Category:Letter
MONTHYEARML24262A2212024-09-13013 September 2024 2023-2024 Annual Report for the University of Wisconsin Nuclear Reactor Laboratory ML24052A0452024-06-25025 June 2024 Examination Report Letter No. 50-156/OL-24-01, University of Wisconsin ML24052A0462024-06-25025 June 2024 Examination Result Letter No. 50-156/OL-24-01, University of Wisconsin IR 05000156/20242012024-05-30030 May 2024 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2024201 ML24109A0632024-04-22022 April 2024 University of Wisconsin - Change of Facility Backup Project Manager ML24099A0562024-03-27027 March 2024 University of Wisconsin-Madison - 10 CFR 50.74; Notification of Change in Operator or Senior Operator Status ML24037A2162024-02-13013 February 2024 Examination Confirmation Letter No. 50-156/OL-24-01, University of Wisconsin IR 05000156/20232012023-08-0101 August 2023 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2023201 - Cover Letter and Enclosure IR 05000156/20222022022-12-28028 December 2022 University of Wisconsin - U. S. Nuclear Regulatory Commission Security Inspection Report No. 05000156-2022202 Cover Letter ML22340A0052022-11-30030 November 2022 Univ of Wisconsin - Madison, Submittal of 2021 - 2022 Annual Report ML22292A2982022-11-28028 November 2022 University of Wisconsin Research Reactor, Closure of Confirmatory Action Letter No. NRR-03-002 on the Site-Specific Compensatory Measures Implementation Plan ML22224A0852022-08-0808 August 2022 University of Wisconsin - Madison, Physical Security Protection Plan Cover Page & CAL No. NRR-03-002; Confirmatory Action Letter - Site Specific Compensatory Measures Implementation Plan, Request to Change Commitment ML22200A0422022-07-13013 July 2022 University of Wisconsin-Madison - Change to Physical Security Protection Plan in Accordance with 10 CFR 50.54(p) (2) IR 05000156/20222012022-06-0101 June 2022 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 05000156/2022201 ML22138A1872022-05-12012 May 2022 Univ. of Wisconsin - Madison, Technical Specification 6. 7. 2 (2) (a) Change in Operating Organization ML22062A7662022-04-20020 April 2022 The University of Wisconsin - Issuance of Amendment No. 18 to Facility License No. R-74 to Revise the Organizational Structure in the Technical Specifications for the University of Wisconsin Nuclear Reactor ML22046A0592022-02-24024 February 2022 Examination Confirmation Letter No. 50-156/OL-22-01, University of Wisconsin- Madison ML21253A2452021-09-23023 September 2021 University of Wisconsin - Change of Facility Project Manager ML21251A4862021-09-0202 September 2021 Univ. of Wisconsin, Madison - Annual Operating Report Fiscal Year 2020-2021 IR 05000156/20212012021-06-0303 June 2021 Univesity of Wisconsin - U.S. NRC Routine Inspection Report 05000156/2021201 ML21103A2532021-04-13013 April 2021 Examination Confirmation Letter No.50-156/OL-21-01, University of Wisconsin - Madison IR 05000156/20202022020-11-16016 November 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2020202 ML20295A4242020-11-16016 November 2020 Notification of Mailing Address Change Regarding Submittal of Fingerprint Cards ML20276A1192020-09-25025 September 2020 Univ. of Wisconsin, Madison - Transmittal of 2019-2020 Annual Report ML20253A3162020-09-22022 September 2020 Examination Report No. 50-156/OL-20-01, University of Wisconsin-Madison ML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications IR 05000156/20202012020-05-20020 May 2020 University of Wisconsin - U.S. Nuclear Regulatory Commission Security Inspection Report No. 050000156/2020-201 - Non-OUOSRI (Cover Ltr) ML19351C7472019-12-0606 December 2019 Univ. of Wisconsin - Madison - Transmittal of 2018-2019 Annual Report ML19190A0912019-07-0202 July 2019 University of Wisconsin-Madison - Technical Specification 6.7.2 (2)(a): Change in Operating Organization IR 05000156/20192012019-04-24024 April 2019 University of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report No. 50-156/2019-201 ML18365A3502019-01-0808 January 2019 University