UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2006 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
LIMERICK GENERATING STATION
Dear Mr. Crane:
On August 7, 2006, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in accordance with 10 CFR 2.390" will include the physical protection review and resultant inspection plan.
Plant performance for the most recent quarter at Limerick Units 1 and 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan to conduct independent spent fuel storage installation (ISFSI) inspections.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
2 C. Crane If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5186 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
James M. Trapp, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan cc w/encl:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear
2 C. Crane If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5186 with any questions you may have regarding this letter or the inspection plan.
Sincerely, James M. Trapp, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Enclosure:
Limerick Inspection/ Activity Plan Distribution w/encl:
(via E-mail)
S. Collins, RA M. Dapas, DRA B. Sosa, RI OEDO D. Roberts, NRR J. Kim, PM, NRR E. Miller, PM, Backup J. Trapp, DRP C. Khan, DRP S. Hansell, DRP - Senior Resident Inspector C. Bickett, DRP - Resident Inspector L. Pinkham - Resident OA Region I Docket Room (with concurrences)
D. Screnci, PAO N. Sheenhan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs RidsNrrDiplipb@nrs.gov Institute of Nuclear Power Organization (INPO)
SUNSI Review Complete: ___CBK________ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 7 Mid Cycle Review\\2006 ROP7 Mid-Cycle Letters\\LIM 2006 Mid-cycle Letter.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP E
NAME SHansell/CBK FOR CKhan JTrapp DATE 08/31/06 08/31/06 08/31/06 OFFICIAL RECORD COPY
Limerick Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/31/2006 11:43:01 Report 22 1
71151
- EP PI VERIFICATION Baseline Inspections 08/07/2006 08/11/2006 1, 2 71151 IP Performance Indicator Verification 2
7111107B
- HEAT SINK Baseline Inspections 08/14/2006 08/18/2006 1, 2 7111107B IP Heat Sink Performance 1
7111112B
- MAINTENANCE RULE Baseline Inspections 09/18/2006 09/22/2006 1, 2 7111112B IP Maintenance Effectiveness 4
10/23EXM
- OPERATOR LICENSE INIITAL EXAMS Not Applicable 09/25/2006 09/29/2006 1
U01664 FY07-LIMERICK INITIAL OPERATOR EXAM Not Applicable 10/23/2006 11/03/2006 1
U01664 FY07-LIMERICK INITIAL OPERATOR EXAM 3
MODS
- MODS AND 50.59 Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111117B IP Permanent Plant Modifications 1
TI-169
- TI: MSPI VERIFICATION Safety Issues 11/06/2006 11/10/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 1
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 11/27/2006 12/01/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7112101
- OCC RAD SAFETY Baseline Inspections 01/08/2007 01/12/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
7111108G
- U2 IN-SERVICE INSPECTION Baseline Inspections 03/12/2007 03/16/2007 2
7111108G IP Inservice Inspection Activities - BWR 1
7112102
- OCC RAD SAFETY Baseline Inspections 03/19/2007 03/23/2007 1, 2 7112102 IP ALARA Planning and Controls 2
6/2 EXAM
- INITIAL LSRO OPERATOR EXAM Not Applicable 05/05/2007 05/09/2007 1
U01659 FY07 - LIMERICK (UNIT 1&2) INITIAL LSRO EXAM Not Applicable 06/02/2007 06/06/2007 1
U01659 FY07 - LIMERICK (UNIT 1&2) INITIAL LSRO EXAM 1
- ISFSI CONSTRUCTION INSPECTION Other Routine 04/01/2007 09/30/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
71114
- EP PRGM INSP Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 06/10/2007 06/14/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/10/2007 06/14/2007 1, 2 71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Limerick Inspection / Activity Plan 07/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/31/2006 11:43:01 Report 22 3
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]
3 7111111B
- L.O.(PWR.) REQUAL. PROG. + P/F REVIEW Baseline Inspections 09/24/2007 09/28/2007 1, 2 7111111B IP Licensed Operator Requalification Program Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111111B IP Licensed Operator Requalification Program 4
7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151-EP03 IP Alert & Notification System 2
7111111B
- LSRO REQUAL AN OPTEST @PB + P/F REVIEW Baseline Inspections 11/01/2007 11/01/2007 1, 2 7111111B IP Licensed Operator Requalification Program 6
7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.