ML062540532

From kanterella
Jump to navigation Jump to search
Information Request for NRC Biennial Permanent Plant Modifications and 10 CFR 50.59 Baseline Inspection, Inspection Report 05000305/2006016
ML062540532
Person / Time
Site: Kewaunee 
(DPR-043)
Issue date: 08/31/2006
From: Dave Hills
NRC/RGN-III/DRS/EB1
To: Christian D
Dominion, Dominion Energy Kewaunee
References
IR-06-016
Download: ML062540532 (7)


See also: IR 05000305/2006016

Text

August 31, 2006

Mr. David A. Christian

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

KEWAUNEE POWER STATION, INFORMATION REQUEST FOR NRC

BIENNIAL PERMANENT PLANT MODIFICATIONS AND 10 CFR 50.59

BASELINE INSPECTION, INSPECTION REPORT 05000305/2006016(DRS)

Dear Mr. Christian:

On October 23, 2006, the NRC will begin a 10 CFR 50.59 and Permanent Plant Modifications

Baseline Inspection at the Kewaunee Power Station. This inspection will be performed in

accordance with NRC Baseline Inspection Procedures IP 71111.02 and IP 71111.17B. The

on-site portion of the inspection will take place on October 23 through 27, 2006, and November

13 through 17, 2006.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site, and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

The first group is necessary to ensure that the inspection team is adequately prepared for the

inspection. This information should be available to the Region III Office no later than

October 2, 2006. The inspection team will review the information, and by October 6, 2006, will

request specific items that should be available for review by October 16, 2006. The second

group of requested documents contains additional items that the team will review, or

need access to, during the inspection. Certain documents in the second group will be

requested for review in the Regional Office the week prior to the inspection. The remaining

documents should be available at the plant on October 23, 2006, the first day of the on-site

inspection. The third group lists information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. Documents to be

provided prior to the on-site portions of the inspection may be provided electronically via

electronic mail to the lead inspector or on compact discs. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. R. A. Langstaff. We understand that our regulatory

contact for the inspection is Mr. Jackiw of your organization. If there are questions about the

inspection or the material requested, please contact the lead inspector at (630) 829-9747 or via

e-mail at ral4@nrc.gov.

D. Christian

-2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

David E. Hills, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-305

License No. DPR-43

Enclosure:

Modification and 50.59 Inspection Document Request

(Information for Preparation Week and Information

Available On-site During Inspection)

cc w/encl:

L. Hartz, Site Vice President

C. Funderburk, Director, Nuclear Licensing

and Operations Support

T. Breene, Manager, Nuclear Licensing

L. Cuoco, Esq., Senior Counsel

D. Zellner, Chairman, Town of Carlton

J. Kitsembel, Public Service Commission of Wisconsin

State Liaison Officer, State of Wisconsin

D. Christian

-2-

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

David E. Hills, Chief

Engineering Branch 1

Division of Reactor Safety

Docket No. 50-305

License No. DPR-43

Enclosure:

Modification and 50.59 Inspection Document Request

(Information for Preparation Week and Information

Available On-site During Inspection)

cc w/encl:

L. Hartz, Site Vice President

C. Funderburk, Director, Nuclear Licensing

and Operations Support

T. Breene, Manager, Nuclear Licensing

L. Cuoco, Esq., Senior Counsel

D. Zellner, Chairman, Town of Carlton

J. Kitsembel, Public Service Commission of Wisconsin

State Liaison Officer, State of Wisconsin

DOCUMENT NAME:

G:\\DRS\\Dresden Input to Report 2005-010 WJS.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy

with attachment/enclosure "N" = No copy

OFFICE

RIII

E

RIII

N

N

NAME

DHills for RLangstaff: ls DHills for JLara

DATE

09/01/06

09/01/06

OFFICIAL RECORD COPY

D. Christian

-3-

ADAMS Distribution:

TEB

JFS2

RidsNrrDirsIrib

GEG

KGO

SXB3

CAA1

DRPIII

DRSIII

PLB1

TXN

ROPreports@nrc.gov

Enclosure

1

MODIFICATIONS AND 50.59 INSPECTION DOCUMENT REQUEST

Inspection Report: 05000305/2006016(DRS)

Inspection Dates:

October 23, 2006 through November 17, 2006

Inspection Procedures:

IP 71111.02, Evaluation of Changes, Tests, or Experiments

IP 71111.17B, Permanent Plant Modifications

Inspectors:

R. A. Langstaff, (Lead) Reactor Inspector

630-829-9747, ral4@nrc.gov

A. K. Dahbur, Reactor Inspector

630-829-9810, akd@nrc.gov

A.

