October 19, 2006 Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
SUBJECT:
ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO NRC LETTER STATUS OF CONFIRMATORY ACTION LETTER INSPECTIONS, DATED AUGUST 31, 2006
Dear Mr. Pearce:
This acknowledges receipt of your letter dated October 17, 2006, which responded to the Nuclear Regulatory Commissions letter entitled Status of Confirmatory Action Letter Inspections, dated August 31, 2006. We have reviewed your response and understand that FENOC is prepared for the upcoming scheduled Confirmatory Action Letter (CAL) followup inspections that will review the effectiveness of your actions to address Human Performance, Corrective Action Program Implementation and Maintenance Procedure Adequacy. We have no further questions at this time.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:
See next page
Mr. L. William Pearce Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A290 Perry, OH 44081-0097
SUBJECT:
ACKNOWLEDGMENT OF RECEIPT - FENOC RESPONSE TO NRC LETTER STATUS OF CONFIRMATORY ACTION LETTER INSPECTIONS, DATED AUGUST 31, 2006
Dear Mr. Pearce:
This acknowledges receipt of your letter dated October 17, 2006, which responded to the Nuclear Regulatory Commissions letter entitled Status of Confirmatory Action Letter Inspections, dated August 31, 2006. We have reviewed your response and understand that FENOC is prepared for the upcoming scheduled Confirmatory Action Letter (CAL) followup inspections that will review the effectiveness of your actions to address Human Performance, Corrective Action Program Implementation and Maintenance Procedure Adequacy. We have no further questions at this time.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-440 License No. NPF-58 DISTRIBUTION:
See next page DOCUMENT NAME:C:\\FileNet\\ML062920279.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RRuiz:dtp EDuncan DATE 10/19/06 10/19/06 OFFICIAL RECORD COPY
L. Pearce cc:
G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer - FENOC D. Pace, Senior Vice President, Fleet Engineering - FENOC J. Rinckel, Vice President, Fleet Oversight Director, Site Operations Director, Regulatory Affairs Manager, Fleet Licensing Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Public Utilities Commission of Ohio Ohio State Liaison Officer R. Owen, Ohio Department of Health
L Pearce DISTRIBUTION:
DXC1 TEB SJC4 RidsNrrDirsIrib GEG KGO MEF1 DRPIII DRSIII PLB1 TXN