Entergy Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 Pete Dietrich Site Vice President -JAF July 31, 2006 JAFP-06-0109 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant Docket No.: 50-333 License No.: DPR-59 License Renewal Application

Dear Sir or Madam:

Pursuant to 10 CFR 51 and 10 CFR 54, Entergy Nuclear Operations, Inc. (ENO) hereby applies for renewal of the operating license for the James A. FitzPatrick Nuclear Power Plant (JAFNPP) to extend the license for an additional 20 years beyond the current expiration date. With renewal, the JAFNPP operating license would be extended from midnight on October 17, 2014 to midnight on October 17, 2034.

The enclosed License Renewal Application and related Appendices contain the information required by 10 CFR 54 for the contents of an application.

As required by 10 CFR 54.21(b), current licensing basis changes which have a material effect on the content of this application, including the FSAR Supplement (Appendix A),

will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review.

This application is submitted in accordance with 10 CFR 2 Subpart A, 10 CFR 50.4, and 10 CFR 50.30. ENO hereby submits the original (plus 80 CDs) of the application pursuant to 10 CFR 50.4(b), 10 CFR 51.55(a), and 10 CFR 54.17(a).

Commitments contained in this application are summarized in the attachment.

Should you have any questions concerning this submittal, please contact Mr. James Costedio at (315) 349-6358.

412-Lf

Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 26th day of July, 2006.

Site Vice President PD/rp

Attachment:

List of Regulatory Commitments

Enclosures:

License Renewal Application Appendix A Updated Final Safety Analysis Report Supplement Appendix B Aging Management Programs and Activities Appendix C Response to BWRVIP Applicant Action Items Appendix D Technical Specifications Changes Appendix E Applicant's Environmental Report cc: with Attachment and Enclosures Mr. John P. Boska, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555 cc: without Attachment and Enclosures Mr. Samuel J. Collins, Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 NRC Resident Inspector U.S. Nuclear Regulatory Commission James A. FitzPatrick Nuclear Power Plant PO Box 136 Lycoming, NY 13093 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza, 10 th Floor Albany, NY 12223 Mr. Peter R. Smith, President NYSERDA 17 Columbia Circle Albany, NY 12203-6399

Attachment to JAFP-06-0109 List of Regulatory Commitments

Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant JAFP-06-0109 Attachment Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED ONE-COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE Programs listed in Appendix B Section X

October 17, 2014 B.1 of the license renewal application Update FSAR Supplement in LRA, Appendix A, Section A.1 and A.2 X

First FSAR update after LIRA approval