Text
-~ I October 21 2:15 P.M.
_ý C-1 nterview 1"N"MAQWmit safety
- 'Curren;s'ss - adequate kno-v*edge to operate plant, not enough industrial S iSu.ot, OSHA regs - "Gotten Better" S L l roviding strong support Confined s - G e tank Use of pictures to control RWP descriptions for where you can go or not go.
- Use of scrubs for contain control.
- SAP program - not optimized for corr action
- Pre-April 2003 HC Fuel Pin Leaks - 1% every ?/hrs.
- S1 August mini-outage hot leg sample SS-661 or report afender valves leaking sample values. -sprayed fine mist 1909F 15 min. stay times. Scaffold installed by flashlight to tighten value (12 in overhead) Got a string of lights - put up for 20-30hrs. Slight increase in RMS - inside bios "i - locked high rad 710 K/hr.
- tagging issue InforMatio0 j in tlis rNcord Wa inaCCordance with the ,.c 1ct, exempti2ns " eeom o2lnformatior, FOIA.________
October 22 2:30 P.M.a0 i /a3)AW1WM
- Would raise safety issues. Come tow-kas part of chain of command
- Survey - SS661s closed RCG dual as 30
- Highlighted problems with lights for this job
- RCP oil leak check 8:20 P.M. wlm" ' --- a
- Nuclear Safety Survey
- Ever seen productivity over safety, Nuclear safety is improving. No trouble sleeping with guys at the helm.
- Charging coolers must dismantle to clean them out. Back flush considered too expensive.
0 RIFR bolts - boric acid attach
- MS52s HGW fnp throttle sticks open
& Support from on-shift supv to stop job
- HC 100% 'C' SW pump Day 2/30
- S1 100% Green
- SZ Mid-loop Yellow ORAM, SG call Fri 25SG tight radius u-bend indications
- Fitz 100% RHR LCO - 16 hrs. behind due to discharge check valve mod.
11:30 A.M. 1978)
- Safety Survey - Doesn't like surveys, not useful
- Safety ciulture - unot where it needs to be" