September 26, 2006 LICENSEE:
Tennessee Valley Authority FACILITY:
Browns Ferry Unit 1
SUBJECT:
MEETING
SUMMARY
- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 On September 7, 2006, the Nuclear Regulatory Commission (NRC) held a meeting of the NRC Browns Ferry 1 (BF1) Restart Oversight Panel in the Region II office in Atlanta, Georgia. The panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, Browns Ferry Unit 1 Restart Project Inspection Program. The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensees readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005.
During this meeting the panel discussed the BF1 restart project status, reviewed the inspections and closeout criteria for one of the TVA Special Programs, and discussed the action items identified from the previous panel discussion conducted on August 3, 2006. Other discussion topics during this internal NRC meeting included: Update on the ACRS Schedule, Status of Licensing Activities, Fire Protection Program status, Inspection and Planning Scheduling (IP&S), SPOC II, and the next Public Meeting on October 20th in Rockville, MD.
The enclosure contains a list of the Panel Members participating in the meeting and other NRC attendees. These periodic meetings of the BF1 Panel will continue throughout the recovery process with the next internal meeting date to be on October 2, 2006 in the Region II office in Atlanta, Georgia.
TVA 2
Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html.
Sincerely,
/RA/
Joseph W. Shea, Deputy Director Division of Reactor Projects Docket No.: 50-259 License No.: DPR-33
Enclosure:
List of Attendees Distribution w/encl: (See page 3)
OFFICE RII:DRP RII:DRP SIGNATURE JSW1 MSF for NAME JShea MWidmann DATE 09/26/2006 09/26/2006 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
TVA 3
Memo to BF Unit 1Panel Members from Joseph W. Shea dated September 26, 2006.
SUBJECT:
MEETING
SUMMARY
- INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 Distribution w/encl:
J. Shea, DRP C. Holden, NRR L. Raghavan, NRR J. Boska, NRR T. McGinty, NRR M. Lesser, DRS M. Widmann, DRP W. Bearden, DRP L. Mellen, DRP T. Ross, DRP D. Duvigneaud, NRR C. Stancil, DRP
Enclosure List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (9/07/06)
Nuclear Regulatory Commission Panel Members Region II J. Shea, Deputy Director, Division of Reactor Projects (DRP) - Chairman M. Widmann, Chief, Branch 6, DRP - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member M. Lesser, Office of Regional Administrator - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters C. Holden, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR -
Vice Chairman (Via VTC)
L. Raghavan, Branch Chief, DORL, NRR - Member Other Attendees T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP T. Nazario, Project Engineer, Branch 6, DRP J. Boska, Project Manager, DORL, NRR T. McGinty, Deputy Director, DORL, NRR