October 4, 2006 LICENSEE:
Tennessee Valley Authority FACILITY:
Browns Ferry Unit 1
SUBJECT:
MEETING
SUMMARY
- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 On October 2, 2006, the Nuclear Regulatory Commission (NRC) held a meeting of the NRC Browns Ferry 1 (BF1) Restart Oversight Panel in the Region II office in Atlanta, Georgia. The panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, Browns Ferry Unit 1 Restart Project Inspection Program. The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensees readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005.
During this meeting the panel discussed the BF1 restart project status and discussed the action items identified from the previous panel discussion conducted on September 7, 2006. Other discussion topics during this internal NRC meeting included: Update on the ACRS schedule; status of licensing activities; fire protection, internal tubing and containment coating program status; public website updates; SPOC II turnover status, and the next Public Meeting on October 20th in Rockville, MD. contains a list of the Panel Members participating in the meeting and other NRC attendees. Enclosure 2 contains the Inspection Planning and Scheduling Report.
TVA 2
Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html.
Sincerely,
/RA/
Joseph W. Shea, Director Division of Reactor Safety Docket No.: 50-259 License No.: DPR-33
Enclosures:
- 1. List of Attendees
- 2. Inspection Planning and Scheduling Report Distribution w/encls: (See page 3)
OFFICE RII:DRP RII:DRP RII:DRS SIGNATURE LSM MTW JWS1 NAME LMellen:aws MWidmann JShea DATE 10/05/2006 10/05/2006 10/05/2006 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3
Memo to BF Unit 1 Panel Members from Joseph W. Shea dated October 4, 2006.
SUBJECT:
MEETING
SUMMARY
- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 Distribution w/encl:
J. Shea, DRS C. Holden, NRR L. Raghavan, NRR J. Boska, NRR T. McGinty, NRR M. Lesser, DCI M. Widmann, DRP W. Bearden, DRP L. Mellen, DRP T. Ross, DRP D. Duvigneaud, NRR C. Stancil, DRP List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (10/02/06)
Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member M. Lesser, Chief, Division of Construction Inspection (DCI) - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters C. Holden, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR -
Vice Chairman L. Raghavan, Branch Chief, DORL, NRR - Member Other Attendees T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP J. Boska, Project Manager, DORL, NRR