of Wisconsin - Change of Facility Project Manager ML18200A0652018-07-16016 July 2018 Transmittal of 2017-2018 Annual Report for the University of Wisconsin Nuclear Reactor Laboratory ML18179A1692018-06-25025 June 2018 University of Wisconsin-Madison - 10 CFR 50.74, Notification of Change in Operator or Senior Operator Status ML18178A3882018-06-22022 June 2018 Examination Report No. 50-156/OL-18-01, University of Wisconsin-Madison ML18086B3102018-03-27027 March 2018 Examination Confirmation Letter 50-156/OL-8-01, Wisconsin ML17202D0782017-07-17017 July 2017 University of Wisconsin Nuclear Reactor Laboratory: 2016-2017 Annual Report IR 05000156/20172012017-06-0505 June 2017 University of Wisconsin - Nuclear Regulatory Commission Routine Inspection Report 05000156/2017201 ML17104A0982017-04-19019 April 2017 Non-Power Reactor Closeout of Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools University of Wisconsin Docket No. 50-156 (CAC No. A11010) ML16286A2352016-10-0505 October 2016 Univ. of Wisconsin - Madison, Response to NRC Generic Letter 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML16209A4732016-08-11011 August 2016 University Of Wisconsin - U.S. Nuclear Regulatory Commission Routine Inspection Report 05000156/2016202 ML16217A4602016-07-29029 July 2016 University of Wisconsin, Submittal of Annual Operating Report 2015-2016 Fiscal Year ML16138A3072016-05-23023 May 2016 IR 05000156/2016-201 - May 2-5, 2016 - University Of Wisconsin - Nuclear Regulatory Commission Security Inspection Report ML16096A1552016-04-0707 April 2016 Examination Notification Letter No. 50-156/OL-16-01,University of Wisconsin ML15218A0302015-07-31031 July 2015 University of Wisconsin, Madison - Transmittal of the 2014-2015 Annual Operating Report IR 05000156/20152012015-06-24024 June 2015 IR 05000156/2015201 - 06/08/15 - 06/11/15, University of Wisconsin- NRC Routine Inspection ML14290A4862015-06-0303 June 2015 Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures ML15055A5962015-02-20020 February 2015 Technical Specification 6.7.2(2)(a), Change in Operating Organization ML14204A0752014-07-18018 July 2014 Transmittal of 2013-2014 Annual Report for University of Wisconsin Nuclear Reactor Laboratory IR 05000156/20142012014-06-19019 June 2014 IR 05000156-14-201 on May 19-22, 2014, at the University of Wisconsin - NRC Routine Inspection Report No. 50-156/2014-201 ML14139A5592014-05-27027 May 2014 University of Wisconsin - Change of Facility Project Manager 2024-09-13
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications ML0624002912006-08-23023 August 2006 University of Wisconsin Triga Research Reactor Requests to Amend Technical Specifications to Facility License No. R-74 2020-07-10
[Table view] Category:Technical Specification
MONTHYEARML22062A7662022-04-20020 April 2022 The University of Wisconsin - Issuance of Amendment No. 18 to Facility License No. R-74 to Revise the Organizational Structure in the Technical Specifications for the University of Wisconsin Nuclear Reactor ML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications ML0624002912006-08-23023 August 2006 University of Wisconsin Triga Research Reactor Requests to Amend Technical Specifications to Facility License No. R-74 ML14204A6141974-02-0404 February 1974 TSAF50-00156 - University of Wisconsin, Current Facility Operating License R-074, Tech Specs, Revised 08/20/2014 2022-04-20
[Table view] Category:Amendment
MONTHYEARML22062A7662022-04-20020 April 2022 The University of Wisconsin - Issuance of Amendment No. 18 to Facility License No. R-74 to Revise the Organizational Structure in the Technical Specifications for the University of Wisconsin Nuclear Reactor ML20192A1112020-07-10010 July 2020 Univ of Wisconsin-Madison - License Amendment Request Regarding Administrative Controls Proposed Changes to Technical Specifications ML0624002912006-08-23023 August 2006 University of Wisconsin Triga Research Reactor Requests to Amend Technical Specifications to Facility License No. R-74 ML14204A6141974-02-0404 February 1974 TSAF50-00156 - University of Wisconsin, Current Facility Operating License R-074, Tech Specs, Revised 08/20/2014 2022-04-20
