ML062850050

From kanterella
Jump to navigation Jump to search
NRC Staffs Proposed Transcript Corrections
ML062850050
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/04/2006
From: Sherwin Turk
NRC/OGC
To:
Atomic Safety and Licensing Board Panel
Byrdsong A T
References
50-271-OLA, ASLBP 04-832-02-OLA, RAS 12344
Download: ML062850050 (8)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

ENTERGY NUCLEAR VERMONT YANKEE,

)

Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR

)

OPERATIONS, INC.

)

ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station)

)

NRC STAFFS PROPOSED TRANSCRIPT CORRECTIONS In accordance with the Licensing Boards Order of September 14, 2006, regarding the submission of transcript corrections (see Tr. 1609), the NRC Staff herewith provides, in Appendix A attached hereto, a list of its proposed corrections to the transcript of the evidentiary hearings held in this proceeding on September 13-14, 2006.

Respectfully submitted,

/RA/

Steven C. Hamrick Sherwin E. Turk Counsel for NRC Staff Dated at Rockville, Maryland this 4th day of October 2006

10/04/06 APPENDIX A NRC STAFFS PROPOSED CORRECTIONS TO THE TRANSCRIPT OF THE EVIDENTIARY HEARINGS HELD ON SEPTEMBER 13-14, 2006 PAGE / LINE DELETE INSERT Pg. 1105/Ln. 6 Scrinchi Screnci Pg. 1120 / Ln. 12 9:2619 Pg. 1124 / Ln. 15 made any made for any Pg. 1125 / Ln. 19 They MR. TURK: They Pg. 1126 /Ln. 19 XXXXquestion at 9:34 Pg. 1132/Ln. 20 transits transients Pg. 1135 / Ln. 13 and whether and see whether Pg. 1135 / Ln. 17 for opportunity of opportunity Pg. 1136 / Ln. 4 Staffs Staff has Pg. 1137 / Ln. 1 as identified is identified Pg. 1137 /Ln. 23 POP BOP Pg. 1146 / Ln. 1 it is not that is not Pg. 1363 / Ln. 2 regulation Regulation Pg. 1363 /

Ln. 20-21 office of nuclear reactor regulation Office of Nuclear Reactor Regulation Pg. 1364 /Ln. 9 Wallace Wallis Pg. 1364/ Ln. 20 CHAIR KARLIN MR. HAMRICK Pg. 1364/

Ln. 23-25 regulatory guide, RG 1.68, initial test programs for water cooled nuclear power plants Regulatory Guide, RG 1.68, Initial Test Programs for Water-Cooled Nuclear Power Plants Pg. 1365 / Ln. 7 is Office is an Office Pg. 1365 / Ln. 9 uprates Uprates Pg. 1367 / Ln. 13 J. Kay J. K.

Pg. 1368 / Ln. 8 Wancyk Wanczyk Pg. 1370 / Ln. 4 closing enclosing Pg. 1373 / Ln. 22 Staff 22 Staff Exhibits 22 Pg. 1383 / Ln. 6 substantive or substantive purpose or Pg. 1386 / Ln. 6 supplemental supplemental reload Pg. 1386 / Ln. 7 fig figure Pg. 1386 / Ln. 8 event the MSIV event Pg. 1387 / Ln. 10 of event of the event Pg. 1387 / Ln. 10 MSIV MSIVs Pg. 1387 / Ln. 12 MSIV MSIVs Pg. 1387 / Ln. 15 MSIV MSIVs Pg. 1387 / Ln. 16 FSO MSIVs Pg. 1387 / Ln. 18 go out go up Pg. 1387 / Ln. 21 pact fact Pg. 1387 / Ln. 24 MSIV MSIVs Pg. 1387 / Ln. 25 Its finite Its a finite Pg. 1388/ Ln. 1 scram will - - meanwhile scram will occur. Meanwhile Pg. 1388 / Ln. 5 the scram will.

the scram will be effective.

