Mid-Cycle Performance Review and Inspection Plan
ML062430441
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/31/2006
From: Eric Duncan
NRC/RGN-I/DRP/PB6
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
Download: ML062430441 (7)


Text

August 31, 2006 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

DAVIS-BESSE NUCLEAR POWER STATION

Dear Mr. Bezilla:

On August 7, 2006, the NRC staff completed its performance review of Davis-Besse Nuclear Power Station for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter at Davis-Besse was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

The enclosed inspection plan details the inspections, less those related to physical protection scheduled through March 31, 2008. In addition to the program defined inspection activities, additional oversight activities will be conducted to follow up on the independent assessments in the areas of Operations, Engineering, Corrective Action Program, and Safety Culture/Safety Conscious Work Environment, as required by our March 8, 2004, Confirmatory Order (EA-03-214). The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections scheduled within the last 9 months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

M. Bezilla If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page

M. Bezilla If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 6 Division of Reactor Projects Docket No. 50-346 License No. NPF-3

Enclosure:

Davis-Besse Nuclear Power Station Inspection/Activity Plan DISTRIBUTION:

See next page DOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2005 to 2006\davis besse\Davis Besse 2006 MOC ltr.wpd X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII NAME RRuiz:dtp EDuncan DATE 08/30/06 08/30/06 OFFICIAL RECORD COPY

M. Bezilla cc w/encl: The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners Ottawa County Sheriff Director, Ottawa County EMA Lucas County Sheriff Director, Lucas County EMA Genoa Village Administrator Mayor of Clay Center Mayor of Elmore Mayor of Genoa Mayor of Oak Harbor Mayor of Toledo Mayor of Port Clinton Mayor of Marblehead Mayor of Rocky Ridge Village Administrator of Oak Harbor Mayor of Put-in-Bay INPO

M. Bezilla ADAMS Distribution:

TEB SPS1 SJC4 RidsNrrDirslpab JLC1 GEG KGO RML2 SRI Davis-Besse DRPIII DRSIII PLB1 TXN

Page 1 of 2 Davis-Besse 08/30/2006 12:57:26 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 93812 - IN PROCESS ENGINEERING CY 06 EVALUATION 1 1 IP 93812 Special Inspection 09/11/2006 09/22/2006 Event Response Insp PI&R - PROBLEM IDENTIFICATION & RESOLUTION TEAM 6 1 IP 71152 Identification and Resolution of Problems 10/30/2006 11/17/2006 Baseline Inspections IP 71122 - ACCESS CNTL, RADWASTE & TRANSPORTATION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/16/2006 10/20/2006 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 10/16/2006 10/20/2006 Baseline Inspections 1 IP 71151 Performance Indicator Verification 10/16/2006 10/20/2006 Baseline Inspections 93812 - IN PROCESS SC/SCWE CY06 EVALUATION 1 1 IP 93812 Special Inspection 11/06/2006 11/17/2006 Event Response Insp 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification Program 11/13/2006 11/17/2006 Baseline Inspections HS - HEAT SINK INSPECTION 1 1 IP 7111107B Heat Sink Performance 12/11/2006 12/15/2006 Baseline Inspections 7112201 - EFFLUENTS, ACC CNTL 1 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/22/2007 01/26/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 01/22/2007 01/26/2007 Baseline Inspections FPI - FIRE PROTECTION TRIENNIAL 3 1 IP 7111105T Fire Protection [Triennial] 03/19/2007 04/06/2007 Baseline Inspections EP BI - BASELINE EP EXERCISE INSP 1 1 IP 7111401 Exercise Evaluation 05/14/2007 05/18/2007 Baseline Inspections 1 IP 71151-EP01 Drill/Exercise Performance 05/14/2007 05/18/2007 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 05/14/2007 05/18/2007 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 05/14/2007 05/18/2007 Baseline Inspections 7112103 - RP INSTRUMENTATION & SCBA 1 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 05/28/2007 06/01/2007 Baseline Inspections MAINRULE - MAINTENANCE RULE INSPECTION 1 1 IP 7111112B Maintenance Effectiveness 06/25/2007 06/29/2007 Baseline Inspections ISFSI - ISFSI INSPECTION 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/10/2007 07/10/2007 Other Routine 7112102 - ALARA PLANNING 1 1 IP 7112101 Access Control to Radiologically Significant Areas 08/06/2007 08/10/2007 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 08/06/2007 08/10/2007 Baseline Inspections CDBI - COMPONENT DESIGN BASES INSPECTION 6 1 IP 7111121 Component Design Bases Inspection 11/12/2007 12/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Davis-Besse 08/30/2006 12:57:26 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 71121.01 - ACCESS CONTROL AND PI VERIFICATION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 12/03/2007 12/07/2007 Baseline Inspections 1 IP 71151 Performance Indicator Verification 12/03/2007 12/07/2007 Baseline Inspections FY 2007 - DAVIS-BESSE INIT PREP 08/2007 3 1 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 01/28/2008 02/01/2008 Not Applicable MOD/5059 - MODIFICATION/50.59 INSPECTION 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 01/28/2008 02/01/2008 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 01/28/2008 02/01/2008 Baseline Inspections FY 2007 - DAVIS-BESSE INIT EXAM 09/2007 3 1 W90159 OL - INITIAL EXAM - DAVIS BESSE - AUG/SEP 2007 02/18/2008 02/29/2008 Not Applicable ISI - ISI AND TI-150 INSPECTION 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA 02/18/2008 03/31/2008 Safety Issues 1 IP 7111108P Inservice Inspection Activities - PWR 02/18/2008 03/31/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.