ML062210137
| ML062210137 | |
| Person / Time | |
|---|---|
| Site: | Salem, Hope Creek |
| Issue date: | 01/27/2004 |
| From: | Teator J NRC/OI |
| To: | Barber G, Vito D NRC Region 1 |
| References | |
| FOIA/PA-2005-0194 | |
| Download: ML062210137 (1) | |
Text
vaqe,
IId Itu V
-.OtL-CIVI,OJ qnrlEr-\\ VMLVr-l racie From:
Jeffrey Teator / 0 i-To:
David Vito; Scott Barber Date:
1127104 11:51AM
Subject:
SALEM SJ CHECK VALVE ISSUE Dave, Steve Pi le an I interviewe on 2 issues on 1/22/04. During the SCWE portion of the intervie aid that he believes the Sm SJ v as estion were declared operable (after leaking was-deteled) without a sound technical basisq oes not believe the conservative thing was done an, e do not believe that technical specification cTmpliance was met with how they handled the issuea, said that at artificial isla 0ertio made operabi *conclusions and ncessure/pushback on the J valve issue came fro SpecNii told 19ý
ý
ýhat they were not in tech spec compliance on i-s e an esponded that engineering hd done an evaluation - and pushed back o im he believed it was inoperable.
Eil.
heard a similar concern raised regarding these valves b
ýuring a 12/16/03 interview. We have now heard this from 2 high level s I s
-with indicatio at there may have been a violation of tech specs. I will not receive th Panscript for about 10 days - but wanted to get this info to you so that a formal determination can 6e made thru the tc~~r p*cess on whether a violation occurred here. If it did, there are clear indications from
.(.T,*,LLi,i'estimony t
it is potential deliberate misconduct Jeff CC:
Eileen Neff; Ernest Wilson I
I a*'formation in this record was deleted in accordance with the Freedom of Informption Act, exemptions "2c_.
fOMIAk-Zý00-r l t