Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/2008
ML062430371
Person / Time
Site: Saint Lucie, 07200061  NextEra Energy icon.png
Issue date: 08/31/2006
From: Joel Munday
NRC/RGN-II/DRP/RPB3
To: Stall J
Florida Power & Light Co
Shared Package
ML062430362 List:
References
Download: ML062430371 (6)


Text

August 31, 2006 Florida Power and Light Company ATTN:

Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - ST. LUCIE NUCLEAR PLANT

Dear Mr. Scarola:

On August 2, 2006, the NRC staff completed its performance review of the St. Lucie Nuclear Power Plant for the first half of the calendar year 2006 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and a resultant inspection plan.

Overall, both St. Lucie Units operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for St. Lucie Units 1 and 2 for the most recent quarter was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to the ROP baseline inspections, we plan to conduct non-baseline inspections involving containment sump blockage, verification of Mitigating Systems Performance Index, and Independent Spent Fuel Storage Installation.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through March 31, 2008. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last twelve months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

FP&L 2

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4560 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Joel T. Munday, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-335, 50-389, 72-61 License Nos.: DPR-67, NPF-16

Enclosure:

St. Lucie Inspection/Activity Plan cc w/encl: (See page 3)

FP&L 3

cc w/encl:

William E. Webster Vice President, Nuclear Operations Florida Power & Light Company Electronic Mail Distribution Gordon L. Johnston Acting Vice President St. Lucie Nuclear Plant Florida Power & Light Company Electronic Mail Distribution Christopher R. Costanzo Acting Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Bill Parks Acting Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Terry L. Patterson Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Mark Warner, Vice President Nuclear Operations Support Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Managing Attorney Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi, Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Douglas Anderson County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982

Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2006 15:18:22 Report 22 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 5

EB2-TFP

- TRIENNIAL FP PRE-INSPECTION VISIT Baseline Inspections 09/05/2006 09/07/2006 1, 2 7111105T IP Fire Protection [Triennial]

4 EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 10/16/2006 10/20/2006 1, 2 7111105T IP Fire Protection [Triennial]

1 PSB1-RP

- RP PUBLIC PRE-INSP VISIT Baseline Inspections 10/09/2006 10/11/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4

PSB1-RP

- RP PUBLIC BASELINE INSP Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 10/30/2006 11/03/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 10/30/2006 11/03/2006 1, 2 71151 IP Performance Indicator Verification 2

EB3-HS

- HEAT SINK Baseline Inspections 01/08/2007 01/12/2007 1, 2 7111107B IP Heat Sink Performance 1

PS2-EP

- EP INSP Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 02/05/2007 02/09/2007 1, 2 71151 IP Performance Indicator Verification 4

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 02/26/2007 03/02/2007 1, 2 7111117B IP Permanent Plant Modifications 1

PSB1-RP

- RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 04/02/2007 04/06/2007 1

7112101 IP Access Control to Radiologically Significant Areas 1

EB3-ISI

- U1 INSERVICE INSPECTION Baseline Inspections 04/09/2007 04/13/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB3SGISI

- U1 STEAM GENERATOR ISI Baseline Inspections 04/16/2007 04/20/2007 1

7111108P IP Inservice Inspection Activities - PWR 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)

Event Response Insp 04/22/2007 04/27/2007 1

93812 IP Special Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2006 15:18:22 Report 22 1

60854

- ISFSI CONSTRUCTION Other Routine 07/09/2007 07/13/2007 1

60854 IP Preoperational Testing Of An ISFSI 6

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 10/09/2007 10/11/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 2

7111108P IP Inservice Inspection Activities - PWR 4

OL RQ

- LICENSED OPERATOR REQUAL INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111111B IP Licensed Operator Requalification Program 7

EB3SGRP

- STEAM GENERATOR REPLACEMENT Other Routine 10/29/2007 11/02/2007 2

50001 IP Steam Generator Replacement Inspection Other Routine 11/26/2007 11/30/2007 2

50001 IP Steam Generator Replacement Inspection Other Routine 12/17/2007 12/21/2007 2

50001 IP Steam Generator Replacement Inspection 2

EB3HEAD

- REACTOR HEAD REPLACEMENT Other Routine 11/05/2007 11/09/2007 2

71007 IP Reactor Vessel Head Replacement Inspection 2

PSB1-RP

- RP OCCUPATIONAL BASLINE INSP WK 1 Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/05/2007 11/09/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/05/2007 11/09/2007 1, 2 71151 IP Performance Indicator Verification 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WK 2 Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 11/26/2007 11/30/2007 1, 2 71151 IP Performance Indicator Verification 1

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-2)

Event Response Insp 12/16/2007 12/21/2007 2

93812 IP Special Inspection 2

PS2-EP

- EP EXERCISE Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 02/18/2008 02/22/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP01 IP Drill/Exercise Performance This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Saint Lucie Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2006 15:18:22 Report 22 2

PS2-EP

- EP EXERCISE Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/18/2008 02/22/2008 1, 2 71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.