ML062220592
| ML062220592 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/14/2006 |
| From: | Brian Benney NRC/NRR/ADRO/DORL/LPLIV |
| To: | Edington R Nebraska Public Power District (NPPD) |
| Benney B, NRR/DORL, 415-3764 | |
| References | |
| TAC MD0283 | |
| Download: ML062220592 (4) | |
Text
August 14, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: RISK-INFORMED INSERVICE INSPECTION RELIEF REQUEST FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. RI-34 (TAC NO. MD0283)
Dear Mr. Edington:
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in the February 23, 2006, submittal and has determined that the additional information identified in this enclosure is required in order for the NRC staff to complete its review. To meet our target date, the NRC staff requests that the licensee provide its response no later than August 25, 2006.
Sincerely,
/RA by MFields for/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
Request for Additional Information cc w/encl: See next page
August 14, 2006 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321
SUBJECT:
COOPER NUCLEAR STATION - REQUEST FOR ADDITIONAL INFORMATION RE: RISK-INFORMED INSERVICE INSPECTION RELIEF REQUEST FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. RI-34 (TAC NO. MD0283)
Dear Mr. Edington:
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the information provided in the February 23, 2006, submittal and has determined that the additional information identified in this enclosure is required in order for the NRC staff to complete its review. To meet our target date, the NRC staff requests that the licensee provide its response no later than August 25, 2006.
Sincerely,
/RA by MFields for/
Brian Benney, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC RidsNrrDorl (CHaney/CHolden)
LPLIV r/f RidsRgn4MailCenter (KKennedy)
RidsNrrLALFeizollahi RidsNrrDorlDpr RidsNrrPMBBenney RidsOgcRp RidsNrrDorlLpl4 (DTerao)
RidsNrrDraAplb (LMrowca)
RidsAcrsAcnwMailCenter ADAMS ACCESSION NO: ML062220592 NRR-088 OFFICE LPL4/PM LPL4/LA LPL4/BC NAME BBenney MFields for LFeizollahi DTerao DATE 08/11806 08/11/06 08/14/06 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RISK-INFORMED INSERVICE INSPECTION RELIEF REQUEST FOURTH 10-YEAR INSERVICE INSPECTION PROGRAM RELIEF REQUEST NO. RI-34 FACILITY OPERATING LICENSE NO. DPR-46 NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298 1.
Based on a composite of the tables provided in the enclosure to letter No. NLS2006015, it appears that the fourth interval and third interval risk-informed inservice inspection (RI-ISI) programs are nearly identical. However, there are two aspects of the fourth interval program that the Nuclear Regulatory Commission staff is unable to discern from what was provided:
a.
Have there been any changes to the 61 locations selected for nondestructive examination for the fourth interval, relative to the 61 locations selected during the original (third interval relief request) RI-ISI program evaluation (within a given system and risk category)? If so, please identify them and give the rationale for those changes.
b.
Are there any significant issues or changes to the Cooper probabilistic safety assessment (PSA) model that was used to support your RI-ISI renewal request?
If so, please summarize your assessment of the impact of resolving these issues on the RI-ISI application for the fourth ISI interval. If changes have been made to the PSA model, provide a summary of the changes that will have an affect on the RI-ISI application for the fourth ISI interval.
February 2006 Cooper Nuclear Station cc:
Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Gene Mace Nuclear Asset Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P. O. Box 176 Jefferson City, MO 65102-0176 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Director, Missouri State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65102-0116 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319 Mr. Keith G. Henke, Planner Division of Community and Public Health Office of Emergency Coordination 930 Wildwood P.O. Box 570 Jefferson City, MO 65102 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. John F. McCann, Director Licensing, Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601-1813