MONTHYEARML0602502612006-01-26026 January 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0602700882006-01-31031 January 2006 Facsimile Transmission Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call (Tac No. MC8327) Project stage: Draft RAI ML0604005082006-03-0202 March 2006 Facsimile Transmission, Draft Request for Additional Information to Be Discussed in an Upcoming Conference Call Project stage: Draft RAI ML0620005092006-07-25025 July 2006 Request for Withholding Information from Public Disclosure for Stone and Webster Project stage: Withholding Request Acceptance ML0626404642006-09-15015 September 2006 Technical Specification, Incorporate a Full-Scope Application of an Alternate Source Term Methodology Project stage: Request ML0622201602006-09-20020 September 2006 Issuance of Amendment Recirculation Spray System Project stage: Approval ML0626404622006-09-20020 September 2006 Technical Specification, Revise Surveillance Requirements for Recirculation Spray System Project stage: Other 2006-03-02
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21280A3282021-10-0707 October 2021 Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML20275A0002020-10-14014 October 2020 Issuance of Amendment No. 277 to Revise Technical Specification 6.8.4.g to Allow a One-Time Deferral of the Steam Generator Inspections ML20237H9952020-09-29029 September 2020 Issuance of Amendment No. 341 Revision to Technical Specification 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML20261H5982020-09-17017 September 2020 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20191A0042020-08-0707 August 2020 Issuance of Amendment No. 340 Revised Technical Specification Limits for Primary and Secondary Coolant Activity ML19126A0002019-05-28028 May 2019 Issuance of Amendment No. 273 Regarding Technical Specification Changes for Spent Fuel Storage and New Fuel Storage ML19042A2772019-03-21021 March 2019 Issuance of Amendment No. 272 Regarding Revision to Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML18100A0552018-04-0404 April 2018 License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML17038A0062017-02-0101 February 2017 Technical Specifications 2016 Annual Report ML17025A2182017-01-24024 January 2017 Issuance of Amendment Realistic Large Break Loss-of-Coolant Accident Analysis ML16354A4242016-12-14014 December 2016 License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 ML16208A0512016-07-26026 July 2016 Clean Technical Specifications (TS) Pages for Millstone Power Station 1 (Docket No. 05000245), Administrative Changes for TS (L53121) ML16068A3122016-03-31031 March 2016 Issuance of Amendment No. 326 to Revise Technical Specifications for Containment Leak Rate Testing ML16011A4002016-01-29029 January 2016 Issuance of Amendments Nos. 325 and 267 to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15288A0042015-11-30030 November 2015 Issuance of Amendment No. 266: Implementation of WCAP-14333 and WCAP-15376, Reactor Trip System and Engineered Safety Feature Actuation System Instrumentation Test Times and Completion Times ML15280A2422015-10-29029 October 2015 Issuance of Amendment No. 324 Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, Adoption of TSTF-425,Rev 3 ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15225A0102015-08-28028 August 2015 Issuance of Amendment No. 264 Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves ML15225A0082015-08-26026 August 2015 Issuance of Amendment No. 322 Revision to the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML15187A3262015-07-29029 July 2015 Issuance of Amendment No. 321, Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C ML15187A1862015-07-28028 July 2015 Issuance of Amendment No. 263, Regarding Technical Specification Changes to Auxiliary Feedwater System (MF4692) ML15187A0112015-07-27027 July 2015 Issuance of Amendment No. 262, Refueling Water Storage Tank Allowable Temperatures ML15209A7292015-07-21021 July 2015 Response to Second Request for Additional Information Regarding Proposed Technical Specification Change for Spent Fuel Storage ML15098A0342015-05-20020 May 2015 Issuance of Amendment No. 261, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A0022015-05-20020 May 2015 Issuance of Amendment No. 320, Delete Technical Specification Index and Make Other Editorial and Administrative Changes ML15093A4412015-05-18018 May 2015 Issuance of Amendment No. 319, Use of Areva M5 Alloy Clad Fuel Assemblies ML15044A0442015-02-0909 February 2015 Revised Response to Request for Additional Information Regarding License Amendment Request for Proposed Technical Specification Changes of the Refueling Water Storage Tank Allowable Temperatures ML15021A1282015-01-15015 January 2015 Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML14301A1122014-10-22022 October 2014 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML14154A0912014-05-28028 May 2014 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink. ML14073A0552014-04-0808 April 2014 Issuance of Amendment Calculated Containment Internal Pressure ML13346A7672013-12-18018 December 2013 Correction Letter to License Amendment Nos. 256 and 257 ML13155A1402013-05-28028 May 2013 Response to Request for Additional Information Regarding Proposed Technical Specifications Changes for Spent Fuel Storage ML13133A0322013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.5 Ultimate Heat Sink. ML13133A0332013-05-0303 May 2013 License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML12284A2132012-10-0404 October 2012 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML12250A6642012-08-28028 August 2012 Correction to Proposed Technical Specifications to Adopt TSTF-510 ML12220A0122012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12219A0732012-07-31031 July 2012 Proposed Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process ML12202A0402012-07-17017 July 2012 License Amendment Request Regarding Removal of a License Condition, Proposed Technical Specifications Bases Change and FSAR Change for Ultimate Heat Sink Temperature Measurement ML12110A1142012-04-12012 April 2012 License Amendment Request for Permanent Alternate Repair Criteria for Steam Generator Tube Inspection and Repair ML12097A2002012-04-0202 April 2012 License Amendment Request to Revise Snubber Surveillance Requirements ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11329A0032011-11-17017 November 2011 Proposed License Amendment and Exemption Request for Use of Optimized Zirlo Rod Cladding ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML11193A2232011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 1 Through Attachment 3, Marked-up TS Page Changes 3/4 6-22 ML1102802082011-01-20020 January 2011 License Amendment Request to Revise Technical Specification (TS) 6.8.4.g, Steam Generator (SG) Program, and TS 6.9.1.7, Steam Generator Tube Inspection Report for Temporary Alternate Repair Criteria (H*) 2024-06-04
[Table view] |
Text
CONTAINMENT SYSTEMS RECIRCULATION SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.6.2.2 Two independent Recirculation Spray Systems shall be OPERABLE.
APPLICABILITY: MODES 1, 2,3, and 4.
ACTION:
With one Recirculation Spray System inoperable, restore the inoperable system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore the inoperable Recirculation Spray System to OPERABLE status within the next 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.2.2 Each Recirculation Spray System shall be demonstrated OPERABLE:
- a. At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position;
- b. By verifying that each pump's developed head at the test flow point is greater than or equal to the required developed head when tested pursuant to Specification 4.0.5;
- c. At least once per 24 months by verifying that on a CDA test signal, each recirculation spray pump starts automatically after receipt of an RWST Low-Low signal; I
- d. At least once per 24 months, by verifying that each automatic valve in the flow path actuates to its correct position on a CDA test signal; and
- e. By verifying each spray nozzle is unobstructed following maintenance that could cause nozzle blockage.
MILLSTONE - UNIT 3 3/4 6-13 Amendment No. M0, 4-00, 4-2-, 4---5,
--74 2-06, 22-2, 233