[Table view] |
Text
INuclear Reactor Laboratory (University of Wisconsin-Madison 1513 University Avenue, Room 101 ME, Madison, WI 53706-1687, Tel: (608) 262-3392, FAX: (608) 262-8590 email: reactor@engr.wisc.edu, http://reactor.engr.wisc.edu August 23, 2006 RSC 901 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Docket 50-156, License R-74 Request for Amendment No. 16 to Facility License No. R-74
Dear Sirs:
The University of Wisconsin TRIGA research reactor requests to amend the Technical Specifications to facility license no. R-74.
Specifically, Technical Specification 4.2.1.a, which states:
"The reactivity worth of the control elements and the shutdown margin shall be determined annually but at intervals not to exceed 14 months" The proposed change to Technical Specification 4.2.1.a is to replace the time interval from 14 months to 15 months, to read as follows:
"The reactivity worth of the control elements and the shutdown margin shall be determined annually but at intervals not to exceed 15 months" Basis for Proposed Change The University of Wisconsin TRIGA research reactor facility is involved in two major construction projects during the current calendar year. These construction projects include modifications to the external Mechanical Engineering Building on the University of Wisconsin campus, in which the reactor is located, and a complete overhaul of the reactor control console.
Page 1 of 3 -A (2 Q
I i These projects were scheduled to be performed concurrently, with the reactor control console upgrade commencing two weeks after the beginning of the external facility modifications. The external facility modifications were to commence on May 15, 2006.
The reason for this was to ensure the new equipment to be installed in the reactor control console would not be damaged by dust and vibration during the demolition phase of the external facility modifications.
Due to construction delays during the demolition phase of the external facility modifications, the reactor control console upgrade project did not commence until July 10, 2006. As a result, the reactor has been shutdown since May 15, 2006 and upon current evaluation, reactor operation is unlikely to resume until September 15, 2006.
Surveillance requirement 4.2.1.a was last performed on June 30, 2005 and is due for completion prior to August 31, 2006.
The proposed amendment provides a one month deferral of requirement 4.2.1.a during this time that the reactor is shut down. Surveillance requirement 4.2.1.a must still be completed as soon as practical after reactor startup and no later than September 30, 2006.
Safety Evaluation by Facility The American National Standard ANSI/ANS-15.1-1990 recognizes the measurement of reactivity worth of control rods shall be performed annually or following significant core or control rod changes. The definition of annually is the interval not to exceed 15 months.
The basis for this requirement, as explained in Technical Specification 4.2.1, is "Past experience with TRIGA reactors gives assurance that measurement of the reactivity worth on an annual basis is adequate to assure no significant changes in the shutdown margin".
There have been no changes to the reactor core or control rods during the interval of June 30, 2005 to present. The reactor will continue to remain shutdown until initial startup following the reactor control console upgrade. At which time surveillance requirement 4.2.1.a will be completed as soon as practical.
Page 2 of 3
I believe this proposed change does not have any safety significance since it only affect the time interval for the performance of surveillance requirement 4.2.1.a by one month, which is consist with the American National Standard ANSI/ANS-15.1-1990.
I certify under penalty of perjury that the foregoing is true and correct.
,-;: iExecuted nhirrý-.7A on:?
Reactor Director Page 3 of 3