MONTHYEARML0613100842006-05-0808 May 2006 License Amendment Request Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr), Project stage: Other ML0629700432006-10-0606 October 2006 10/6/2006 E-Mail to M. Crawford and R. Byrd, Entergy Operations, Inc., from B. Vaidya, DORL/LPL4/PM - Draft Request for Additional Information Project stage: Draft RAI ML0632400982006-11-16016 November 2006 Supplement to Amendment Request Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). Project stage: Supplement ML0703004252007-02-22022 February 2007 Tech Spec Pages for Amendment 173 Regarding Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). Project stage: Other ML0703004112007-02-22022 February 2007 Issuance of License Amendment 173 Regarding Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr). Project stage: Approval GNRO-2006/00015, Report of Changes and Errors to 10CFR50.462007-10-25025 October 2007 Report of Changes and Errors to 10CFR50.46 Project stage: Other 2006-05-08
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23335A0652023-12-0101 December 2023 NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23191A2802023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML23191A8662023-07-10010 July 2023 NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors ML23116A1462023-04-26026 April 2023 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23009B6912023-01-0909 January 2023 NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines ML22353A6122022-12-19019 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22173A0372022-06-21021 June 2022 NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 ML22075A3692022-03-0303 March 2022 Email Grand Gulf 2022 PI&R Request for Information ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21165A1352021-06-14014 June 2021 NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21109A2142021-04-19019 April 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21109A2132021-03-23023 March 2021 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML21068A4092021-03-0909 March 2021 NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control ML21015A3452021-01-14014 January 2021 NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20352A1192020-12-10010 December 2020 Email from Thomas Saporito 12-10-20 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email ML20323A4162020-11-18018 November 2020 Response to Choice Letter (EA-20-094) ML20337A2712020-11-0909 November 2020 Email - Grand Gulf Nuclear Station 050-00416, Requested Regulatory Conference ML20289A3542020-10-14014 October 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of TSTF-563 LAR, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20260H4422020-09-0808 September 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Official RAIs for RR Associated with Updating ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20176A4832020-06-22022 June 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of Relief Request Associated with ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years ML20097B8032020-04-0303 April 2020 NRR E-mail Capture - Grand Gulf - Acceptance Review for the Exigent LAR Associated with One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies from 11.5 Years to 13.5 Years ML20093C3072020-04-0101 April 2020 NRR E-mail Capture - (External_Sender) Entergy Fleet - Performance-Based Cyber Security Testing Plan Fee Waiver Response Letter (EPID P-2020-PRF-0000; CAC No. 001648) ML20079D9302020-03-19019 March 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20076B6322020-03-16016 March 2020 NRR E-mail Capture - Grand Gulf - Acceptance Review for the LAR Associated with Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies ML20057G1752020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems ML20057G1592020-02-24024 February 2020 NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Acceptance Review of LAR Associated with TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML19242C0122019-08-29029 August 2019 2.206 Petitioner (No Public Meeting Required) ML19339H4362019-08-26026 August 2019 Request for Information IR 05000416/2019-004 ML19115A3512019-04-25025 April 2019 LTR-19-0177 Tom Gurdziel, E-mail a Matter of Fairness Entergy Grand Gulf Seems to Be Running Rather Steadily at 100 Percent ML19151A3312019-04-0303 April 2019 (OEDO-19-00053)10 CFR 2.206 Petition Involving Grand Gulf Nuclear Station ML19095B7622019-04-0303 April 2019 Acceptance Review Results for License Amendment Request to Adopt TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio), for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1 (EPID L-22019-LLA-0051) ML19078A3772019-03-19019 March 2019 NRR E-mail Capture - Grand Gulf - Official Rais for Relief Request GG-ISI-023, Inservice Inspection Impracticality, Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML19059A0292019-02-27027 February 2019 NRR E-mail Capture - Acceptance Review Results for License Amendment Request to Adopt TSTF-529, Revision 4, Clarify Use and Application Rules, for Entergy Fleet ML19053A7622019-02-22022 February 2019 NRR E-mail Capture - Grand Gulf - Acceptance of the LAR Associated with Revising TS 3.3.1.1 (RPS Instrumentation) and TS 3.3.4.1 (EOC-RPT Instrumentation) ML19044A7352019-02-13013 February 2019 NRR E-mail Capture - 10 CFR 2.206 Petition Involving Grand Gulf Nuclear Station - Acknowledgement Email (OEDO-19-00053) ML19045A0072019-02-13013 February 2019 NRR E-mail Capture - 10 CFR 2.206 Petition Involving Grand Gulf Nuclear Station - Acknowledgement Email (OEDO-19-00053) 2023-08-28
[Table view] |
Text
From: Bhalchandra Vaidya To: MCRAWF1@entergy.com; RBYRD@entergy.com Date: 10/6/2006 4:27:57 PM
Subject:
Grand Gulf, MD1496, Draft RAIs
- Ron, The following are the draft RAIs on the application for a license amendment referenced.
