Allegation Action Plan, RIII-02-A-0114
ML062650358
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/29/2002
From:
NRC/RGN-III
To:
References
3-2002-A-0114, FOIA/PA-2006-0113
Download: ML062650358 (4)


Text

  • "ENSITIVE ALLEGATION MATERIAL AMS..,J. RIII-02-A-0114

".ALLEGATION ACTION PLAN Licensee: Kewaunee Docket/License No: 05000305 Assigned Division/Branch: Security/MEB, DRS I o-PI0 all

~ (9m Allegation Review Board Membership: Chairman -Grant/ Pederson/ Grobe Berson/ Heller/ Kock/ Clayton D!,pas Caniano/

Reynolds f

DHiIls, DRS GENERIC CONCERNS: If Yes Explain:

'ý I/L9s C" DISCUSSION OF SAFETY SIGNIFICANCE: No immediate threat to public health and safety. The Ci's FFD issue is being investigated by O and was pursued as Rill 2001-A-0176. The Cl's issue related to installation of piping withouta procedure is not an immediate issue since the Cl did not allege that the piping was incorrectly installed.

01 ACCEPTANCE: YES NO Priori HIGH NORMAL LOW)

RBais for 01 Prioritv:

..... J w n 01 has.Accepted Conern(s) No(s). Signature -

ARB MINUTES PROVIDED TO: Dyeu/PauljreedkIilIs/llsi t"Kf l

/-, / / /.

ACKNOWLEDGMENT LETTER: PRINT IN FINAL X REVISE N/A Inform Cl that we are reviewing the information the Cl has provided to Jheller 07/15/02 REFERRAL LETTER: A. Licensee YES X NO Concern 2 B. State of YES NO C.'" DOE YES NO date received July 3, 2002 due date of 1 st ARB August 2, 2002 due date of ACK Ltr August 2, 2002 date -90 days old October 1, 2002 date -120 days old October 31, 2002 date -150 day old November 30, 2002 date -180 days old December 30, 2002 date -365 days old July 3, 2003 projected date for the 5 yr statue of limitation July 2, 2007 COMMENTS:

The Cl did not object to having identity released related to concern 1. The Cl objected to the release of identity regarding concern 2.

The Cl did, not qbject to referral of concern 2 t the licensee.

Allegation iew Board Chairman Da'te

SENSITIVE ALLEGATION MATERIAL AMS No. RIII-02-A-0114 Each stated concern or NRC identified issue should be documented on a separate sheet. Each.

concern must be documented and written with enough detail to allow thorough follow up.

Concern No. 1 An individual is concerned that several other craft employees were being unjustly accused that they failed to report the smell of alcohol on a foreman while being employed as craft employees during the steam generator project. The individual stated that these was report to the supervisor, who took no action.

Regulatory Basis: NONE

1. Action Evaluation: The following method of resolution is recommended (circle):

A. Send to Licensee Requesting Response in __ Days. (Describe the :general areas we expect the licensee to address.)

B. Priority RIII Follow up and Closure Memo to oAC C. Follow up During Routine Inspection Within __ Days and Closure Memo to OAC t-"--. Refer to 01. Recommended Priority- HIGH NORMA. LOW 7 E.

F.

Recommended Basis:

Outside NRC's Jurisdiction.

1/A ., '1 Describe Basis Below.

Too General for Follow-up. Describe Basis Below.

(:,-Z )

G. Other (specify)

W~hothcr "l1e lihensee nad jubtii,,l.*,' to =ccuse i.ndk'iduats-of-w'ongdoingisntwtn

,2hc ,NC'sj:u;idicti*on, '3rn!* the individu~k lpi!*m that thc iccuJsation l a rosult-of * >-'

andidal, ra*ising safety issi, I he wrongdoing issue (not reporting the smell of alcohol on an individual) is being pured as RIII-2001-A-0176. Inform the Cl that we will include the issue of whether the supervisor took no action in our current investigation. Hold the concern open pending the results of Ol's investigation under RIII-2001-A-0176.

Responsible for Action - EICS II. Special Considerations/Instructions:

4" * . II, SENSITIVE ALLEGATION MATERIAL AMS No. RIII-02-A-0114 Each stated concern or NRC identified issue should be documented on a separate sheet. Each concern must be documented and written with enough detail to allow thorough follow up.

Concern No. 2 An individual is concerned that during the steam generator project, craft personnel were required to install safety-related service water equipment from a hand-written drawing. The individual believes this was in violation of licensee installation procedures. The equipment installed was several hundred feet of 8" carbon steel pipe from both EDG's discharge piping to the plant's standpipe.

ReQulatory Basis: 10 CFR 50, Appendix B, Criterion V I. Action Evaluation: The following method of resolution is recommended (circle):

XX A. Send to Licensee Requesting Response in 30 Days. (Describe the general areas we expect the licensee to address.)

B. Priority RIII Follow up and Closure Memo to OAC C. Follow up During Routine Inspection Within _ .Days and Closure Memo to OAC D. Refer to 01. Recommended Priority: HIGH NORMAL LOW Recommended Basis:

E. Outside NRC's Jurisdiction. Describe Basis Below.

F. Too General for Follow-up. Describe Basis Below.

G. Other (specify)

Request that the licensee provide:

-Whether the work performed under DCR 3204 was properly specified per the Quality Assurance Program. Request that the licensee provide the bases for its conclusions and include in the response whether flooding, seismic 2-over-1 and flow reduction due to crimping were addressed.

Responsible for Action - EICS II. Special Considerations/Instructions:

SENSITIVE ALLEGATION MATERIAL NEW ALLEGATION: RIII-02-A-01.14 July 25, 2002 MEMORANDUM TO: James Creed, Chief, Security Branch, DRS David Hills, Chief, Mechanical Engineering Branch, DRS FROM: A. Kock, Rill - OAC

SUBJECT:

RECEIPT OF NEW ALLEGATION: RIII-02-A-0114 (KEWANUEE)

On July 3, 2002, DRP received concerns regarding individuals being unjustly accused of not reporting an FFD issue and installation of piping without a procedure. The Cl provided additional information to security, MEB, and EICS on July 3, 2002, July 15, 2002, and July 14, 2002. The information provided to EICS on July 15, 2002 is being reviewed by MEB and security.

Security's July 3, 2002 record of conversation with the Cl and MEB's July 16, 2002 memorandum outline the concerns to date, the regulatory bases, and provided recommended actions. I have reviewed this information and agree with your characterization of the concern and proposed actions.

I have scheduled an Allegation Review Board (ARB) for July 29, 2002. Please review the attached information to prepare for the ARB.

cc w/attachments:

ARB Copy 01 RC DRP Br Chief For Rx Cases-Lanksbury DRS Division Director For Rx Cases-Grobe Clayton for H&I or wrong doing