E-Mail to Vito, Salem Unit 1 Circ Water
ML062540373
Person / Time
Site: Salem 
(DPR-070)
Issue date: 09/26/2003
From:
- No Known Affiliation
To: Neff E, Vito D
Office of Nuclear Reactor Regulation
References
FOIA/PA-2005-0194
Download: ML062540373 (11)


Text

La.: Vito..-.Salem Uniit 1 Circ Water..

  • Pa ge 1f

.a..e.1 I

I From:

To:

-<djv

""'-.nrc.gov>,

<exnl@nrc.gov>

Date:

9/26/03 1:56PM

Subject:

Salem Unit 1 Circ Water Dave and Eileen, I have found a way to upload the files and send to you.

I have not "screened" these for relevance..1 am sending what I have and trust your technical guys to do that.

Thanks, Kymn

.. I -

Information in this record was deleted in accordance with the Freedom of Information Act, exemptions FOJA-.

CU -

/

David Vito -'J.-30-1's sorted by Due Date.rtf Page 11 Work Week 109 30-1's Sorted by Date/Time to Number~ lnilolior.

Eolension:

Dael:

0217 0

2103*3 Moda Cod.:

NotificatlionIOrdart:

==

Description:==

Pr ent4 La.Laenance I HOXE11 ckek aco s all$ Mu. as foundper procedure look adon

  • tSA&D Egt;ineeting to see if they codd assist. Cen't startl on el becsus4 once they tip the blaker apel we late the as found datl end UMe procedure calls lot it.

release lags fae alphs and braoe &~.l all Is anse pumps. ae tagout fot The alpha diesel eutage togout 4009=2 tagls vnl not be ieleasid because there are outstasfintg W updte tenel Cols. ilt push to 2nd shtilt 0219 2V3103 0220 0221 0

213103 0

2)2103

"-ash rack saol repair 60027627 At. to Yard ept fured seep G 1450 not enough ime for u to wk orILt, Ithere we going to be us;ing 9t rfck for 4-6 hours edaykisnimposs=ae to teake repairs n the rals as we would Eke to. We need to come alp wtt a better plan to get mote tine an the ji& or e.

V40 be Met Thet.toevery tong tin-.

OCP pfob.em 11000*2367

- paens print and wording poUen.

jito,7 v

1to,-

1-30-ls, o sorted-by'Due Da ie.'rtf.

Page I Monday. FebrUary 03. 2003 04:56 PM

Davi Vi't-o--1--30"-'-'1s-o"tedb,,y Due Da**exls Pa......

P aq e 1 ID Numbei Initatior 217 219 Extension Date 0

03-Feb-03 0

03-Feb-03 Mode CodE Notification/Order; 0

03-Feb-03 0

03-Feb-03 Vll\\ L/

by Due Date...s Page 2 Description Preventative Maintenance 1H8X Breaker comes off H Bus as found per procedure looked on prints, in SAP & DCP can't find any sett release tags for alpha and bravo fuel oil transfer pumps - one lagout for the alpha diesal outage tagout 4009022 tags will not Trash rack rail repair 60027627 Act. 10 Yard Dept turned over

@ 1450 not enough time for us to work on it. If there are going DCP problem 80002367 -parts, print and wording problem.

ba.v -I.I Vito - Ac.tio.n

-It..emnIs for..Ci r c-Se,rv.i -ce Wa ter.2 00.3..ls Page 1*

I ID Number Owner 3

5 17 13 Description Completion 0 Notification/Ord Repair wave walls for CW and install.

138 Repair complete. Will install on 2/03/03, late afternoon at low tide Repair/install ice barrier at SW Intake. Evaluate for parts.

Issues to ensure fish lip DCP starts on 2/10/03 for 21A.

- Stop work on fabrication at CMS On schedule - verified 1/27/03.

Security bar adjustment north trough. Per drawings.

north trough needs to be lowered!

20127746 -Adjust and tighten security How far is it necessary to derate the unit with both water boxes out - revisit calc in light of river temp on hot well levels.

14 40 How many baskets to ship with screen?

Finalize criteria for disbanding OCC.

2A Hot Air Furnaces will not fire. (South side SW Furnances) 65 73 W

Aux. Feedwater storage flows. This is causing a because we are spilling Heat Trace repair for 11[

75 N,

Heat Trace.

HC SSW Flow Instrumer IST.

Service Water pump tesl 78 iafter the return of "B" dei 1lOTon C02 compresorS around/no auto function 1*5 Compressor cycles cont.

tank periodically over NJDEPES concern hydrazine onto

)M144 ntation not acceptable for schedu!ed for Monday s

iafety Issue/Operator Work 129 H

Fdu HHB Feed Pumps

SD.vd Vito,' Action Items for CircService Water 2003.xls Pa-qe 2 Comments Scheduled for Monday, 2/3/03 Engg. Walked down ice barrier 1

nd Ja*

oo evaluate repairs on on" r 2/3/03.

Working to release funding.

Stop work at CMS is still an issue QA has put parts Fab by CMS on Pysher to discu Work to be given to dedicated Circ Water Hit Team 2/3/03.

LER from 1989 found still looking for calcs.11K ill address this beginning Wednesday.

IM to see if N1 is in syst 1 screen @ lovejoy due back end of March.

1 screen sent on Monday 1/27 due back in 3 weeks.

Vendor to call Mon. morning 2/3 Draft criteria developed.

Need to get vendor in to help turne. Req.

10454757 being processed PO to be issued Mon. 2/3/03.

Monitor for leakage. Suspect 3gph Field work In progress ETC 02103/03 at 1600.

WIN Team - WIP Monday Vendor coming on site.

Monday, 2/3/03 AoNlilIfiaint of contact Need new compressor or new compressor seal ETA from procurement. This part is no longer available. The vendor (Brandco) does Scheduled maint this week.

1 - Packing replaced. Ready to run.

2 - Alignment etc - 40 hrs of work Field work i

.12ý

David Vito. Action Itefrms for Circ Service W*aer 2003ý.xs..

[Evil~

131

  1. 2 HHB control circuit troubleshooting - Do we have the support to complete the troubleshooting so that the boiler can be retur 133 12B Circ Water entrainment pump inop. NJPDES requirement is to take weekly samples. With the 12B inoperable the other samplin 156 175 190 191 198 204 205 210 Now F**

211 215 216 Schedule 1 & 3 to be worked.

21 Rod Drive MG and Meter not reading correctly need to evaluate if unit can be sync'd.

Elevator inoperable service bldg - fix in a.m.

1 HW211 - Ops determine need to work valve Bring In vendor to assist troubleshooting persistent HC Boiler Issues.

FRVS-Flow Monitor Card Aux Bldg Ventilation Plan Exit Criteria CW Boiler will not fire. Carucci notified.

1 FP952 Significant leak (10 gpm out'of service), 50-150 gpm in service. WIN notified.

13A & 13B Circ diff turbing cross connects 1 ICH181 - Pri Chem Lab - Hi temps in lab - fix the chill water valve

j. David Vito - ACi'6n leiems for CircService Water 2003.xls PO issued. Vendor coming in on Monday. 213/03

@10:00. P. O. #4500185527.

WIN team working 02/03103 days for Troubleshooting. Pump bad and controller WIN Team working days only. Need new pump - ord CW Bearing Lube PP status as follows: #1 pump C/T (60030779); #2 pump repaired; #3 Pump running with low discharge pressure -

Working on Tues. 02104/03 Mtg. To resolve. MG scheduled to back 02/05/03.

Repair coming in 0700 2/3103.

Leak Repair to look at 1 HW21 1 for future leak repair.

H1 o work with vendo o*

II 3 boilers operable.

Parts in. Hands on card - done. HC to decide on when to repair.

System Health - Days Paae 4 I Paoe 4 1

Vito-L Mime.822 Page!]

Received from igate.nrc.gov by nrcgwia.nrc.gov; Fri, 26 Sep 2003 13:55:59 -0400 Received. from imo-m05.mx.aol.com (imo-m05.mx.aol.com [64.12,136.8])

by smtp-gateway ESMTPoe id h8QHpATY015979; Fri, 26 Sep 2003 13:51:11 -0400 (EDT)

Received: from Drkymn@aol.com by imo-m05.mx.aol.com (mail out. v36_rl.1.) id f.lel.10938873 (16035);

Fri, 26 Sep 2003 13:55:48 -.0400 (EDT)

Received: from aol.com (mow-m26.webmail.aol.com [64.12.137.31) by air-id10.mx.aol.com (v96.6) with ESMTP id MAILINID102-3ea33f747da42ee; Fri, 26 Sep 2003 13:55:48 -0400 Date Fri Se 2003 13;55:48 -0400

.. FrondO

-40 To: djv@nrc.gov, exnl@nrc.gov

Subject:

Salem Unit 1 Circ Water MIME-Version: 1.0 Message.-ID: <72331CD8.6094C1E2.00049705@aol.com>

X-Mailer: Atlas Mailer 2.0 X-AOL-IF: 207.106.153.65 Content-Type: multipart/mixed; boundary=----7237681060990dla7237681060990dla Content-l'ransfer-Encoding: 8bit

I DcAiJ Vito M

-iime.822 Page 2 I I

-- I

'4 Click to view Base64 Encoded File 10-30-I's sorted by Due Date.xls