Watts Bar Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/30/2006 12:36:21 Report 22 1
2515/169
- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1
2515/169 IP Mitigating Systems Performance Index Verification 1
PS2-EP
- EP INSP Baseline Inspections 09/04/2006 09/08/2006 1
7111402 IP Alert and Notification System Testing Baseline Inspections 09/04/2006 09/08/2006 1
7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 09/04/2006 09/08/2006 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 09/04/2006 09/09/2006 1
7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 09/04/2006 09/09/2006 1
71151 IP Performance Indicator Verification 3
OL EXAM
- INITIAL EXAM Not Applicable 09/05/2006 09/15/2006 1
V23241 WATTS BAR/SEPTEMBER 2006 EXAM AT POWER FACILITIES 1
EB3-SGRP
- SG REPLACEMENT Other Routine 09/08/2006 09/08/2006 1
50001 IP Steam Generator Replacement Inspection 1
RP BR6
- UNIT 2 SYSTEMS LAY-UP INSPECTION Other Routine 09/25/2006 09/29/2006 1
92050 IP Review Of Quality Assurance For Extended Construction Delays 1
EB3-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 10/02/2006 10/06/2006 1
7111108P IP Inservice Inspection Activities - PWR 3
EB3SGRP
- SG REPLACEMENT Other Routine 10/02/2006 10/06/2006 1
50001 IP Steam Generator Replacement Inspection 2
PSB1-RP
- RP BASELINE OCCUPATIONAL & S/G REPL-WK1 Other Routine 10/02/2006 10/06/2006 1
50001 IP Steam Generator Replacement Inspection Baseline Inspections 10/02/2006 10/06/2006 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/02/2006 10/06/2006 1
7112102 IP ALARA Planning and Controls Baseline Inspections 10/02/2006 10/06/2006 1
71151 IP Performance Indicator Verification 2
EB3-SGRP
- SG REPLACEMENT Other Routine 10/16/2006 10/20/2006 1
50001 IP Steam Generator Replacement Inspection 1
PSB1-RP
- RP BASELINE OCCUPATIONAL & S/G REPL WK2 Other Routine 10/16/2006 10/20/2006 1
50001 IP Steam Generator Replacement Inspection Baseline Inspections 10/16/2006 10/20/2006 1
7112101 IP Access Control to Radiologically Significant Areas 2
EB3-SGRP
- SG REPLACEMENT Other Routine 10/30/2006 11/03/2006 1
50001 IP Steam Generator Replacement Inspection 2
EB1-SUMP
- PWR CONTAINMENT SUMP BLOCKAGE TI (U-1)
Safety Issues 11/05/2006 11/11/2006 1
2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02]
5 EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 01/29/2007 02/02/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 02/12/2007 02/16/2007 1
7111121 IP Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Watts Bar Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/30/2006 12:36:21 Report 22 5
EB1-CDB
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 02/26/2007 03/02/2007 1
7111121 IP Component Design Bases Inspection Baseline Inspections 03/12/2007 03/16/2007 1
7111121 IP Component Design Bases Inspection 1
PSB1-RP
- RP PRE-INSPECTION VISIT Baseline Inspections 04/30/2007 05/04/2007 1
7112101 IP Access Control to Radiologically Significant Areas 5
TFP
- TFP INFO TRIP Baseline Inspections 05/08/2007 05/10/2007 1
7111105T IP Fire Protection [Triennial]
3 PSB1-RP
- RP OCCUPATIONAL BASELINE INSPECTION Baseline Inspections 05/21/2007 05/25/2007 1
7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 05/21/2007 05/25/2007 1
7112102 IP ALARA Planning and Controls Baseline Inspections 05/21/2007 05/25/2007 1
7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/21/2007 05/25/2007 1
71151 IP Performance Indicator Verification 5
TFP
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 05/28/2007 06/01/2007 1
7111105T IP Fire Protection [Triennial]
Baseline Inspections 06/11/2007 06/15/2007 1
7111105T IP Fire Protection [Triennial]
2 EB3-HS
- HEAT SINK Baseline Inspections 06/25/2007 06/29/2007 1
7111107B IP Heat Sink Performance 4
RPB6-PIR
- BIENNIAL PI&R INSPECTION Baseline Inspections 08/27/2007 08/31/2007 1
71152B IP Identification and Resolution of Problems Baseline Inspections 09/10/2007 09/14/2007 1
71152B IP Identification and Resolution of Problems 3
EB1-MODS
- MODIFICATIONS-10CFR50.59 Baseline Inspections 10/29/2007 11/02/2007 1
7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 10/29/2007 11/02/2007 1
7111117B IP Permanent Plant Modifications 2
PS2-EP
- EP EXERCISE Baseline Inspections 11/05/2007 11/09/2007 1
7111401 IP Exercise Evaluation Baseline Inspections 11/05/2007 11/09/2007 1
7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 11/05/2007 11/09/2007 1
71151 IP Performance Indicator Verification 1
EB3-MR
- MR EFFECTIVENESS Baseline Inspections 12/10/2007 12/14/2007 1
7111112B IP Maintenance Effectiveness 3
OL PREP
- INITIAL EXAM PREP Not Applicable 01/07/2008 01/11/2008 1
V23277 WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 2
OL EXAM
- INITIAL EXAM Not Applicable 01/28/2008 02/08/2008 1
V23277 WATTS BAR/JANUARY 2008 EXAM AT POWER FACILITIES 1
EB3-ISI
- UNIT 1 - ISI Baseline Inspections 02/18/2008 02/22/2008 1
7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Watts Bar Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/30/2006 12:36:21 Report 22 1
EB3RPV
- REACTOR HEAD PENETRATIONS TI150 Safety Issues 02/18/2008 02/22/2008 1
2515/150 IP Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC ORDER EA This report does not include INPO and OUTAGE activities.