ML062680287

From kanterella
Jump to navigation Jump to search
Allegation Action Plan RIII-01-A-176
ML062680287
Person / Time
Site: Kewaunee, Point Beach  NextEra Energy icon.png
Issue date: 11/15/2001
From:
NRC/RGN-III
To:
References
FOIA/PA-2006-0113, RIII-01-A-0176
Download: ML062680287 (4)


Text

(

(

ALLEGATION ACTION PLAN AMS NO. RIII-01-A-176 Licensee:

Docket/License No:

Assigned Division/Branch:

Kewaunee and Point Beach 05000305 and 05000266/301 MEB/DRS AIIea~tion Review Ro~rd MAmber.qhirv (PBeslII*

Kock/ Clayton Chairman -Grant/

Pederson/

Dapas/ Caniano/

Reynolds Jacobson GENERIC CONCERNS: If Yes Explain:

DISCUSSION OF SAFETY SIGNIFICANCE: No immediate threat to public health and safety 01 ACCEPTANCE:

YES NO (Priority: HIGH NORMAL LOW)

Basis for 01 Priority:

01 has Accepted Concern(s) No(s).

Signature ARB MINUTES PROVIDED TO: Dver/PauVJacobson t

v 1I(,t1O ACKNOWLEDGMENT LETTER:

PRINT IN FINAL REVISE

.N/A X

REFERRAL LETTER-A. Licensee YESX NO B. State of YES NO X

C. DOE YES NOX date received November 08, 2001 due date of 1 ARB December 8, 2001 date -120 days old March 8, 2002 due date of ACK Ltr December 8, 2001 date -180 day old May 7, 2002 projected date for the 5 yr statue of limitation November 7, 2006 COMMENTS:

Anonymous Allegation Review Board Chairman Date

%NA0 ErapvqL

,llioriiakluii Ifi Lih:i icwura was deiee E

in accordance with the Freedom of Information, Page 1 of 6 Act, exempti"uS-r 00

.rc,& fw o.

[0*-0.

&'=

--/,/-?,

AMS No. RIII-01-A-176 C6ncem No. 1 An emerncyARB waheld on 11/08/01. The purpose of the ARB was to determine if the FFD

  • l lrshould immediately be discussed with the licensee because-4*" ;

Kewaunee steam generator outage. The ARB membership consisted of Jack Grobe, Bruce Berson, Rich Paul, Roy Caniano, Jim Heller, and John Jacobson. The ARB agreed that Mr.

Heller and/or Mr. Jacobson will call AL Capdsto, "Nuclear Management Company, and ask Mr.

j e_

Capristo if Day Zimmerman NPS provides welders that work within the protected area or otherII,i/

individuals that work within the protective area.

1)

If Day Zimmerman NPS does not supply welders or individual who work within the protected area then send concerns I and 2 for information only

2) if Day Zimmerman NPS does supply Welders or individual who work within the protected area then send concerns 1 and 2 to the licensee and request a response On 11/08/01 Mr. Heller called Mr. Capristo to determine what services were provided by Day Zimmerman NPS at the Kewaunee and Point Beach Nuclear Power Plants. In addition I Mr. Heller asked Mr. Capristo if Day Zimmerman NPS has personnel working within the protected area of either nuclear power plant.

Mr. Capristo stated that Day Zimmerman NPS provides labor to support the Point Beach and Kewaunee outages. This means that Day Zimmerman NPS provides individual; including welders, who are cleared to enter the protective area. In addition a number of NPS worker ) tb.

have access to the protected areas of Kewaunee and Point Beach.

v*j'j After receiving this information Mr. Heller read all of the concerns to Mr. Capristo and informed Mr. Capristo that our referral letter would (1) request a response for concern 1* (2) request a response for concern 2? (3) request confirmation that the OSHA issue is being evaluated 'and (4) provide concern 4 for information only.

SENSITIVE ALLEGATION MATERIAL Page 2 of 6 lfl'rAvbLt, Cx-eI-,

vi~

t4, L

~Lk jd

/

(

AMS No. RIII-01-A-176 Concern No. 2 The Cl is concerned about contractor supervisors who turn their heads when certain individuals come in half blitzed.

Regulatory Basis: Fitness for duty I.

Action Evaluation: The following method of resolution is recommended (circle):

/

A.

Send to Licensee Requesting Response in _30 Days.

(Describe the general areas we expect the licensee to address.)

B.

Priority Rill Follow up and Closure Memo to OAC C.

Follow up During Routine Inspection Within Days and Closure Memo to OAC D.

Refer to 01. Recommended Priority: HIGH NORMAL LOW Recommended Basis:.

E.

Outside NRC's Jurisdiction.

Describe Basis Below.

F.

Too General for Follow-up. Describe Basis Below.

G.

Other (specify)

Responsible for Action -

EICS I1.

Soecial Considerations/Instructions:

Cc&-- c SnVE ALL TIOIN Page 3 of 6

Copy of the letter that was provided anonymously by a concerned individual. This letter was retyped by Jim Heller on November 12, 2001 0LX~

SE8fA