Regulatory Commitment to the Response to Generic Letter 2003-01 - Control Room Habitability
ML062960230
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 10/20/2006
From: Grissette D
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-03-001, NL-06-2378
Download: ML062960230 (4)


Text

Don E. Grissette Vice President Southern Nuclear Operating Company, Inc.

40 lnverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel205.992.6474 Fax 205.992.0341 October 20, 2006 Energy to Serve Your World" Docket Nos.:

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Regulatory Commitment to the Response to Generic Letter 2003 Control Room Habitability Ladies and Gentlemen:

On June 12,2003, the NRC issued Generic Letter (GL) 2003-01, "Control Room Habitability," requesting the submittal of information that demonstrates that the control room at each plant complies with the respective plant's current design and licensing bases and applicable regulatory requirements, and that suitable design, maintenance, and testing control measures are in place to ensure continued compliance. By letter dated August 4, 2003, Southern Nuclear Operating Company (SNC) submitted a proposed alternative course of action, including a schedule and associated justification, for developing responses to GL 2003-01 information requests. Letter dated June 16,2004 provided SNC's response to GL 2003-01 information requests for the Vogtle Electric Generating Plant (VEGP).

During a telephone call on October 12,2006, the NRC asked SNC to commit in writing the action to submit a proposed license amendment following NRC approval of the Technical Specification Task Force (TSTF) - 448. This letter is to inform the NRC that SNC is making a regulatory commitment to complete this action.

(Affirmation and signature are on the following page.)

U. S. Nuclear Regulatory Commission NL-06-2378 Page 2 Mr. D. E. Grissette states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

The NRC commitment contained in this letter is provided as a table in Enclosure 1. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Don E. Grissette Sworn to and subscribed before me this 20

  • day of hkcb& fl

, 2006.

Notary Public MY commission expires:,7-5-U7U/O

Enclosure:

Regulatory Commitment cc:

Southern Nuclear Ouerating Comvanv Mr. J. T. Gasser, Executive Vice President Mr. T. E. Tynan, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle State of Georgia Mr. L. C. Barrett, Commissioner - Department of Natural Resources

Enclosure Vogtle Electric Generating Plant Regulatory Commitment to the Response to Generic Letter 2003 Control Room Habitability Regulatory Commitment

Regulatory Commitment The following table identifies those actions committed by Southern Nuclear Operating Company in this document for Vogtle Electric Generating Plant. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

I Scheduled 1

Type One-Time

( Continuing Completion Date (If Required)

Commitment Submit license amendment after NRC approval of TSTF-448.

Action Compliance X