- - -. . Page From:

To: .<bJV@nrc.gov>, <EXN1@nrc.gov>

Date: 10/25/03 9:35AM

Subject:

PSEG Dave and Eileen, The following is a copy of an email sent out at PSEG Nuclear on Thursday, October 23.

While I do not believe it conveys the view of the outage manager or site outage manager, I do believe it gives great insight into the current production culture at the site. No matter who wrote it or how it got sent out without adequate management review, it signals a "paradigm" that I believe is inconsistent with "Safety First." To my knowledge, no correction has been sent out.

The bold is mine.

All the typos, grammatical errors, etc. are the original.

From: Fitchett, Melissa J.

Sent: Thursday, October 23, 2003 12:16 PM.

To: LISTC.NBU.SUPVRS-SUPTS; MANAGERS Cc: SECRETARIES; Dunn, Richard J.; OHare, Kevin F.

Subject:

Mid-Outage Safety Stand Down Roll-out~

Importance: High Due to some confusibn I am sending this email to provide supervisors/managers with a copy of the Mid-Outage Safety Stand down-presentation that will be held tomorrow (1'0/24). This isa result of numerous incidents that have resulted in safety concerns, tagging and OSHA recordables. The Safety Line of Business Council, Management Representatives,. Safety Department, and the Outage Group have meet frequently over the past week to address these issues.

This will be conducted by Supervisors or their designee. The duration is an hour long, with time for discussion. Please coordinate your rollouts appropriately as to not hinder our outage schedule. Thi~s is a mandatory Mid-O'utage Safety Stand down. Attendance will be captured in SAP. The presentation come complete with Presentation Guide for those rolling this information out. For any questions please contact Kevin O'Hare 2682 or the Safety Outage Coordinator 1647. Thank You!

lnoraU~ n tis etT~wal del inaccordance With he Freedom of Infor'matiOn Act, exemptions " e'eO FOIA-

I Page Dave and Eileen, Tile following is a copy of an emnail sent out at PSEG Nuclear on Thursday, October 23. While I do not believe it conveys the view of the Outage mianager or site outage manager, I do believe it gives great insight into the Current production Culture at thle site. No matter who wrote it or how it got sent out without adequate management. review, it signals a "paradigml" that I believe is inconsistent wvith "Safety First." To my knowledge, no correction has been sent out. Thle bold is mine. All thle typos. grammatical errors, etc. are the original.

From: Fitchett, Melissa J.

Sent: Thursday, October 23, 2003 12:16 PM To: LISTC.NBU.SUPVRS-SUPTS; MANAGERS Cc: SECRETARIES; Dunn, Richard J.; OHare, Kevin F.

Subject:

Mid-Outage Safety Stand Down Roll-out Importance: High Due to some confusion I am sending this email to providei supervisorslmanagers with a copy of the Mid-Outage Safety Stand down presentation that will be held tomorrow (10/24). This is a result of numerous incidents that have resulted in safety concerns, tagging and "OSHArecordables. The Safety Line of Business Council, Management Representatives, Safety Department, and the Outage Group have meet frequently over the past week to address these issues. This will be conducted by Supervisors or their designee. The duration is an hour long, with time for discussion. Please coordinate your rollouts appropriately as to not hinder our outage schedule. This is'a mandatory Mid-Outage Safety Stand down. Attendance will be captured in SAP. The presentation come complete with Presentation Guide'for those rolling this information out. For any questions please contact Kevin O'Hare 2682 or the Safety Outage Coordinator 1647. Thank You!

Page.

Received: from igate.nrc.gov by nrcgwVia.nrc.gov; Sat, 25 Oct 2003 09:35:02 -0400 Received: from imo-r07.mx.aol.com (imo-r07.mx.aoI.com [152.163.225.103))

by smtp-gateway ESMTPce id h9PDUD6n004341:

Sat, 25 Oct 2003 09:30:13 -0400 (EDT)

Received: from -I,

-by imo-r07.mx.aol.comn (mail-out-v36_r.1.) idf.b9.380f01d7 (18555);

Sat 25 Oct 2003 09:34:43 -0400 (EDT)

Froml IZ.W Date: Sat', 25 Oct 2Q03 09:34:43 EDT

Subject:

PSEG To: DJVgnrc.gov, EXNl@nrc.gov MIME-Version: 1.0 Content-Type: multipart/alternative: boundary="---------------------1067088883" X-Mailer' 9.0 for Windows sub 921 Content-Type: text/plain; charset="US-ASCII" Content-Transfer-Encoding: 7bit Dave and Eileen, The following is a copy of an email sent out at PSEG Nuclear on Thursday, October 23:

While I do not believe it conveys the view of the outage manager of site outage manager, I do believe it gives great insight into the current production culture at the site. No matter Who wrote it or how it got sent out without adequate management review, it signals a "paradigm" that I believe is inconsistent with "Safety First." To my knowledge, no correction has been sent out.

