ML062960408

From kanterella
Jump to navigation Jump to search
Public Meeting Summary - Category One Regulatory Conference Meeting for Turkey Point Nuclear Plant
ML062960408
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/23/2006
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
Shared Package
ML062960400 List:
References
IR-06-016
Download: ML062960408 (5)


Text

October 23, 2006 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE REGULATORY CONFERENCE MEETING - TURKEY POINT NUCLEAR PLANT, DOCKET NO.

05000250

Dear Mr. Stall :

This refers to the Regulatory Conference meeting conducted at your request at the Region II Office in Atlanta, Georgia on October 10, 2006. The purpose of the meeting was to discuss Turkey Point Unit 3 loss of residual heat removal event on March 8, 2006. Note that the briefing materials presented by Florida Power and Light Company (FPL) contained some FPL proprietary information. Enclosed are a list of attendees and FPLs non-proprietary version of presentation slides.

The discussions focused on the following topics: An overview of the event, Event Description, Corrective actions, Thermal Hydraulic Analysis of Event, Mitigating Actions, and SDP Analysis.

During the conference, Florida Power and Light Company (FPL) agreed that a violation of NRC requirements occurred and stated that corrective actions have been taken to prevent recurrence. FPL also stated that their SDP evaluation concluded that the change in core damage frequency for this event is less than 1.0E-6/yr. FPL committed to submit additional technical information to NRC for review. Results of NRCs review and decision will be discussed in Inspection Report 05000250/2006016.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

CP&L 2 Should you have any questions concerning this meeting, please contact Mr. Son Ninh at (404) 562-4532.

Sincerely,

\RA\

Joel T. Munday Reactor Projects Branch 3 Division of Reactor Projects Docket No.: 50-250 License No: DPR-31

Enclosure:

1. List of Attendees
2. Licensees Presentation Slides

ML062960408 OFFICE RII:DRP SIGNATURE SON NAME SNinh DATE 10/20/2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 10/ /2006 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 3 cc w/encl:

T. O. Jones Attorney General Site Vice President Department of Legal Affairs Turkey Point Nuclear Plant The Capitol Florida Power and Light Company Tallahassee, FL 32304 Electronic Mail Distribution William A. Passetti James Connolly Bureau of Radiation Control Licensing Manager Department of Health Turkey Point Nuclear Plant Electronic Mail Distribution Florida Power and Light Company Electronic Mail Distribution Alejandro Sera Miami-Dade County Becky Ferrare Emergency Management Coordinator Licensing Department Administrator Electronic Mail Distribution Turkey Point Nuclear Plant Florida Power and Light Company County Manager Electronic Mail Distribution Metropolitan Dade County 111 NW 1st Street, 29th Floor Michael O. Pearce Miami, FL 33128 Plant General Manager Turkey Point Nuclear Plant Craig Fugate, Director Florida Power and Light Company Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution William E. Webster, Vice President Nuclear Operations Curtis Ivy Florida Power & Light Company City Manager of Homestead Electronic Mail Distribution Electronic Mail Distribution Mark Warner, Vice President Distribution w/encl: (See page 3)

Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution

CP&L 4 Letter to Mr. J. A. Stall from Joel T. Munday dated October 23, 2006.

SUBJECT:

PUBLIC MEETING

SUMMARY

- CATEGORY ONE REGULATORY CONFERENCE MEETING - TURKEY POINT NUCLEAR PLANT, DOCKET NO.

05000250 Distribution w/encl:

B. Moroney, NRR C. Evans (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC

LIST OF ATTENDEES Nuclear Regulatory Commission W. Travers, Regional Administrator, Region II (RII)

C. Casto, Director, Division of Reactor Projects (DRP), RII J. Shea, Director, Division of Reactor Safety (DRS), RII J. Munday, Chief, Reactor Projects Branch 3, DRP, RII M. Ernstes, Chief, Reactor Project Branch 1, DRP, RII S. Stewart, Senior Resident Inspector, Turkey Point W. Rogers, Senior Reactor Analyst, DRS, RII S. Sparks, Senior Enforcement Specialist, EICS, RII D. Solorio, Section Chief, Enforcement Policy and Program Oversight Section, Office of Enforcement (OE)

L. Trocine, Senior Enforcement Specialist, OE M. Franovich, Chief, PRA Operational Support & Maintenance Branch, Office of Nuclear Reactor Regulation (NRR)

M. Pohida, Senior Reactor Analyst, NRR S. Crane, NRR M. Vaaler, NRR NRC (via teleconference)

B. Moroney, NRR S. Wong, Senior Reactor Analyst, NRR J. Kramer, NRR J. Circle, NRR R. Pascarelli, NRR A. Zoulis, NRR J. Mitman, RES Florida Power and Light Company J. Stall, Chief Nuclear Officer, FPL T. Jones, Site Vice President, Turkey Point R. Kundalkar, Vice President, Nuclear Engineering, Juno Beach M. Pearce, Plant Manager, Turkey Point S. Greenlee, Engineering Manager, Turkey Point J. Garcia, Reliability Risk Management Manager, Juno Beach C. Guey, Supervisor, Reliability Risk Management, Juno Beach J. Connolly, Licensing Manager, Turkey Point M. Ross, Associate General Counsel, Juno Beach M. Pope, Numerical Applications, Inc.

T. Timmons, Westinghouse D. True, ERIN