Kenneth Jenison notes/comments on the nterview (02-05-04)
The following are my observations/questions of th y
terview 02-05-04.
Will raise concerns and has done so before?
YES None Raises concerns for others?
YES None Believes others raise concerns without hesitation?
YES Some equipment operators may hesitate to bring up issues because them may think unobody cares' or a have a general feeling of frustration (pp 15-16, 53).
Knows of someone who has experienced retaliation for NO None raising concerns?
Bins for Issues:
- 1 - PERCEIVED LACK OF FREEDOM TO RAISE SAFETY CONCERNS TO PSEG MANAGEMENT
- 2 - PRODUCTION OVER SAFETY ISSUES
- 3 - SCHEDULE PRESSURE ISSUES
- 4 - LABOR - MANAGEMENT ISSUES
- 5 - INDUSTRIAL SAFETY ISSUES OTHER UNSPECIFIED ISSUES/COMMENTS
- 1 - PERCEIVED LACK OF FREEDOM TO RAISE SAFETY CONCERNS TO PSEG MANAGEMENT NONE
- 2 - PRODUCTION OVER SAFETY ISSUES (p. 33-46,92-93, 104) EDG jacket water leak event - shutdown action statement-technical adequacy of the operability determination was OK but the Ihift manages, at the time was unhappy with the condition of the EDG and the amount of help provided on them on the mid shift (p. 67 & 68) Individual perceives the current senior management Improving equipment reliability... focusing the organization on fixing things right the first time... [during the last outage] *what I saw In the last outage that we did was that.....there was a lot more emphasis on fixing the plant as opposed to can we start up now and fix it in the next refuel outage and avoid.... extending our forced outage time'.
(p. 101 - 103)The.SROdiscussed an event with the off-gas system and a procedure that stated...'.Do not operate above 75 SCFM'.
(p. 122)
I would say that the safety consdous work environment and the Importance of pladng nudear safety and Industrial safety and radiological safety over production, that has always... been dearly communicated, and I would say communicated on a regular basis, too."
- 3 - SCHEDULE PRESSURE ISSUES NONE
- 4 - LABOR - MANAGEMENT ISSUES NONE
- 5 - INDUSTRIAL SAFETY ISSUES NONE Information in this record was deleted In accordance with the Freedom of information Page 1 of 2 Act, exemptions 9<1 EDIA-
Kenneth Jenison notes/comments on th.q
- -nterview (02-05-04)
OTHER UNSPECIFIED ISSUES/COMMENTS (p. 58) The interviewed indMdual stated a lot of hardware changes and maintenance issues exist - ex. change from MIS to SAP Enterprise Resource Planning (ERP) software.
(p. 60 - 61) The interviewed Individual stated that the one-site philosophy was not working well..... "Ill say In the last six months I've seen a big difference...... pimarily In the management structure...... backed away ne-site philosophy and went back to a Hope Creek engineering staff and a Hope Creek maintenance staff and And that seems to be making a difference."
(p. 143 - 146) The interviewed individual stated that they felt additional stress but not specifically related to a root cause.