October 26, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 - REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE EXAMINATION RESULTS (TAC NO. MD2783)
Dear Mr. Kansler:
On June 14, 2006, Entergy Nuclear Operations, Inc. (Entergy), submitted the results of the Indian Point Nuclear Generating Unit Unit 2 steam generator tube examinations conducted during the spring 2006 refueling outage, as required by Technical Specification 5.5.7.f.2.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 12, 2006, the Entergy staff indicated that a response to the RAI would be provided within 60 days of the date of this letter.
Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-247
Enclosure:
RAI cc w/encl: See next page
- See memo dated 9/29/06 OFFICE LPL1-1/PM LPL1-1/LA CSGB/BC LPL1-1/BC NAME JBoska SLittle AHiser*
RLaufer DATE 10/25/06 10/25/06 9/29/06 10/26/06
Indian Point Nuclear Generating Unit No. 2 cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223
Indian Point Nuclear Generating Unit No. 2 cc:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524
Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE EXAMINATIONS ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247 On June 14, 2006, Angencywide Documents Access and Management System accession number ML061780303, Entergy Nuclear Operations, Inc. (Entergy), submitted the results of the Indian Point Nuclear Generating Unit 2 steam generator tube examinations conducted during the spring 2006 refueling outage, as required by Technical Specification 5.5.7.f.2. The Nuclear Regulatory Commission staff is reviewing the submittal and has the following questions:
1.
Section 2.a.7 of your report dated June 14, 2006, indicated that the inspection program for refueling outage (RFO) 17 consisted of special interest examinations of abnormal indications. Please discuss the results of any special interest examinations on these indications. In addition, discuss what constitutes an abnormal indication.
2.
Section 2.b, Secondary Side Examinations, states that the top support plate in steam generators (SGs) 23 and 24 were visually inspected. Please discuss the results of these visual inspections. If any degradation was found, please discuss the basis for the inspection scope.
3.
It is stated in Section 3.0 that the largest bobbin indication (28-percent) located at an anti-vibration bar (AVB) was confirmed to be single-sided wear by +PointTM examination.
Please discuss whether all AVB wear scars were inspected with a rotating probe to confirm that they were also single-sided wear. If any of these indications were not single-sided wear (e.g., row 36 column 44 in SG 22), please discuss the method used to size these indications. If a qualified sizing technique does not exist for wear indications that are not single-sided, please discuss your basis for leaving them in service (if any were left in service).
4.
Please discuss whether the low levels of primary-to-secondary leakage observed during prior cycles is still present.
5.
For the tubes identified with permeability variations, discuss whether these locations were inspected with a rotating probe (e.g., magnetically biased +PointTM probe) to confirm the absence of degradation at these locations. Please discuss whether the size of these permeability variations limit the ability to reliably inspect these locations. If so, discuss your long-term strategy for addressing these indications.
6.
In your February 13, 2006 (ML060530378), letter you indicated that you would be performing primary side visual inspections and that you would be inspecting the top of the flow distribution baffle in all 4 SGs. Please discuss the results of these inspections.