ML062430221

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review and Inspection Plan, 09/01/06 - 03/31/2008
ML062430221
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/2006
From: Widmann M
Reactor Projects Region 2 Branch 6
To: Singer K
Tennessee Valley Authority
Shared Package
ML062430213 List:
References
Download: ML062430221 (3)


Text

Browns Ferry Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 3 08/31/2006 06:19:11 Report 22 1

2515/169

- TI 2515/169 - MSPI VERIFICATION Safety Issues 08/01/2006 12/31/2006 1, 2, 3 2515/169 IP Mitigating Systems Performance Index Verification 1

BUL 80-6

- ENGINEERING SAFETY RESET CONTROL Other Routine 08/28/2006 09/01/2006 1

37550 IP Engineering 1

EB3-BF1

- INSTRUMENT LINE SUPPORTS Other Routine 08/28/2006 09/01/2006 1

37550 IP Engineering Other Routine 09/05/2006 09/08/2006 1

37550 IP Engineering 6

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 08/28/2006 09/01/2006 2, 3 7111105T IP Fire Protection [Triennial]

Baseline Inspections 09/11/2006 09/15/2006 2, 3 7111105T IP Fire Protection [Triennial]

1 EB3BF1

- TORUS INTEG, LRG BORE AND BU 79-02, 14 Other Routine 08/28/2006 09/01/2006 1

37550 IP Engineering Other Routine 09/18/2006 09/22/2006 1

37550 IP Engineering 1

EB1 BF1

- DRYWELL COATINGS Other Routine 09/18/2006 09/22/2006 1

37550 IP Engineering 1

EB2 BF1

- CABLE INSTALLATION Other Routine 09/18/2006 09/22/2006 1

51053 IP Electrical Components And Systems - Work Observation 1

EDSFI

- EDSFI FOLLOW-UP Other Routine 09/18/2006 09/22/2006 1

37550 IP Engineering 4

OL RQ

- REQUAL INSPECTION Baseline Inspections 09/18/2006 09/22/2006 1, 2, 3 7111111B IP Licensed Operator Requalification Program 6

EB2-TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 09/25/2006 09/29/2006 1

7111105T IP Fire Protection [Triennial]

1 EB3 BF1

- SMALL BORE AND INSTRUMENT TUBING Other Routine 10/02/2006 10/05/2006 1

37550 IP Engineering 1

EB2 SBO

- SBO FOR UNIT 1 Other Routine 10/10/2006 10/13/2006 1

37550 IP Engineering 1

EB2 BF1

- EQ, PIECE PARTS Other Routine 10/16/2006 10/20/2006 1

51053 IP Electrical Components And Systems - Work Observation 1

EB1ELECT

- CABLE AMPACITY Other Routine 10/23/2006 10/27/2006 1

37550 IP Engineering 1

ENGR

- GL 92-04, 93-03 AND 96-01 Other Routine 10/23/2006 11/03/2006 1

37551 IP Onsite Engineering 1

EB2 BF1

- CABLE INSTALLATION Other Routine 11/13/2006 11/17/2006 1

51053 IP Electrical Components And Systems - Work Observation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Browns Ferry Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 3 08/31/2006 06:19:11 Report 22 1

EB3 BF1

- LICENSE RENEWAL FOLLOWUP U1 Other Routine 12/03/2006 12/07/2006 1

92701 IP Followup 1

EB3MR

- UNIT 1 MAINTENANCE RULE Other Routine 12/11/2006 12/15/2006 1

62706 IP Maintenance Rule 5

DRP/BR6

- MC 2509 AND SPOC II Other Routine 12/11/2006 12/25/2006 1

37550 IP Engineering 1

START-UP

- START-UP TEST PROCEDURE REVIEW MC 72300 Other Routine 01/08/2007 01/12/2007 1

71004 IP Power Uprate 5

ORAT

- UNIT 1 ORAT Other Routine 01/15/2007 01/19/2007 1

93806 IP Operational Readiness Assessment Team 4

INSP

- MC 2509 / MC 0350/ SPOC II CLOSE OUT Core 01/21/2007 01/25/2007 1

37551 IP Onsite Engineering 1

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 02/05/2007 02/07/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas 1

EB3-MR

- MR EFFECTIVENESS Baseline Inspections 02/05/2007 02/09/2007 1, 2, 3 7111112B IP Maintenance Effectiveness 4

START-UP

- MC 72502, 72302, 72400, 72526, 72518, Other Routine 02/05/2007 03/30/2007 1

71004 IP Power Uprate 2

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WEEK 1 Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 02/26/2007 03/02/2007 1, 2, 3 71151 IP Performance Indicator Verification 1

EB3-ISI

- U2 INSERVICE INSPECTION Baseline Inspections 03/05/2007 03/09/2007 2

7111108G IP Inservice Inspection Activities - BWR 3

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP WEEK 2 Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112102 IP ALARA Planning and Controls Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 03/19/2007 03/23/2007 1, 2, 3 71151 IP Performance Indicator Verification 2

EPU

- POWER UPRATE MC 71004 Other Routine 03/19/2007 03/23/2007 1

71004 IP Power Uprate Other Routine 04/02/2007 04/06/2007 1

71004 IP Power Uprate 2

START-UP

- START-UP TEST RESULTS EVALUATION MC72301 Other Routine 04/16/2007 04/20/2007 1

71004 IP Power Uprate This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Browns Ferry Inspection / Activity Plan 09/01/2006 - 03/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 3 of 3 08/31/2006 06:19:11 Report 22 5

LTT

- LARGE TRANSIENT TESTING MC 72514, 72510 Other Routine 04/23/2007 04/28/2007 1

71004 IP Power Uprate 1

60855.1

- OPERATIONAL ISFSI INSPECTION BY RESIDENT Other Routine 07/09/2007 07/13/2007 1

60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 2

PS2-EP

- EP EXERCISE Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 7111401 IP Exercise Evaluation Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/23/2007 07/27/2007 1, 2, 3 71151 IP Performance Indicator Verification 5

PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION Baseline Inspections 08/06/2007 08/10/2007 1, 2, 3 71152B IP Identification and Resolution of Problems Baseline Inspections 08/20/2007 08/24/2007 1, 2, 3 71152B IP Identification and Resolution of Problems 5

OL PREP

- INITIAL EXAM PREP Not Applicable 08/06/2007 08/10/2007 1

V23268 BROWNS FERRY/SEPTEMBER 2007 EXAM AT POWER FACILITIES 5

OL EXAM

- INITIAL EXAM Not Applicable 08/27/2007 08/31/2007 1

V23268 BROWNS FERRY/SEPTEMBER 2007 EXAM AT POWER FACILITIES 9

CDBI

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 10/29/2007 11/02/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/12/2007 11/16/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 11/26/2007 11/30/2007 1, 2, 3 7111121 IP Component Design Bases Inspection Baseline Inspections 12/10/2007 12/14/2007 1, 2, 3 7111121 IP Component Design Bases Inspection 1

EB3HS

- HEAT SINK Baseline Inspections 01/28/2008 02/01/2008 1, 2, 3 7111107B IP Heat Sink Performance 3

OL PREP

- INITIAL EXAM PREP Not Applicable 01/28/2008 02/01/2008 1

V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 3

OL EXAM

- INITIAL EXAM Not Applicable 02/25/2008 03/07/2008 1

V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 1

EB3-ISI

- UNIT 3 - ISI Baseline Inspections 03/10/2008 03/14/2008 3

7111108G IP Inservice Inspection Activities - BWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.