Letter Sequence RAI |
---|
TAC:MC9500, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR (Approved, Closed) TAC:MC9501, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR (Approved, Closed) TAC:MD0187, (Approved, Closed) TAC:MD0188, (Approved, Closed) |
|
MONTHYEARML0625602582006-07-0606 July 2006 Preliminary Request for Information - E-Mail to Licensee Project stage: RAI CPSES-200601734, Response to Request for Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report2006-08-31031 August 2006 Response to Request for Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report Project stage: Response to RAI CPSES-200601797, Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specification for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High2006-09-12012 September 2006 Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specification for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High Project stage: Response to RAI CPSES-200601971, Submittal of Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report2006-09-29029 September 2006 Submittal of Additional Information Related to License Amendment Request 05-007, Revision to Technical Specification 5.6.6 Regarding Pressure and Temperature Limits Report Project stage: Request CPSES-200602475, Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specifications for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High2006-12-14014 December 2006 Response to Request for Additional Information Related to License Amendment Request 05-08, Revision to Technical Specifications for Nominal Trip Setpoints and Allowable Value Setpoints for SG Water Level Low-Low and High-High Project stage: Response to RAI ML0703500472007-02-20020 February 2007 Technical Specifications, Issuance of Amendment Nos. 131 & 131 Technical Specification Changes Related to Unit 1 Steam Generator Replacement Project (TAC Nos. MD0187 & MD0188) Project stage: Approval ML0703500462007-02-20020 February 2007 License Amendment, Issuance of Amendment Nos. 131 & 131 Technical Specification Changes Related to Unit 1 Steam Generator Replacement Project (TAC Nos. MD0187 & MD0188) Project stage: Approval ML0703208252007-02-22022 February 2007 Issuance of Amendment Nos. 132 and 132 Revise Technical Specification 5.6.6 on Reactor Coolant System Pressure & Temperature Limits Report Project stage: Approval ML0703208272007-02-22022 February 2007 Technical Specification Pages Re Reactor Coolant System Pressure & Temperature Limits Report Project stage: Other 2006-09-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24292A0282024-10-18018 October 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Adoption of TSTF-51, TSTF-471, and TSTF-571 ML24262A1302024-09-18018 September 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Multiple Relief Requests for Unit 2 Third Inservice Inspection Interval Due to Impracticality (EPID L-2024-LLR-0053 Through -0058) ML24205A2162024-07-23023 July 2024 September 2024 Emergency Preparedness Program Inspection - Request for Information ML24204A0022024-07-18018 July 2024 NRR E-mail Capture - Request for Additional Information Comanche Peak Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML24095A1532024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Request to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program (EPID 2024-LLA-0023) ML24095A2382024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Comanche Peak Request to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24052A0122024-02-16016 February 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications ML24033A2642024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Revised Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24036A0122024-02-0202 February 2024 NRR E-mail Capture - Comanche Peak - Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24025A0172024-01-22022 January 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment ML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24008A2492023-12-18018 December 2023 Texas SHPO Response for Comanche Peak Deis Review and Comment ML23311A2202023-11-20020 November 2023 NRC to Fws, NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2023 ML23255A2882023-09-12012 September 2023 NRR E-mail Capture - Comanche Peak - Acceptance of Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23226A0072023-08-11011 August 2023 NRR E-mail Capture - Comanche Peak 1 and 2 – Audit Plan - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0722023-06-29029 June 2023 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23172A0152023-06-20020 June 2023 NRR E-mail Capture - Re Comanche Peak - Acceptance of License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23145A2332023-05-25025 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 2 ML23143A1382023-05-23023 May 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Confirmation of Information - Set 1 ML23139A0802023-05-18018 May 2023 NRR E-mail Capture - Comanche Peak – Draft Supplemental Information Request - License Amendment Request Regarding General Design Criterion 5 of Appendix a to 10 CFR Part 50 and Regulatory Guide 1.81 ML23138A1522023-05-18018 May 2023 Lr Docs - (External_Sender) Comanche Peak Nuclear Power Plants ML23135A9132023-05-15015 May 2023 NRR E-mail Capture - Comanche Peak - Draft Supplemental Information Request - License Amendment Request to 10 CFR 50.69 ML23131A2932023-05-11011 May 2023 Lr Docs - License Renewal for Comanche Peak Nuclear Power Plant, Units 1 and 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23110A7122023-04-20020 April 2023 NRR E-mail Capture - Comanche Peak - Verbal Authorization of Proposed Alternative RV-1 (L-2023-LLR-0019) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak – Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak – Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23061A1612023-03-0202 March 2023 E-mail from David Griggs Regarding Submission to NRC Electronic Information Exchange