ML062710291
| ML062710291 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 09/21/2006 |
| From: | Hironori Peterson NRC/RGN-III/DRS/OLB |
| To: | Crane C Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML062710291 (5) | |
Text
September 21, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION
Dear Mr. Crane:
In a telephone conversation on September 18, 2006, Mr. R. Williams, Requalification Lead, and Mr. M. Bielby, Lead NRC Inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Byron Station. The inspection is planned for the week of October 30, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the current biennial written examinations and annual operating tests to the NRC by October 20, 2006. Additionally, to facilitate the efficient conduct of the inspection, please have available on site for review, the documents listed in the enclosure. Mr. Williams has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2009.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Enclosure:
Documentation requested to be available onsite during the inspection week cc w/encl:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station S. Stimac, Byron Training Department
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. M. Bielby at 630-829-9762, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Enclosure:
Documentation requested to be available onsite during the inspection week cc w/encl:
Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear Document Control Desk - Licensing Assistant Attorney General Illinois Emergency Management Agency State Liaison Officer, State of Illinois State Liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission B. Quigley, Byron Station S. Stimac, Byron Training Department DOCUMENT NAME: E:\\Filenet\\ML062710291.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME MBielby:co HPeterson DATE 09/20/06 09/21/06 OFFICIAL RECORD COPY
C. Crane ADAMS Distribution:
DXC1 TEB RFK RidsNrrDirsIrib GEG KGO BLB1 CAA1 DRPIII DRSIII PLB1 TXN DCT J. R. Kweiser, DRS
DOCUMENTATION REQUESTED TO BE AVAILABLE ONSITE DURING THE INSPECTION WEEK 1.
Training and Operations organization chart and site phone book; 2.
Technical Specifications/License Operator Requalification Training (LORT) program procedures/Conduct of Operations administrative procedures; 3.
Current cycle crew and individual examination evaluations for weeks prior to the exam week inspection; 4.
Sample Plan (Master List) for this years annual examination and how it was derived; 5.
The 24-month training plan for the training current cycle; 6.
Attendance records for LORT; 7.
Applicants pass/fail results for written exams, individual operating tests and simulator operating tests for each requalification cycle; 8.
Records related to remediation of recent annual exam failures, and any past failures over the last 2 years; 9.
Complete Annual Exam Schedule illustrating operating and staff crews: names, positions, dates, and times for exam administration; 10.
LORT related condition reports written in the last year; 11.
Reports related to NRC performance indicators - e.g., safety system failures, transients, scrams, risk important scrams; 12.
The last QA audit that evaluated your requalification program; 13.
Any operations and LORT self-assessments done during the 2-year training cycle; 14.
Operator, instructor, management feedback during the 2-year training cycle; 15.
Curriculum review committee meeting minutes for past training year; 16.
Proficiency watch list for active/reactivated licenses, including the procedure for how you keep track of proficiency watches and license restrictions; 17.
Access to complete licensed operator medical records; 18.
Lesson plan(s) addressing: Plant Events/LERs/SOERs/Mods/Lessons Learned; 19.
Applicable ANSI 3.5 Standard for simulator fidelity; 20.
Simulator evaluations for any EOP operator response time(s) based on UFSAR time limits performed during the 2-year cycle; 21.
Simulator open items list and performance indicators; 22.
Simulator management and configuration control procedure(s);
23.
List of open simulator discrepancies; 24.
List of closed simulator discrepancies for the last 12 months; 25.
Simulator performance tests: Transient, Malfunction, Core Performance, Normal Plant; 26.
Evolution, Operator Conducted Surveillance...including applicable plots/trends; and 27.
Responses to questions in Inspection Procedure 71111.11, Appendix C, Checklist for Evaluating Plant Referenced Simulators Operating under 10 CFR 55.46(c) and (d).
Enclosure