RAI - Request for Additional Information Related to Relief Request to Use an Alternative Brazed Joint Methodology
ML062300005
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/23/2006
From: Nerses V
NRC/NRR/ADRO/DORL/LPLI-2
To: Grecheck E
Dominion Nuclear Connecticut
Nerses V, NRR//DLPM, 415-1484
References
TAC MC8893
Download: ML062300005 (3)


Text

August 23, 2006 Mr. Eugene S. Grecheck Vice President - Nuclear Support Services Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT NO. 3 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST TO USE AN ALTERNATIVE BRAZED JOINT METHODOLOGY (TAC NO. MC8893)

Dear Mr. Grecheck:

By letter dated June 9, 2005, Dominion Nuclear Connecticut, Inc. requested approval for the use of an alternative brazed joint assessment methodology. The approval of the request would provide the structural integrity analysis and acceptance criteria needed for resolution of nonconforming conditions on American Society of Mechanical Engineers Boiler and Pressure Vessel Code Class 3, moderate energy system piping with brazed joints as part of the Millstone Power Station, Unit No. 3, inservice inspection program.

The Nuclear Regulatory Commission staff has determined that a response to the request for additional information is necessary in order for the staff to complete its review. These questions, in draft form, were sent by fax to Mr. Paul Willoughby of your staff on March 24, 2006. A conference call with your staff was held to discuss the questions on May 11, 2006, in which a common understanding of the questions was reached.

In order to complete our timely review of your relief request, we require your response within 30 days from the date of this letter. Please note that if you do not respond to this letter within 30 days, we may reject your application under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108(b). If you have any questions, I can be reached at (301) 415-1484.

Sincerely,

/RA by G. Ed Miller for/

Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc w/encl: See next page

August 23, 2006 Mr. Eugene S. Grecheck Vice President - Nuclear Support Services Dominion Nuclear Connecticut, Inc.

Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711

SUBJECT:

MILLSTONE POWER STATION, UNIT NO. 3 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO RELIEF REQUEST TO USE AN ALTERNATIVE BRAZED JOINT METHODOLOGY (TAC NO. MC8893)

Dear Mr. Grecheck:

By letter dated June 9, 2005, Dominion Nuclear Connecticut, Inc. requested approval for the use of an alternative brazed joint assessment methodology. The approval of the request would provide the structural integrity analysis and acceptance criteria needed for resolution of nonconforming conditions on American Society of Mechanical Engineers Boiler and Pressure Vessel Code Class 3, moderate energy system piping with brazed joints as part of the Millstone Power Station, Unit No. 3, inservice inspection program.

The Nuclear Regulatory Commission staff has determined that a response to the request for additional information is necessary in order for the staff to complete its review. These questions, in draft form, were sent by fax to Mr. Paul Willoughby of your staff on March 24, 2006. A conference call with your staff was held to discuss the questions on May 11, 2006, in which a common understanding of the questions was reached.

In order to complete our timely review of your relief request, we require your response within 30 days from the date of this letter. Please note that if you do not respond to this letter within 30 days, we may reject your application under the provisions of Title 10 of the Code of Federal Regulations, Section 2.108(b). If you have any questions, I can be reached at (301) 415-1484.

Sincerely,

/RA by G. Ed Miller for/

Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-423 cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL1-2 R/F RidsNrrDorlLpl1-2 RidsNrrLACRaynor RidsNrrDlpmDpr RidsNrrPMVNerses RidsOgcRp RidsAcrsAcnwMailCenter RidsRgnIMailCenter RidsNrrDeEeeb ADAMS Accession Number: ML062300005 OFFICE LPL1-2/PM LPL1-2/LA LPL1-2/BC (A)

NAME VNerses:rsa (GMiller for)

CRaynor BPoole DATE 8/23/06 8/23/06 8/23/06 OFFICIAL RECORD COPY

Millstone Power Station, Unit No. 3 cc:

Lillilan M. Cuoco, Esquire Senior Counsel Dominion Resources Services, Inc.

Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 Edward L. Wilds, Jr., Ph.D.

Director, Division of Radiation Department of Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 First Selectmen Town of Waterford 15 Rope Ferry Road Waterford, CT 06385 Mr. J. W. "Bill" Sheehan Co-Chair NEAC 19 Laurel Crest Drive Waterford, CT 06385 Mr. Evan W. Woollacott Co-Chair Nuclear Energy Advisory Council 128 Terry's Plain Road Simsbury, CT 06070 Senior Resident Inspector Millstone Power Station c/o U.S. Nuclear Regulatory Commission P. O. Box 513 Niantic, CT 06357 Ms. Nancy Burton 147 Cross Highway Redding Ridge, CT 00870 Mr. Joseph Roy, Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street P.O. Box 426 Ludlow, MA 01056 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.

Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 Mr. Chris Funderburk Director, Nuclear Licensing and Operations Support Dominion Resources Services, Inc.

5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. David W. Dodson Licensing Supervisor Dominion Nuclear Connecticut, Inc.

Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385