Response to Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations.
ML062770277
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/29/2006
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3292, RIS-06-015
Download: ML062770277 (4)


Text

-FENOC FN 5501 North State Route 2 FirstEnergy NuclearOperatingCompany Oak Harbor.Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President- Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3292 September 29, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Response to Regulatory Issue Summary 2006-15, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlemen:

The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2006-15, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, "Operator Licensing Examination Data," provides information through calendar year 2010 for Operator License Examinations and through calendar year 2008 for the Generic Fundamentals Examination.

Should you have any questions or require additional information, please contact Mr. Mark A.

Trump, Site Training Manager, at (419) 321-8494.

Very truly yours, Mark B. Bezilla LiS Attachment Enclosure cc: Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-1 NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board MUn

Docket Number 50-346 License Number NPF-3 Serial Number 3292 Attachment I Page 1 of I COMMITMENT LIST The following list identifies actions committed to by the Davis-Besse Nuclear Power Station (DBNPS) in this document. Any other actions discussed in thesubmittal represent intended or planned actions by the DBNPS. They are described only as information and are not regulatory commitments. Please notify the Director - Performance Improvement at 419-321-7181, at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A

Docket Number 50-345 License Number NPF-3 Serial Number 3292 Form NRC - 536 Operator Licensing Examination Data (one page follows)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 (8-2005) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection is used to plan budgets and resources for operator examinations. Send comments regardin burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

Nuclear Regulatory Commission. Washington, DC 20555-000 or b internet EXAMINATION DATA e-mail to Infocollects@nrc.gov. and to the Desk Officer, Office of I[normation and Regulatory Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Davis-Besse Nuclear Power Station, Unit 1 Region III A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 0 6 3 0 OPERATORS NUMBER OF SENIOR REACTOR 0 10 3 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0 1 3 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/21/2008 08/13/2009 ALTERNATE DATE 02/18/2008 09/17/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 6 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER