ML062430652

From kanterella
Jump to navigation Jump to search
Midcycle Performance Review and Inspection Plan - Diablo Canyon Power Plant
ML062430652
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/31/2006
From: William Jones
NRC/RGN-IV/DRP/RPB-B
To: Keenan J
Pacific Gas & Electric Co
References
Download: ML062430652 (7)


Text

UNITED STATES NUCLEAR REGULATORY C O M M I S S I O N REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 August 31, 2006 John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, CA 94177-0001

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DIABLO CANYON POWER PLANT

Dear Mr. Keenan:

On August I O , 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Diablo Canyon Power Plant Units Iand 2 was within the Licensee Response Column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green).

Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31,2008. In addition to baseline inspections, we plan to conduct the temporary instructions identified in the inspection plan. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the annual performance assessment review.

Pacific Gas and Electric Company Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely, ba%$=--

William B. JoneUChief Project Branch B Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82

Enclosure:

Diablo Canyon Inspection/Activity Plan cc w/enclosure:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie P.O. Box 15755 San Luis Obispo, CA 93406

Pacific Gas and Electric Company Nancy Culver San Luis Obispo Mothers for Peace P.O. Box 164 Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of Supervisors County Government Building 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission 505 Van Ness Ave., Rm. 4102 San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.

Legal Counsel 857 Cass Street, Suite D Monterey, CA 93940 Director, Radiological Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7414 Richard F. Locke, Esq.

Pacific Gas and Electric Company P.O. Box 7442 San Francisco, CA 94120 City Editor The Tribune 3825 South Higuera Street P.O. Box 112 San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)

Sacramento, CA 95814

Pacific Gas and Electric Company Jennifer Tang Field Representative United States Senator Barbara Boxer 1700 Montgomery Street, Suite 240 San Francisco, CA 941 11 Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Pacific Gas and Electric Company Electronic distribution by RIV:

Regional Administrator (BSMI)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJCI)

Senior Resident Inspector (TWJ)

Branch Chief, DRPIB (WBJ)

Senior Project Engineer, DRPIE (FLB2)

Team Leader, DRPITSS (RLNI)

RITS Coordinator (KEG)

RidsNrrDirslpab@nrc.g ov V. Dricks, P A 0 (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPSI)

B. Wetzel, Chief, TRPS, OED0 (BAW)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

A. Wang, NRR Project Manager for DC (ABW)

SUNS1 Review Completed: W B J - ADAMS: J Yes No Initials: -WBJ J Publicly Available 0 Non-Publicly Available Sensitive J Non-Sensitive R:\-REACTORS\EOC and Midcycle\Midcycle Assessment Letters\2006\DC 11 RIV:C:DRP/B concurrence I D:DRS I D:DRP I C:DRP/B signature II WBJones;dlf;mjs DDChamberlain ATHowell Ill WBJpes

/RA/ RJCaniano /RA/

8/23/06 8/24/06 8/25/06 8/Tfl06

m m m m c

0 0

- .o- .P-C

.E!

0 C

0 C

0

.P c

m C

0 urn m

C

.P c

0 un un un a n, m

C

.-0 0

a, a

m B

m m m B B a n m m R

-8 -C -C -C L L -m .om .om .om

.o -C a, m a ,

-E a Z Z Z .-

.-- -m a-,

.E .E a a a a a, a a a 6 c c - - s m m m 0 0 0 0 m m m m z z z z m W

0 W ( D W W W b 0

0 0 0 0 0 0

. sss c!

d 0 0 0

?

  • !*? !*e 0

ea ?m!0 0

N 0

7 0

b eN ?N c?

m 0

0 0 0 T - 7 W W W 0 b

0 0 0

N 0

0 N

G G 0

N .

0 N

(D 7

e ? N z

0 b  :: 0 r m m F i n In Fu m

a, m

C c m 0

c m

h E 6 E C m a, P n

C f .-

C 0

c c U

0 m 0

E ti U

-m C

!E m3 6

c 9

B U

-1 0 c L U .-c 0

- E 8 2 m

x C

0 0 U

E a, e, sC

$n W E 1 8

m 0

0 I I I I

b b b r.t.bbt. b t . b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

$ $ $ g g g g s $ $ $

$ $ $ 2 b b 2 b 2 b2 tP.  ? ? ?

0 0 0 0 0 0 0 0 6 6 6 0 0 0 6 6 0

6 6 6 0 0 0 0 g g g C F C

  • 0 0
  • 0
  • - - - - r i0= i0= i0= i0= i0=

.-C0 c

m C

a, E?

cn

.-m 2C -

n E

C

.-0 c

C

.-c 0

a e

m c

m0 F .-C -v, c

0 E cE m rn c eC .-80 5 cnR 6 E -

c L1) c L

0

.-m0 c C

0 a,

m C

0 U C m w i

m Q U UC E

c 0

K z .-C 0)

C m

a, 0 C 8

0 z 3 U C a

m .-

c C a, 0 gs 2 2 g 7 m

W 3

a E

c

-Um K

n 0) u n

W 2In u 0