ML062550424
| ML062550424 | |
| Person / Time | |
|---|---|
| Site: | Boiling Water Reactor Owners Group |
| Issue date: | 09/12/2006 |
| From: | Michelle Honcharik NRC/NRR/ADRA/DPR/PSPB |
| To: | Rosenberg S NRC/NRR/ADRA/DPR/PSPB |
| Honcharik M, NRR/DPR/PSPBPM, 415-1774 | |
| References | |
| Download: ML062550424 (5) | |
Text
September 12, 2006 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH BOILING WATER REACTORS OWNERS GROUP (BWROG)
DATE & TIME:
Wednesday, September 27, 2006 9:00 a.m. - 11:00 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16B2 Rockville, Maryland PURPOSE:
To discuss the path forward regarding a new approach to the calculation of available net positive suction head (NPSH) for emergency core cooling system pumps during postulated boiling water reactor (BWR) accidents.
CATEGORY 2*:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC BWROG M. Honcharik T. Abney R. Lobel A. Wojchouski, NMC, Committee Chairman M. Stutske Dilip Rao, GE J. Elmerick, TVA, Committee Vice-Chairman Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACTS:
Michelle Honcharik, NRR, 301-415-1774, mch3@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002
September 12, 2006 MEMORANDUM TO: Stacey L. Rosenberg, Chief Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Project Manager /RA/
Special Projects Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH BOILING WATER REACTORS OWNERS GROUP (BWROG)
DATE & TIME:
Wednesday, September 27, 2006 9:00 a.m. - 11:00 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 16B2 Rockville, Maryland PURPOSE:
To discuss the path forward regarding a new approach to the calculation of available net positive suction head (NPSH) for emergency core cooling system pumps during postulated boiling water reactor (BWR) accidents.
CATEGORY 2*:
This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at designated points identified on the agenda.
PARTICIPANTS:
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). [Add other offices as needed]
NRC BWROG M. Honcharik T. Abney R. Lobel A. Wojchouski, NMC, Committee Chairman M. Stutske Dilip Rao, GE J. Elmerick, TVA, Committee Vice-Chairman Project No. 691
Enclosure:
Agenda cc w/encl: See next page MEETING CONTACTS:
Michelle Honcharik, NRR, 301-415-1774, mch3@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002 ADAMS ACCESSION NO.:
ML062550424 NRR-106 OFFICE PSPB/PM PSPB/LA PSPB/BC NAME MHoncharik EHylton for DBaxley SRosenberg DATE 9/12/06 9/12/06 9/12/06 OFFICIAL RECORD COPY
DISTRIBUTION FOR FORTHCOMING MEETING WITH BWROG Date: September 12, 2006 PUBLIC PSPB Reading File RidsNrrAdar RidsNrrDpr RidsNrrDprPspb RidsNrrPMMHoncharik RidsNrrLADBaxley RidsOpaMail RLobel MStutske PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)
RidsNrrDe
BWR Owners Group Project No. 691 Mr. Doug Coleman Vice Chair, BWR Owners Group Energy Northwest Columbia Generating Station Mail Drp PE20 P.O. Box 968 Richland, WA 99352-0968 Mr. Amir Shahkarami Executive Chair, BWR Owners Group Exelon Generation Co., LLC Cornerstone II at Cantera 4300 Winfield Road Warrenville, IL 60555 Mr. Richard Libra Executive Vice Chair, BWR Owners Group DTE Energy - Fermi 2 M/C 280 OBA 6400 North Dixie Highway Newport, MI 48166 Mr. William A. Eaton Entergy Operations Inc.
P.O. Box 31995 Jackson, MS 39286 Mr. Richard Anderson First Energy Nuclear Operating Co Perry Nuclear Power Plant 10 Center Road Perry, OH 44081 Mr. Scott Oxenford Energy Northwest Columbia Generating Station Mail Drp PE04 P.O. Box 968 Richland, WA 99352-0968 Mr. James F. Klapproth GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Joseph E. Conen Regulatory Response Group Chair BWR Owners Group DTE Energy-Fermi 2 200 TAC 6400 N. Dixie Highway Newport, MI 48166 Mr. J. A. Gray, Jr.
Regulatory Response Group Vice-Chair BWR Owners Group Entergy Nuclear Northeast 440 Hamilton Avenue Mail Stop 12C White Plains, NY 10601-5029 Mr. Thomas G. Hurst GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 Mr. Tim E. Abney GE Energy M/C A-16 3901 Castle Hayne Road Wilmington, NC 28401 BWR Owners Group Mr. Randy C. Bunt Chair, BWR Owners Group Southern Nuclear Operating Company 40 Inverness Center Parkway/Bin B057 Birmingham, AL 35242 7/31/06
ENCLOSURE AGENDA September 27, 2006, Meeting with BWROG Calculation of NPSH for ECCS Pumps During Postulated BWR Accidents BWROG Overview
Background
BWROG Containment Overpressure Committee Work Scope Schedule for Major Activities Proposed Content of Report Public Comment