on 03/01/2023 for Citizens for Fair Utility Regulation in Comanche Peak Proceeding ML23032A3842023-02-0101 February 2023 LRA On-Site Audit Needs List ML23214A0192023-01-30030 January 2023 (External_Sender) Request to Broaden Extended Deadline to the General Public (with Attachments) - C3 ML23214A0202023-01-29029 January 2023 (External_Sender) Requesting a Deadline Extension on NRC-2002-0183, Comanche Peak License Renewal - C2 ML23214A0182023-01-26026 January 2023 (External Sender) NRC-2022-0183-0003 (with Attachment) - C6 ML23214A0162023-01-24024 January 2023 (External Sender) EPA Scoping Comment Letter for the Comanche Peak Nuclear Power Plant License Renewal (with Attachment) - C8 ML23214A0142023-01-23023 January 2023 (External Sender) Docket NRC-2022-0183 Comanche Peak Nuclear Power Plant Renewal (with Attachment) - C1 ML23214A0172023-01-17017 January 2023 (External Sender) NRC License Extension? No! ML23214A0132023-01-17017 January 2023 (External Sender) Docket Id NRC-2022-0183, Request for Extension of License for Comanche Peak, Comment for Environmental Scoping - C9 ML23214A0122023-01-13013 January 2023 (External Sender) Correction to Comment Submitted 01-13-23 - C11 ML22362A0992022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Apply Westinghouse Fsloca Evaluation Model ML22362A0972022-12-28028 December 2022 NRR E-mail Capture - Comanche Peak - Acceptance of License Amendment Request to Adopt WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications, ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22237A2842022-08-25025 August 2022 CPNPP 2022 EP Program Inspection RFI Hjs 08252022 ML22229A0792022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak - Acceptance of Requested Licensing Action - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22133A0472022-05-13013 May 2022 July 2022 Emergency Preparedness Exercise Inspection - Request for Information 2024-09-18
[Table view] |
Text
From: Mohan Thadani To: Internet:dbuschb1@txu.com; Internet:fred.madden@txu.com Date: 7/6/2006 10:23:57 AM
Subject:
Preliminary Request for Additional Information- TAC Numbers MC9500 and MC9501 Fred/Denny:
The NRC staff has reviewed the TXU Generation Company LP's request for amendments, dated February 21, 2005, revising the Technical Specifications to reflect the replacement of Steam Generators. The staff has identified the following preliminary request for additional information. I will appreciate your assistance in providing your response to the following questions in a timely manner.
Please let me know, by an email, when the TXU Generation Company LP will be able to respond. Also, let me know If you need a formal letter for this request. I will then promptly process a formal letter for this request.
Thank you for your cooperation.
Mohan 301 415-1476 PRELIMINARY REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST 05-08 REVISION TO TECHNICAL SPECIFICATIONS FOR NOMINAL TRIP SETPOINTS AND AV SETPOINTS FOR SG WATER LEVEL LOW-LOW AND HIGH-HIGH COMANCHE PEAK STEM ELECTRIC STATION UNITS 1 AND 2 TXU GENERATION COMPANY, LP TAC NOS. MD0187 AND MD0188 By letter dated February 21, 2006, the licensee of the Comanche Peak Steam Electric Station proposed to revise the nominal trip setpoints (NTS) and Allowable Values (AV) of setpoints for steam generator (SG) water level low-low and high-high. The changes are applicable to the replacement SGs in Unit 1. The licensee indicated that the changes had included the SG water level measurement uncertainties discussed in Westinghouse Nuclear Safety Advisory Letters (NSALs).
NSAL-02-3 and its revision dealt with the uncertainty in the SG water level measurement caused by the placement of mid-deck plate between the upper and lower pressure taps.
NSAL-02-4 dealt with uncertainties in the measurement created because the void content of the two-phase mixture above the mid-deck plate was not reflected in typical setpoint calculations.
NSAL-02-5 dealt with potential inaccuracies in the initial conditions assumed in safety analysis affected by SG water level. NSAL-03-9 discussed a program for Westinghouse Owners' Group that evaluated the effects on the SG water level control system uncertainties from various items, including the mid-deck plate, feedwater ring and feedwater ring supports, lower-deck plate supports, ono-recoverable losses due to carryunder, decrease in subcooling due to carryunder, and transient conditions due to event such as single loop loss of normal feedwater, etc..
(a) Please discuss how the specific plant accounted for the applicable uncertainties documented in the above Westinghouse NSALs in determining the SG water level (low-low and high-high) NTS and AV setpoints.
(b) Please discuss the results of non-LOCA transients that were analyzed to determine uncertainties for the SG water level low-low and high-high setpoints. Identify and justify the limiting cases used to determine the proposed NTS and AV setpoints. The discussion should include a description of the methods or computers codes used in the analysis, and demonstrate
the appropriateness of the methods and codes used.
(c) Please provide the actual calculations or the results of summary sheets for the proposed NTS and AV setpoints.
CC: Nakoski, John; Reyes-Maldonado, Ruth; Sun, Summer Mail Envelope Properties (45080639.B3F : 23 : 35106)
Subject:
Fwd: Preliminary Request for Additional Information- TAC Numbers MC9500 and MC9501 Creation Date 9/13/2006 9:23:05 AM From: Mohan Thadani Created By: MCT@nrc.gov Recipients nrc.gov OWGWPO01.HQGWDO01 JCB2 (Janet Burkhardt)
Post Office Route OWGWPO01.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 5052 9/13/2006 9:23:05 AM Options Expiration Date: None Priority: Standard ReplyRequested: No Return Notification: None Concealed
Subject:
No Security: Standard Junk Mail Handling Evaluation Results Message is not eligible for Junk Mail handling Message is from an internal sender Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled