Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/2008
ML062430221
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/2006
From: Widmann M
Reactor Projects Region 2 Branch 6
To: Singer K
Tennessee Valley Authority
Shared Package
ML062430213 List:
References
Download: ML062430221 (3)


Text

Page 1 of 3 Browns Ferry 08/31/2006 06:19:11 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 2515/169 - TI 2515/169 - MSPI VERIFICATION 1 1, 2, 3 IP 2515/169 Mitigating Systems Performance Index Verification 08/01/2006 12/31/2006 Safety Issues BUL 80-6 - ENGINEERING SAFETY RESET CONTROL 1 1 IP 37550 Engineering 08/28/2006 09/01/2006 Other Routine EB3-BF1 - INSTRUMENT LINE SUPPORTS 1 1 IP 37550 Engineering 08/28/2006 09/01/2006 Other Routine 1 IP 37550 Engineering 09/05/2006 09/08/2006 Other Routine EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 6 2, 3 IP 7111105T Fire Protection [Triennial] 08/28/2006 09/01/2006 Baseline Inspections 2, 3 IP 7111105T Fire Protection [Triennial] 09/11/2006 09/15/2006 Baseline Inspections EB3BF1 - TORUS INTEG, LRG BORE AND BU 79-02, 14 1 1 IP 37550 Engineering 08/28/2006 09/01/2006 Other Routine 1 IP 37550 Engineering 09/18/2006 09/22/2006 Other Routine EB1 BF1 - DRYWELL COATINGS 1 1 IP 37550 Engineering 09/18/2006 09/22/2006 Other Routine EB2 BF1 - CABLE INSTALLATION 1 1 IP 51053 Electrical Components And Systems - Work Observation 09/18/2006 09/22/2006 Other Routine EDSFI - EDSFI FOLLOW-UP 1 1 IP 37550 Engineering 09/18/2006 09/22/2006 Other Routine OL RQ - REQUAL INSPECTION 4 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 09/18/2006 09/22/2006 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION INSPECTION 6 1 IP 7111105T Fire Protection [Triennial] 09/25/2006 09/29/2006 Baseline Inspections EB3 BF1 - SMALL BORE AND INSTRUMENT TUBING 1 1 IP 37550 Engineering 10/02/2006 10/05/2006 Other Routine EB2 SBO - SBO FOR UNIT 1 1 1 IP 37550 Engineering 10/10/2006 10/13/2006 Other Routine EB2 BF1 - EQ, PIECE PARTS 1 1 IP 51053 Electrical Components And Systems - Work Observation 10/16/2006 10/20/2006 Other Routine EB1ELECT - CABLE AMPACITY 1 1 IP 37550 Engineering 10/23/2006 10/27/2006 Other Routine ENGR - GL 92-04, 93-03 AND 96-01 1 1 IP 37551 Onsite Engineering 10/23/2006 11/03/2006 Other Routine EB2 BF1 - CABLE INSTALLATION 1 1 IP 51053 Electrical Components And Systems - Work Observation 11/13/2006 11/17/2006 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 3 Browns Ferry 08/31/2006 06:19:11 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3 BF1 - LICENSE RENEWAL FOLLOWUP U1 1 1 IP 92701 Followup 12/03/2006 12/07/2006 Other Routine EB3MR - UNIT 1 MAINTENANCE RULE 1 1 IP 62706 Maintenance Rule 12/11/2006 12/15/2006 Other Routine DRP/BR6 - MC 2509 AND SPOC II 5 1 IP 37550 Engineering 12/11/2006 12/25/2006 Other Routine START-UP - START-UP TEST PROCEDURE REVIEW MC 72300 1 1 IP 71004 Power Uprate 01/08/2007 01/12/2007 Other Routine ORAT - UNIT 1 ORAT 5 1 IP 93806 Operational Readiness Assessment Team 01/15/2007 01/19/2007 Other Routine INSP - MC 2509 / MC 0350/ SPOC II CLOSE OUT 4 1 IP 37551 Onsite Engineering 01/21/2007 01/25/2007 Core PSB1-RP - RP OCCUPATIONAL PRE-INSP VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/05/2007 02/07/2007 Baseline Inspections EB3-MR - MR EFFECTIVENESS 1 1, 2, 3 IP 7111112B Maintenance Effectiveness 02/05/2007 02/09/2007 Baseline Inspections START-UP - MC 72502, 72302, 72400, 72526, 72518, 4 1 IP 71004 Power Uprate 02/05/2007 03/30/2007 Other Routine PSB1-RP - RP OCCUPATIONAL BASELINE INSP WEEK 1 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 02/26/2007 03/02/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 02/26/2007 03/02/2007 Baseline Inspections EB3-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108G Inservice Inspection Activities - BWR 03/05/2007 03/09/2007 Baseline Inspections PSB1-RP - RP OCCUPATIONAL BASELINE INSP WEEK 2 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 03/19/2007 03/23/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 03/19/2007 03/23/2007 Baseline Inspections EPU - POWER UPRATE MC 71004 2 1 IP 71004 Power Uprate 03/19/2007 03/23/2007 Other Routine 1 IP 71004 Power Uprate 04/02/2007 04/06/2007 Other Routine START-UP - START-UP TEST RESULTS EVALUATION MC72301 2 1 IP 71004 Power Uprate 04/16/2007 04/20/2007 Other Routine This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Browns Ferry 08/31/2006 06:19:11 Inspection / Activity Plan Report 22 09/01/2006 - 03/31/2008 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type LTT - LARGE TRANSIENT TESTING MC 72514, 72510 5 1 IP 71004 Power Uprate 04/23/2007 04/28/2007 Other Routine 60855.1 - OPERATIONAL ISFSI INSPECTION BY RESIDENT 1 1 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 07/09/2007 07/13/2007 Other Routine PS2-EP - EP EXERCISE 2 1, 2, 3 IP 7111401 Exercise Evaluation 07/23/2007 07/27/2007 Baseline Inspections 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/23/2007 07/27/2007 Baseline Inspections 1, 2, 3 IP 71151 Performance Indicator Verification 07/23/2007 07/27/2007 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2, 3 IP 71152B Identification and Resolution of Problems 08/06/2007 08/10/2007 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 08/20/2007 08/24/2007 Baseline Inspections OL PREP - INITIAL EXAM PREP 5 1 V23268 BROWNS FERRY/SEPTEMBER 2007 EXAM AT POWER FACILITIES 08/06/2007 08/10/2007 Not Applicable OL EXAM - INITIAL EXAM 5 1 V23268 BROWNS FERRY/SEPTEMBER 2007 EXAM AT POWER FACILITIES 08/27/2007 08/31/2007 Not Applicable CDBI - COMPONENT DESIGN BASES INSPECTION 9 1, 2, 3 IP 7111121 Component Design Bases Inspection 10/29/2007 11/02/2007 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 11/12/2007 11/16/2007 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 11/26/2007 11/30/2007 Baseline Inspections 1, 2, 3 IP 7111121 Component Design Bases Inspection 12/10/2007 12/14/2007 Baseline Inspections EB3HS - HEAT SINK 1 1, 2, 3 IP 7111107B Heat Sink Performance 01/28/2008 02/01/2008 Baseline Inspections OL PREP - INITIAL EXAM PREP 3 1 V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 01/28/2008 02/01/2008 Not Applicable OL EXAM - INITIAL EXAM 3 1 V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 02/25/2008 03/07/2008 Not Applicable EB3-ISI - UNIT 3 - ISI 1 3 IP 7111108G Inservice Inspection Activities - BWR 03/10/2008 03/14/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.