The~bold is mine.

All'th'etypos, grammatical errors. etc. are the original.

From: Fitchett, Melissa J Sent: Thursday. October 23. 2003 12:16 PM To: LISTC.NBU.SUPVRS-SUPTS;,MANAGE-RS Cc: SECRETARIES; Dunn, Richard J.; OHare, Kevin F.

Subject:

Mid-Outage Safety Stand Down Roll-out Importance: High Due to some confusion I am sending this email to provide supervisorstmanagers with a copy of the Mid-Outage Safety Stand down presentation that will be held tomorrow (10124). This is a result of numerous incidents that have resulted in safety concerns, tagging and OSHA recordables. The Safety Line of Business Council, Management Representatives, Safety Department, and the Outage Group have meet frequently over the past week to address these issues.

This will be conducted by Supervisors or their designee. The duration is an hour long, with time for discussion. Please coordinate your rollouts appropriately as to not hinder our outage schedule. This is a mandatory Mid-Outage Safety Stand down. Attendance will be captured in SAP. The presentation come

-... '-~~-'~'-Page 2 complete with Presentation Guide for those rolling this information out. For any questions please contact Kevin O'Hare 2682 or the Safety Outage Coordinator 1647. Thank You!


-------- 1067088883 Content-Type: text/html; charset="US-ASCIl" Content-Transfer-Encoding: quoted-printable 4-ITML><HEAD>

<~META charset=UTF-8 http-equiv=Content-Type content="textlhtml; charse t=utf-8">

<CMETA content="MSHTML 6.00.2800.1264" name=GENERATOR></HEAD>

<BODY style ="FONT-SlZE: 1Opt: FONT-FAMILY: Arial; BACKGROUND0-COLOR: #fffff

Dave and Eileen,<IDIV>
 <IDIV>
The following is a copy of an email sent out at PSEG Nuclear on Thursda
y. October 23.
 <IDIV>
While I do not believe it conveys the view of&nbsp*,thb outage manager o irsite outage manager, I do believe it gives great insight into the current production culture at the site.  No matter who wrote it or. how it got s ent out without adequate management review, it signals a "paradigm" that I b elieve is inconsistent wvith "Safety First.'  To my knowledge, no correc tion has been sent out.<IDIV>
 <lDIV>
The bold is mine. ,
 
All the typos, grammatical errors, etc. are the original,
 
 
From: Fitchett. Melissa J.
Sent: Thursday; October 23. 2003 12:16 PM
To: LISTC.NBU.SUPVRS-SUPTS, MANAGERS
Cc: SECRETARIES; Dunn. Richard J.; OHare, -Kevin F.
Subject Mid-Outage Safety Stand Dowvn Roll-out
cB R>lmportance: High
<IFONT>
  • Due to some confusion I amn sending this email to provide supervisors/

managers with a copy of the Mid-Outage Safety Stand down presentation that w ill be&nbsp~held tomorrow (10124).&nbsp: This is a result of numerous incide nts that have resulted in safety concerns, tagging and OSHA recordables.&nbs p; The Safety Line of Business Council, Management Representatives, Safety D epartment, and the Outage Group have meet frequently over the past week to a ddress these issues.  <lSAN><IFONT><IDIV>

'cDIV>This will be conducted by Supervisors or their designee.&nbsp,;&nbsp:

The duration is an hour long, with time for discussion.&nbsp: 'Please coordinate your rollouts appropriately as to not hinder our outage schedule

.<ISTRONG>  This is a mandatory Mid-Outage Safety Stand down.  Att endance wifll be captured in SAP.  The presentation come complete with P resentation Guide for those rolling this information out.&nbsp: For any q'ues tions please contact Kevin O'Hare 2682 or the Safety Outage Coordinator 1647'

.  Thank YouWcS PAN><IFONT></OIV>

'c/DIV><IBODY></HTML>
---------- 1067088883--