Pg. 1388 / Ln. 6-7 with an isolating with an isolated reactor Pg. 1388/ Ln. 11 ever every Pg. 1388/ Ln. 25 responds response Pg. 1389 / Ln. 2 field fuel Pg. 1389 / Ln. 8 perform transient perform a transient Pg. 1389 /Ln. 20

  • 4:53:45, (servers?),

the SRLR Pg. 1390 / Ln. 19

  • 4:55:23 at 125 occur at 125 Pg. 1390 / Ln. 20 to
  • that to occur at that Pg. 1391 / Ln. 9 faction fraction Pg. 1391 / Ln. 21 occurs occur Pg. 1391 / Ln. 24 design requirement requirement Pg. 1393 / Ln. 10 water feedwater Pg. 1397 / Ln. 7 clarity clarification Pg. 1398 / Ln. 16 SIP SRP Pg. 1398 / Ln. 20 that they that if they Pg. 1400 / Ln. 20 plants design scram the plants design is to scram Pg. 1401 / Ln. 14 where the test is, and whether this is what the test is, and whether it is Pg. 1401 / Ln. 25 10CFR50(34)B6-3 10 CFR 50.34(b)(6)(iii)

Pg. 1404 / Ln. 1 offers occurs Pg. 1406 / Ln. 7 generate a generator Pg. 1408 / Ln. 1 high riding hydriding Pg. 1408 / Ln. 21 high riding hydriding Pg. 1408 / Ln. 24 high riding hydriding Pg. 1409 / Ln. 3 would generate a or generator Pg. 1409 / Ln. 15 an EPU in EPU Pg. 1411 / Ln. 1 my sections section my sections section Pg. 1415 / Ln. 4 control controlled Pg. 1415 / Ln. 7 contains a has, for Pg. 1416 / Ln. 17 and the in the Pg. 1417 / Ln. 19 168... 168 1.68... 1.68 Pg. 1418 / Ln. 2 develop developed Pg. 1418 / Ln. 17 NSIB MSIV Pg. 1419 / Ln. 8 percent is percent versus Pg. 1420 / Ln. 24 important importance Pg. 1425 / Ln. 9 feed and condensate feedwater and condensate Pg. 1425/ Ln. 9-10

, you need continued Pg. 1425 / Ln. 22 balanced balance of Pg. 1429 / Ln. 3 tech and technical Pg. 1429 / Ln. 25 Travans Thomas Pg. 1430 / Ln. 5 efficiencies deficiencies Pg. 1430 / Ln. 18 SRP SRVs Pg. 1430 / Ln. 22 SRB lift time SRV lift Pg. 1431 / Ln. 1 SRBs SRVs Pg. 1431 / Ln. 5 scram but the scram will lock.

scram, the scram will occur.

Pg. 1432 / Ln. 1 relive relieve Pg. 1432 /

Ln. 12-13 and what parametrically that certainty is correct, and what, parametrically is that uncertainty, is it correct, Pg. 1433 / Ln. 1 that is that is where Pg. 1433 / Ln. 3 even big, even bigger Pg. 1433 / Ln. 9 Vermont.

Vermont Yankee.

Pg. 1433 / Ln. 12 Hatch had EPU 13 percent Hatch had an EPU of 13 percent Pg. 1433 /

Ln. 16-17 inside enclosure MSIV closure Pg. 1434 / Ln. 4 If it experience at flux scram, It experienced MSIV scram, Pg. 1434 / Ln. 5 peak went up, SRB went out peak power went up, SRV vented out Pg. 1434 / Ln. 13 scram on high flux scram and high flux Pg. 1434/

Ln. 17-18 it is more than frequency transient, it is a more frequent transient, Pg. 1453/ Ln. 18 risk RS Pg. 1456/ Ln. 4 pre-risk pre-RS Pg. 1456/ Ln. 6 from that after that Pg. 1456/ Ln. 20 INC I and C Pg. 1457/ Ln. 2, Ln. 3, Ln. 8 168 1.68 Pg. 1462/ Ln. 11 WITNESS ENNIS: And is CHAIR KARLIN: And Pg. 1464/ Ln. 15 the second licensee the licensee Pg. 1465/ Ln. 4 piece point Pg. 1471/ Ln. 10 being affected being effective Pg. 1471 / Ln. 24 It is 56, It is 56 percent, at Pg. 1472/ Ln. 9 extreme steam Pg. 1472/

Ln. 20-21 when your EPU goes out.

when youre at EPU, goes up.