I WOULD LIKE TO ARRANGE A TELECONF. TO DISCUSS THESE RAIs IN THE WEEK OF October 16, 2006. PLEASE LET ME KNOW THE CONVENIENT DATES AND TIMES FOR YOU.
- Thanks,
===========
REQUEST FOR ADDITIONAL INFORMATION RELATING TO AMENDMENT REQUEST TO LICENSE NO. NPF-29, TAC NO. MD1496 ENTERGY OPERATIONS, INC.
GRAND GULF NUCLEAR STATION UNIT 1 DOCKET NO. 50-416
- 1. As specified in the Generic Letter 88-16, the analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC in identifying the Topical Report(s) by number, title, and date, or identifying the staffs safety evaluation report for a plant-specific methodology by NRC letter and date. For each reference listed in TS 5.6.5.b, please clarify which parameter in TS 5.6.5.a is supported.
- 2. It appears that the core loading for Cycle 16 will be FRA-ANP ATRIUM 10 fuel, however, NEDE-24011-P-A, which is a GE license topical report (LTR), is listed under TS 5.6.5.b.24.
Please provide the reason why TS 5.6.5.b.24 - a GE LTR is still listed in the COLR.
- 3. With respect to the use of the proposed EXEM BWR-2000 model, please provide: (1) the detailed explanation why the increase in PCT is beyond 50 Busing the proposed EXEM BWR-2000 model. Since the 98 B PCT increase is a significant increase above the 50 B a more detailed explanation is required; (2) the reason that an increase in PCT of 98 B due to changing the old EXEM BWR model to EXEM BWR-2000 model in the Grand Gulf LOCA analysis does not impact the current MCPR Safety Limits; (3) justification as to why a lower MCPR input at the start of the event is assumed for EXEM BWR-2000 evaluation model; and (4) the actions to be taken if the assumption of a lower MCPR input at the start of the event is not met.
Bhalchandra Vaidya NRR/DORL/LPL-IV/PM 301-415-3308 M/S: O-7D1 CC: Gregory Cranston; Hearn, Peter; Tai Huang; Terao, David; Tjader, Theodore Mail Envelope Properties (4526BC4D.DD9 : 10 : 35718)
Subject:
Grand Gulf, MD1496, Draft RAIs Creation Date 10/6/2006 4:27:57 PM From: Bhalchandra Vaidya Created By: BKV@nrc.gov Recipients entergy.com MCRAWF1 (MCRAWF1@entergy.com)
RBYRD (RBYRD@entergy.com) nrc.gov OWGWPO03.HQGWDO01 GVC CC (Gregory Cranston) nrc.gov
OWGWPO04.HQGWDO01 PCH CC (Peter Hearn)
TLH1 CC (Tai Huang) nrc.gov TWGWPO02.HQGWDO01 DXT CC (David Terao)