-4
.. =
From:
A. Randolph Blough To:;
"Dave Lochbaum",<dlochbaum@ucsusa.org>E Date:
10/27/04 4:53PM
Subject:
Letter to PSEG P~n~iI
-.- ~-..
IL-NRC Region I has issued a letter acknowledging PSEG's commitment letter of 10/17 regarding Hope Creek. Since our ADAMS external service is down, I am sending you a courtesy copy for your info.
Randy Blough Information in this record was deleted in accordanca vtih the Freedom of lnforwftio, Act, exemptions 2*-
FOIA-6~-?Z
- ,*v t~~~l*Vi4 4-
_~ iI~
t:
- J t*i
.r
= v
- .'.')**:'!*..';",
I',,
- t. 0 V H: o L
- p"ction.
.:;.,-+,*..,,-,*..:.,,*.,;,.
- 1. w*
p.,dr*
- ..*.,*...i*.t:.:.,
October 21, 2004 Mr. A. Christopher Bakken President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P. O. Box 236 Hancocks Bridge, NJ 08038
SUBJECT:
Response to October 10, 2004 Event at Hope Creek Generating Station
Dear Mr. Bakken:
Thank you for your letter dated October 17, 2004, informing the Nuclear Regulatory Commission (NRC) of PSEG's planned actions in response to the steam leak and forced reactor shutdown that occurred at Hope Creek on October 10, 2004. The purpose of this letter is to acknowledge PSEG's planned actions and to inform you of NRC's plans for review of the event and your response.
NRC completed an initial risk assessment and, in accordance with our procedure for responding to events, initiated a special inspection to evaluate the circumstances of the event that occurred at Hope Creek on October 10, 2004. The event involved a forced shutdown of the reactor following a steam leak in the turbine building. The leak was subsequently determined to be due to failure of an 8-inch drain line between a moisture separator and the main condenser.
NRC's special inspection is evaluating PSEG's analysis of the cause(s) of the steam system piping failure, extent of condition and actions to prevent recurrence. We also plan to independently evaluate the equipment and human performance issues that complicated the response to this event. We understand that prior to restart, you plan to complete a root cause analysis and that your review will address both the equipment issues surrounding the event and the adequacy of operator response to the event. The NRC special inspection team was onsite the weeks of October 11 and October 18, 2004, conducting initial fact finding and personnel interviews. We plan to complete our inspection after you have conducted your review and identified corrective actions.
Due to the heightened stakeholder interest in the event and consistent with the NRC's openness strategic goal, we intend to publish the preliminary results of the special inspection and conduct a public meeting to review your actions and NRC findings prior to restart of the Hope Creek reactor.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qovlreading-rmladams.html (the Public Electronic Reading Room).
- [FDaVid,Vitd6 -.Uope
- Cre~ek Special Inspectioh, Im.wd
- f I
- .=. * -'J P*a*
- il Pzine 9 1 I* r l l m
i*o l,
- o Mr. A. Christopher Bakken 2
If you have any questions regarding NRC's special inspection. please contact Eugene Cobey of my staff at (610) 337-5171.
Sincerely, IRAI Samuel J. Collins Regional Administrator Docket No.
License No.
50-354 NPF-57
David Creek S cial Ins ection I.wpd
. 1.:..
Page 3
~.1.*~-
7 Mr. A. Christopher Bakken 3
cc:
M. Brothers, Vice President - Site Operations J. T. Carlin, Vice President - Nuclear Assessment M. Gallagher, Vice President - Engineering and Technical Support W. F. Sperry, Director - Business Support C. Perino, Director - Nuclear Safety and Licensing J. A. Hutton, Hope Creek Plant Manager R. Kankus, Joint Owner Affairs J. J. Keenan, Esquire M. Wetterhahn, Esquire Consumer Advocate, Office of Consumer Advocate F. Pompper, Chief of Police and Emergency Management Coordinator J. Upoti Ph.D., Assistant Director of Radiation Programs. State of New Jersey H. Otto, Ph.D., DNREC Division of Water Resources, State of Delaware N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance o
.,4
Ijavid Vito --,Hope CUreek S~cal~t~n.p
.1 3/4Pae
.. T::. M.:
P
-41 aae*
H
- ...0.*..:.
Mr. A. Christopher Bakken Distribution:
S. Collins, RA J. Wiggins. DRA A. Blough, DRP B. Holian, DRP E. Cobey, DRP S. Barber, DRP M. Gray - DRP, Senior Resident Inspector K. Venuto, DRP, Resident OA J. Jolicoeur, RI OEDO R. Laufer, NRR D. Collins, PM. NRR R. Ennis, (Backup) PM, NRR T. Kim. Director, DOC Region I Docket Room (with concurrences) 4 DOCUMENT NAME: G:\\DRP\\BRANCH3\\Hope CreekXHope Creek.Special Inspeotion.wpd After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, Indicate In the box: "C" = Copy without attachmentlenclosure "E" = Copy with attachmentlenclosure "N' = No copy OFFICE RI/DRP I
RIIDRP RIIDRP RIIORA NAME TWaIker1TEW ECobeyIGSB for BHolianIBEH SCollinsISJC DATE 10121/04 10/21104 10121104 10121/04 OFFICIAL RECORD COPY