Pg. 1472/ Ln. 23 whether what Pg. 1472/

Ln. 24-25 would be power levels.

would be at those power levels.

Pg. 1473 / Ln. 3 86 86 percent Pg. 1475 / Ln. 10 boiling pressure vessel boiler and pressure vessel Pg. 1475/ Ln. 19 SRV is depressurized.

SRVs depressurize.

Pg. 1476/ Ln. 7 percent was 499 PSIG pressure was 499 [sic, 1328] PSIG Pg. 1476/ Ln. 10 assumption when the assumption, one Pg. 1476/ Ln. 21 measure measurement Pg. 1477/ Ln. 8 where what Pg. 1478/ Ln. 22 talk talking Pg. 1479/ Ln. 23 exemption ascension Pg. 1480/ Ln. 1 containments components Pg. 1482/ Ln. 1 CCPU CPPU Pg. 1482/ Ln. 13 Staff SC Staffs SE Pg. 1484/ Ln. 12 repeated EPU Pg. 1485/ Ln. 9 MSIC MSIV Pg. 1490/ Ln. 14 livestock Liebstadt Pg. 1492/ Ln. 19 upright uprate Pg. 1493/ Ln. 5 energies Entergys Pg. 1499 / Ln. 11 my the Staff why the Staff Pg. 1499/ Ln. 17 212 2.12 Pg. 1502 / Ln. 20 generated generator Pg. 1503 / Ln. 1 after the model.

after the modifications.

Pg. 1506/ Ln. 23 G-STAR-2 GESTAR-II Pg. 1516/ Ln. 25 stead steady Pg. 1523/ Ln. 23 MR. SHADIS DR. HOPENFELD Pg. 1613/ Ln. 3 hearing hearing file Pg. 1613/ Ln. 5 hearing hearing file

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

ENTERGY NUCLEAR VERMONT YANKEE

)

Docket No. 50-271-OLA LLC and ENTERGY NUCLEAR

)

OPERATIONS, INC.

)

ASLBP No. 04-832-02-OLA

)

(Vermont Yankee Nuclear Power Station)

)

CERTIFICATE OF SERVICE I hereby certify that copies of NRC STAFFS PROPOSED TRANSCRIPT CORRECTIONS, in the above-captioned proceeding have been served on the following by deposit in the United States mail, first class; or as indicated by an asterisk (*), by deposit in the Nuclear Regulatory Commissions internal mail system; and by e-mail as indicated by a double asterisk (**), this 4th day of October, 2006.

Alex S. Karlin, Chair**

Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.gov Dr. Anthony J. Baratta**

Administrative Judge Atomic Safety and Licensing Board Panel Mail Stop T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ajb5@nrc.gov Lester S. Rubenstein**

Administrative Judge Atomic Safety and Licensing Board Panel 4760 East Country Villa Drive Tucson, AZ 85718 E-mail: lesrrr@comcast.net Office of the Secretary**

ATTN: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: HEARINGDOCKET@nrc.gov Office of Commission Appellate Adjudication*

Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Marcia Carpentier, Esq.**

Law Clerk Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: MXC7@nrc.gov)

Jay E. Silberg, Esq.**

Matias Travieso-Diaz, Esq.**

Pillsbury Winthrop Shaw Pittman, LLP 2300 N St., NW Washington, DC 20037-1128 E-mail: jay.silberg@pillsburylaw.com, and matias.travieso-diaz@pillsburylaw.com Terence A. Burke**

Associate General Counsel Entergy Services, Inc.

1340 Echelon parkway Jackson, MS 39213 E-mail: tburke@entergy.com John M. Fulton, Esq.

Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Raymond Shadis**

Staff Technical Advisor New England Coalition P.O. Box 98 Edgecomb, ME 04556 E-mail: shadis@prexar.com, shadis@ime.net

/RA/

Sherwin E. Turk Counsel for NRC Staff