ML063000425
| ML063000425 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/16/2006 |
| From: | Rice T State of NY, Dept of Environmental Conservation |
| To: | James Adler Entergy Nuclear Operations, Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2006-0314 | |
| Download: ML063000425 (2) | |
Text
iJohn W7hite-Pump T Page From:
"Timothy Rice" <tbrice@gw.dec.state.ny.us>
To:
"Joseph J. Adler" <jadler@entergy.com>
Date:
08/16/2006 3:11:11 PM
Subject:
Pump Test Hello Jay, We understood that Entergy would be providing DEC and NRC with the draft plans for the pumping test @ RW-1 prior to finalizing it. We recently received the "Hydraulic Control Plan" and are reviewing it, but as of yet have not received anything describing the pumping test. Can you find out what the status of this plan is and share it with us and the NRC as soon as it is ready for us? If I remember correctly, Entergy was planning to do the test either late this month or early next, month, so time is getting short.
- Thanks, Tim CC:
"John White" <JRW1 @nrc.gov>
q6
ýJoh n Whit-eý-fTEXT-htm Pageli*I Hello Jay, We understood that Entergy would be providing DEC and NRC with the draft plans for the pumping test @ RW-1 prior to finalizing it. We recently received the "Hydraulic Control Plan" and are reviewing it, but as of yet have not received anything describing the pumping test. Can you find out what the status of this plan is and share it with us and the NRC as soon as it is ready for us? If I remember correctly, Entergy was planning to do the test either late this month or early next month, so time is getting short.
- Thanks, Tim