Analyses.

GE RPV Design Report - Original Reactor Vessel Design Report VYNPS NEC-2 VY FW addenda 1971 VYNPS NEC-2 Addendum to GE Vessel Design Report Vermont Yankee Reactor Vessel Stress Report 9-6201-1 by VYNPS NEC-2 Chicago Bridge and Iron.

Note: Original Vessel Stress Report is available on microfilm and old hardcover binders in storage. This document will be available for viewing onsite only.

Sections $4/T4 for feedwater nozzle from Original CB&I Stress VYNPS NEC-2 Analysis for Reactor Vessel VYC-378 RevO (cycle limits)

VYNPS NEC-2 VYC-378 Revl (cycle limits)

Rx Vessel Cycle Limits Calculation Excerpts from Sandia Las Report SAN 94-0187, UC-523 August VYNPS NEC-2 1994 VYM 2002-006, FatiguePro Project Plan VYNPS NEC-2 BWRVIP letter (EPRI letter 2005-271), Potential Error in Existing VYNPS NEC-2 Fatigue Reactor Water Environmental Effects Analysis, July 2, 400470113v]

Relevant Document/Category Location Contention 2005 AMRM-32 (Rev. 0), Aging management review of the Reactor VYNPS NEC-3 Vessel Internals, 2.2.12, 3.1.3, 3.4, and Att. 1 BWRVIP-06A, Safety Assessment of BWR Reactor Internals EPRI VYNPS NEC-3 Report 1006598, March 2002 NRC letter, G.C. Lainas to C. Terry, BWRVIP Chairman, Safety VYNPS NEC-3 Evaluation of the BWR Vessel and Internals Project BWRVIP-06 Report (TAC No. M93936), 15 September 1998 GE Specification 21A3317, Revision.0, 6/16/66, Standard VYNPS NEC-3 Requirements for Steam Dryer Units Nondestructive Examination Standards, Technical Basis and VYNPS NEC-3 Development of Boiler and Pressure Vessel Code, ASME Section XI, Division 1, EPRI-NP-1406-SR, May 1980 GE Services Information Letter (SIL) Number 644, Supplement 1, VYNPS NEC-3 BWRJ3 Steam Dryer Integrity, September 5, 2003 Remainder of documents comprising VYC-3001, "EPU Steam VYNPS NEC-3 Dryer Acceptance Criteria" E-mail messages from or to Enrico Betti relating to the steam dryer VYNPS NEC-3 DP 4023, Plant Implementation VYNPS NEC-4 NE 8053, UT Thickness VYNPS NEC-4 ENN-CS-S-008 Rev.0, Structural Evaluation VYNPS NEC-4 ENN-NDE-9.05 UT Thickness VYNPS NEC-4 VY-RPT-05-00012, Rev. 0 VYNPS NEC-4 VY Small Bore Piping Database Rev. 0 VYNPS NEC-4 VY Small Bore Piping Database Rev. 1 VYNPS NEC-4 Scoping Worksheets for 2007 RFO in file: FAC Scoping VYNPS NEC-4 Worksheets RF026.pdf Scoping Worksheets and Scope Memos for 2005 in file: "FAC VYNPS NEC-4 2005 Refueling Outage Program Records" Scoping Worksheets and Scope Memos for 2004 in file: "FAC VYNPS NEC-4 2004 Refueling Outage Program Records" Scoping Worksheets and Scope Memos for 2002 in file: "FAC VYNPS NEC-4 2002 Refueling Outage Program Records" Scoping Worksheets and Scope Memos for 2001 in file: "FAC VYNPS NEC-4 2

400470113vl

Relevant Document/Category Location Contention 2001 Refueling Outage Program Records" Inspection Reports for 2005 in file: "FAC 2005 Refueling Outage VYNPS NEC-4 Program Records" Inspection Reports for 2004 in file: "FAC 2004 Refueling Outage VYNPS NEC-4 Program Records" Inspection Reports for 2002 in file: "FAC 2002 Refueling Outage VYNPS NEC-4 Program Records" Inspection Reports for 2001 in file: "FAC 2001 Refueling Outage VYNPS NEC-4 Program Records" Flow Accelerated Corrosion on Power Plants Revision 1, EPRI TR-VYNPS NEC-4 106611-Ri © 1998 Electric Power Research Institute.

