Technical Requirements Manual Update to the NRC for Period Dated October 3, 2006
ML062790118
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/04/2006
From: Bottemiller C
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2006-00055
Download: ML062790118 (4)


Text

Entergy Operations, Inc.

Waterloo Road P.O. Box 756 Port Gibson. MS 39150 Tel 601 437 6299 Charles A. Bottemiller Manager Plant Licensing GN RO-2006/00055 October 4, 2006 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention :

Document Control Desk

Subject:

Technical Requirements Manual Update to the NRC for Period Dated October 3, 2006 Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29

Dear Sir and Madam:

Pursuant to Grand Gulf Nuclear Station (GGNS) Technical Requirements Manual Section 1.04, Entergy Operations, Inc. hereby submits an update of all changes made to GGNS Technical Specification TRM since the last submittal (GNRO-2006/00052) letter dated September 21,2006 to the NRC from GGNS. This update is consistent with update frequency listed in 10CFR50.71 (e).

This fetter does not contain any commitments.

Should you have any questions, please contact Michael Larson at (601) 437-6685.

Yours truly, CAB/MJL attachment:

Technical Requirement Manual Pages cc:

next page

GN RO-2006/00055 PAGE 2 Compton J. N.

Levanway D. E.

(Wise Carter)

Reynolds N. S.

Smith L. J.

(Wise Carter) cc:

(w/o)

(w/o)

(wlo)

(w/o)

NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission APTN: Dr. Bruce S. Mallett (WE) 61 I Ryan Plaza Drive, Suite 400 Arlington, TX 7601 1-4005 U.S. Nuclear Regulatory Commission ATTN: Mr. Bhalchandra Vaidya, NRWDORL (w/2)

ATTN: ADDRESSEE ONLY ATTN: Courier Delivery Only Mail Stop OWFN/7D-1 11 555 Rockville Pike Rockville, MD 20852-2378 ALL LETTERS ALL LETTERS -

COURIER DELIVERY (FEDEX, ETC.)

        • DO NOT USE FOR U.S. POSTAL SERVICE ADDRESS*****

NOT USED IF EIE USED ADDRESS ONLY -

ATTACHMENT to GNRO-2006100055 Grand Gulf Technical Requirement Manual Pages

SURVEILLANCE REQUIREMENTS SR 6.2.2.6 Verify that a sample of diesel fuel from each required fuel storage tank, obtained in accordance with ASTM-D4057-88, is within the acceptable limits specified in Table 1 of ASTM D975 when checked for viscosity, water and sediment.

I SURVEILLANCE I

SR 6.2.2.1 Verify each fire water storage tank contains 2 210,000 gallons.

SR 6.2.2.2 For batteries associated with a required diesel driven fire pump, verify the electrolyte level of each cell in each battery is above the plates.

AND For batteries associated with a required diesel driven fire pump, verify the overall battery set voltage is 2 24 volts.

(continued)

SR 6.2.2.3 -----------------------NOTE-----------------------

Not required to be met when 2 diesel driven fire suppression pumps are operable.

Start the electric motor driven fire suppression pump and operate it for at least 15 minutes.

SR 6.2.2.4 Verify that each required manual, power operated or automatic valve in the flow path is in its correct position.

SR 6.2.2.5 Verify the fuel storage tank for each required diesel driven fire pump contains 2 300 gallons of fuel.

AND Start each required diesel driven pump from ambient conditions and operate it 2 30 minutes.

FREQUENCY 7 days 7 days 31 days 31 days 31 days

$2 days I

TRM 6.2-15 LDC 06039