Information Requested for In-Office Preparation Week

The following information is requested by October 2, 2006, or sooner, to facilitate the selection

of specific items that will be reviewed during the on-site inspection week. The inspectors will

select specific items from the information requested below and submit a list to your staff by

October 6, 2006. We will request that certain items be made available to the Regional Office

during the week prior to the inspection, no later than October 16, 2006. We request that the

remaining items selected from the lists be available and ready for review on the first day of

inspection. All requested information should cover the time frame from the last NRC

inspections of Evaluations of Changes, Tests or Experiments and Permanent Plant

Modifications inspection (exit October 21, 2005) to the present. If you have questions regarding

this information, please call the team leader as soon as possible.

1.

List of permanent plant modifications to risk significant systems, structures or

components. (For the purpose of this inspection, permanent plant modifications include

permanent: plant changes; design changes; set point changes; equivalency

evaluations; suitability analyses; and commercial grade dedications.)

The list should contain the number of each document, the title, the revision (or date),

and the affected system. In addition to the list, please provide a description of each

modification, and a list of associated calculations, and affected procedures.

2.

List the10 CFR 50.59 completed evaluations involving:

a.

calculations;

b.

procedure revisions;

c.

changes to the facility (modifications);

d.

non-routine operating configurations; and

e.

departures in methods of analyses.

The list should contain the number and title of each document, a brief description of the

change, and the corresponding number and type of the affected document (i.e., the

modification or procedure to which the evaluation applies). The list should NOT include

any evaluations in which prior NRC approval was sought and obtained.

Enclosure

2

3.

List of all 10 CFR 50.59 changes that have been screened out as not requiring a full

evaluation involving:

a.

calculations;

b.

procedure revisions;

c.

changes to the facility (modifications);

d.

non-routine operating configurations; and

e.

departures in methods of analyses.

The list should contain the number and title of each document, a brief description of

the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

4.

List of any modifications, procedure revisions, or UFSAR changes where it was

determined that 10 CFR 50.59 did not apply.

5.

List of corrective action documents (open and closed) that address plant permanent

modification or 10 CFR 50.59 issues, concerns, or processes. These documents should

also include corrective action documents associated with modification, and

10 CFR 50.59 change implementation.

The list should contain the number, title and revision, (or date), of each document, the

affected system and corresponding documentation, (if applicable), and should be sorted

in order of significance.

6.

Copies of procedures addressing the following: modifications, design changes, set point

changes, equivalency evaluations or suitability analyses, commercial grade dedications,

post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR

updates.

7.

UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of

the complete submittal.

8.

Name(s) and phone numbers for the regulatory and technical contacts.

9.

Current management and engineering organizational charts.

B.

Information Requested to be Available the Week Prior to Inspection (Request will

be made by October 6, 2006) or on the First Day of Inspection (October 23, 2006)

1.

Copies of all selected items from Section I. This includes copies of associated

documents such as calculations, post-modification test packages, 10 CFR 50.59

evaluations or screenings, and any corrective action documents.

2.

Copies of these documents do not need to be solely available to the team as long as the

inspectors have easy and unrestrained access to them.

a.

Updated Final Safety Analysis Report;

b.

Original FSAR Volumes;

Enclosure

3

c.

Original SER and Supplements (for Original FSAR);

d.

FSAR Question and Answers;

e.

Quality Assurance Plan;

f.

Technical Specifications;

g.

Latest IPE/PRA Report;

h.

Vendor Manuals; and

IV.

The Latest 10 CFR 50.59 FSAR Update Submittal.

3.

Please ensure that other supporting documents for the selected items have been located

and are readily retrievable as the team will likely be requesting these documents during

the inspections. Examples of supporting documents are:

a.

Drawings supporting the modifications;

b.

Procedures affected by the modifications; and

c.

UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

C.

Information Requested to be provided throughout the inspection

1.

Copies of any corrective action documents generated as a result of the inspectors

questions or queries during this inspection.

2.

Copies of any corrective action documents generated that are related to documents

requested from the second group of documents (Section B above). For the purposes of

this request, only corrective action documents generated since the requested was made

(i.e., approximately October 6, 2006) need be provided.

3.

Copies of the list of questions submitted by the team members and the status/resolution

of the information requested, (provide daily during the inspection to each team

member).

If you have questions regarding the information requested, please contact the team leader.