Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 October 8, 2006 A SCANA COMPANY RC-06-0182 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Dear Sir/Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)

DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 RESPONSE TO NRC GENERIC LETTER 96-06:

ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS - CHANGE TO COMMITMENT IMPLEMENTATION SCHEDULE

Reference:

Jeffrey B. Archie (SCE&G) Letter to Document Control Desk (NRC), "Response to NRC Request for Additional Information Regarding SCE&G Response to Generic Letter 96-06," RC-05-0204, December 12, 2005 The U. S. Nuclear Regulatory Commission (NRC) issued Generic Letter 96-06 on September 30, 1996, with supplement issued on November 13, 1997, to notify licensees of the potential for cooling water systems serving containment air coolers to be exposed to waterhammer, two-phase flow during accident conditions, and thermal overpressure. The generic letter requested information that demonstrated that plant design could accommodate these events or provide information on actions the licensee would take to address the generic letter concerns.

South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, submitted responses as identified in the referenced document to address the requested information.

In the referenced letter, SCE&G committed to implementation of plant modifications during the VCSNS refueling outage (RF-16) scheduled for October, 2006. This schedule was structured based on modification design being complete, including all necessary planning, prefabrication, needed materials and personnel resources available and dedicated to the planned modification.

Due to vendor delays, reduced personnel resources, and other challenging plant modifications being implemented during RF-16, SCE&G has determined that implementation of the modification should be deferred until the subsequent VCSNS refueling outage (RF-17) scheduled for Spring 2008.

4or7Zý SCE&G I Virgil C. Summer Nuclear Station *.0. Box 88. Jenkinsville, South Carolina 29065

  • T (803) 345.5209 -www.scana.com

Document Control Desk Letter C-02-3455 RC-06-0182 Page 2 of 2 VCSNS Management met with NRC VCSNS Project Management and the Generic Letter 96-06 technical reviewers on September 13, 2006, where continued plant safety and implementation status was discussed. There are no safety concerns related to this schedule change.

Should you have questions, please call Mr. Robert Sweet at (803) 345-4080.

I certify under penalty of perjury that the foregoing is true and correct.

Ixecuted on Jeffrey B.:Arie Vc President, Nuclear Operations JT/JBA/mb c:

K. B. Marsh S. A. Byrne N. S. Carns J. H. Hamilton R. J. White W. D. Travers R. E. Martin K. M. Sutton NRC Resident Inspector NSRC CER (C-02-3455)

File (815.14)

DMS (RC-06-0182)