North Anna Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/30/2006 12:39:01 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2 2515/169 IP Mitigating Systems Performance Index Verification 3
PS2-EP
- EP EXERCISE Baseline Inspections 12/04/2006 12/08/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 12/04/2006 12/08/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 12/04/2006 12/08/2006 1, 2 71151 IP Performance Indicator Verification 4
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 12/11/2006 12/15/2006 1, 2 7111121 IP Component Design Bases Inspection 6
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/08/2007 01/12/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 01/22/2007 01/26/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 02/05/2007 02/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1
EB3-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 03/26/2007 03/30/2007 2
7111108P IP Inservice Inspection Activities - PWR 2
EB3SGISI
- U2 STEAM GENERATOR ISI Baseline Inspections 04/02/2007 04/06/2007 2
7111108P IP Inservice Inspection Activities - PWR 1
EB1-SUMP
- PWR U2 CONTMT SUMP BLOCKAGE TI 2515/166 Safety Issues 04/08/2007 04/13/2007 2
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
1 PSB1-RP
- RP PUBLIC PRE-INSP VISIT/ISFSI Baseline Inspections 05/14/2007 05/16/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas 4
PSB1-RP
- RP PUBLIC BASELINE INSPECTION Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/11/2007 06/15/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 06/11/2007 06/15/2007 1, 2 71151 IP Performance Indicator Verification 4
- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 07/30/2007 08/03/2007 1, 2 71152B IP Identification and Resolution of Problems 1
60854
- ISFSI DRY RUN FOR NUHOMS SYSTEM Other Routine 07/02/2007 07/06/2007 1
60854 IP Preoperational Testing Of An ISFSI 1
60855.1
- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1
60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
PS2-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111402 IP Alert and Notification System Testing This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
North Anna Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/30/2006 12:39:01 Report 22 1
PS2-EP
- EP INSP Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/06/2007 08/10/2007 1, 2 71151 IP Performance Indicator Verification 1
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 09/17/2007 09/21/2007 1
7111108P IP Inservice Inspection Activities - PWR 1
EB3SGISI
- U1 STEAM GENERATOR ISI Baseline Inspections 09/24/2007 09/28/2007 1
7111108P IP Inservice Inspection Activities - PWR 1
EB1-SUMP
- PWR U1 CONTMT SUMP BLOCKAGE TI 2151/166 Safety Issues 09/30/2007 10/05/2007 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
- REQUAL INSPECTION Baseline Inspections 01/14/2008 01/18/2008 1, 2 7111111B IP Licensed Operator Requalification Program 3
PS2-EP
- EP EXERCISE Baseline Inspections 02/11/2008 02/15/2008 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 02/11/2008 02/15/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/11/2008 02/15/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 02/11/2008 02/15/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 02/11/2008 02/15/2008 1, 2 71151-EP03 IP Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.