1996 EPRI CHECWORKS Models & Results VYNPS NEC-4 1996 EPRI CHECWORKS DATABASE VYNPS NEC-4 EPRI CHECWORKS Wear Rates Cycles 20&21 VYNPS NEC-4 2001 EPRI CHECWORKS DATABASE VYNPS NEC-4 EPRI CHECWORKS Wear Rates Results Cycle 22b VYNPS NEC-4 2006 EPRI CHECWORKS Wear Rate Results (cycle 25)

VYNPS NEC-4 (Preliminary)

VY Responses to Operational Experience (OE) PCRS VYNPS NEC-4 commitments Responses to:

LO-OEN-2004-00272-CA3 (Mihama Event)

LO-OEN-2004-00328-CA9 (Mihama Event LO-OEN-2006-00122 IN 2006-08 (IN 2006-08)

Statement Relating to the Experience of Jeff Horowitz VYNPS NEC-4 3

400470113vl

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of

))

Entergy Nuclear Vermont Yankee, LLC

)

Docket No. 50-271 -LR and Entergy Nuclear Operations, Inc.

)

ASLBP No. 067849-03-LR

)

(Vermont Yankee Nuclear Power Station)

)

Certification of Initial Disclosure Affidavit of H. Michael Metell County of Windham

)

)

SS.

State of Vermont

)

I, H. Michael Metell, being duly sworn, state:

I am the License Renewal Project Manager for Entergy Nuclear Operations, Inc. My

.business address is 320 Governor Hunt Road,-P.O. Box 250, Vernon, VT 05354. I am authorized to provide this certification, pursuant to 10 C.F.R. § 2.336(c), on behalf of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. ("Entergy").

To the best of my knowledge, information and belief, the initial disclosures in the above captioned proceeding contain all materials required to be disclosed by 10 C.F.R. § 2.336(a) that were identified as relevant to the admitted contentions through a search of the information and documentation reasonably available toEntergy.

Further; to the best of my knowledge, information and belief, and based representations of personnel who were instructed to perform a diligent search, these disclosures are to accurate and complete as of this date.

Further the affiant sayeth not.

H. Michael Metell Subscribed and sworn to before me this _3 day of October, 2006 Notary PAW My commission expires: A-//o/0 )

COAF 2

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensin2 Board In the Matter of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc.

(Vermont Yankee Nuclear Power Station)

)

)

)

)

Docket No. 50-271-LR ASLBP No. 06-849-03-LR CERTIFICATE OF SERVICE I hereby certify that copies of"Entergy's Initial Disclosures" dated October 23, 2006, were served on the persons listed below by deposit in the U.S. Mail, first class, postage prepaid, and where indicated by an asterisk by electronic mail, this 2 3rd day of October, 2006.

  • Administrative Judge Alex S. Karlin, Esq., Chairman Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ask2@nrc.gov
  • Administrative Judge Dr. Thomas S. Elleman Atomic Safety and Licensing Board 5207 Creedmoor Road, #101, Raleigh, NC 27612.

tse@nrc.gov; elleman@eos.ncsu.edu Office of Commission Appellate Adjudication Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

  • Administrative Judge Dr. Richard E. Wardwell Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 rew@nrc.gov
  • Secretary Att'n: Rulemakings and Adjudications Staff Mail Stop 0-16 Cl U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 secy@nrc.gov, hearingdocketknrc.gov Atomic Safety and Licensing Board Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 400470113vl
  • Mitzi A. Young, Esq.
  • Steven C. Hamrick, Esq.
  • David E. Roth, Esq.

Office of the General Counsel Mail Stop 0-15 D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 maygnrc.gov; schlnrc.gov; der@nrc.gov

  • Anthony Z. Roisman, Esq.

National Legal Scholars Law Firm 84 East Thetford Road Lyme, NH 03768 aroismaannationallegal scholars.com

  • Sarah Hofmann, Esq.

Director of Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 Sarah.hofmann@state.vt.us

  • Ronald A. Shems, Esq.
  • Karen Tyler, Esq.

Shems, Dunkiel, Kassel & Saunders, PLLC 9 College Street Burlington, VT 05401 rshems@sdkslaw.com ktyler@sdkslaw.com David R. Lewis 400470113vl