October 10, 2006 Mr. Charles D. Naslund Senior Vice President and Chief Nuclear Officer Union Electric Company Post Office Box 620 Fulton, MO 65251
SUBJECT:
CALLAWAY PLANT, UNIT 1 - CLOSEOUT OF RESPONSE TO GENERIC LETTER 2006-03, "POTENTIALLY NONCONFORMING HEMYC AND MT FIRE BARRIER CONFIGURATIONS" (TAC NO. MD1559)
Dear Mr. Naslund:
By letter dated June 1, 2006 (ULNRC-05294), as supplemented by the letter dated July 17, 2006 (ULNRC-05310), the Union Electric Company (the licensee) responded to Generic Letter (GL) 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations," for the Callaway Plant, Unit 1 (Callaway). Under oath or affirmation, the licensee stated that it does not use either the Hemyc or MT fire barrier system for fire barrier separation of redundant post-fire safe shutdown trains. Instead, Darmatt KM-1 is used for raceway fire barrier protection for these trains. It is also stated that this fire protection material meets Title 10 of the Code of Federal Regulations, Part 50, Appendix R,Section III.G requirements and have been installed consistent with industry fire testing, with deviations from the tested configurations evaluated in accordance with GL 86-10, Supplement 1, "Fire Endurance Test Acceptance Criteria for Fire Barrier Systems Used to Separate Redundant Safe Shutdown Trains Within the Same Fire Area," dated March 25, 1994. This evaluation is to assure that the installed fire barrier systems provide the required level of fire protection. The fire-rated enclosures are inspected by the licensee every 18 months to ensure the ongoing integrity of the fire barriers.
Based on the letters dated June 1 and July 17, 2006, the U.S. Nuclear Regulatory Commission (NRC) staff concludes that the fire barrier systems at Callaway that separate redundant safe shutdown trains located within the same fire area have been designed and installed in accordance with current NRC guidance. Therefore, the letters, which are the basis that the other fire barriers have been designed and installed in accordance with NRC guidance, should be maintained on site, and will be subject to inspection during the normal NRC inspection process.
C. D. Naslund This letter closes out the NRC staff review of the GL 2006-03 response for Callaway. If you have any questions regarding this letter, contact me at 301-415-1307.
Sincerely,
/RA/
Jack Donohew, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 cc: See next page
- with comments OFFIC E
NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DRA/AFPB/BC NRR/LPL4/BC NAME JDonohew LFeizollahi SWeerakkody*
DTerao DATE 9/27/06 9/26/06 10/6/06 10/10/06
Callaway Plant, Unit 1 cc:
Professional Nuclear Consulting, Inc.
19041 Raines Drive Derwood, MD 20855 John ONeill, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N. Street, N.W.
Washington, D.C. 20037 Mr. Keith A. Mills, Supervising Engineer Regional Regulatory Affairs/Safety Analysis AmerenUE P.O. Box 620 Fulton, MO 65251 U.S. Nuclear Regulatory Commission Resident Inspector Office 8201 NRC Road Steedman, MO 65077-1302 Mr. Les H. Kanuckel Manager, Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251 Missouri Public Service Commission Governor Office Building 200 Madison Street Jefferson City, MO 65102-0360 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Mr. H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102-0176 Mr. Rick A. Muench President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KA 66839 Mr. Dan I. Bolef, President Kay Drey, Representative Board of Directors Coalition for the Environment 6267 Delmar Boulevard University City, MO 63130 Mr. Lee Fritz, Presiding Commissioner Callaway County Court House 10 East Fifth Street Fulton, MO 65151 Mr. David E. Shafer Superintendent, Licensing Regulatory Affairs AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Mr. Keith D. Young Manager, Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Certrec Corporation 4200 South Hulen, Suite 630 Fort Worth, TX 76109 Director, Missouri State Emergency Management Agency P.O. Box 116 Jefferson City, MO 65102-0116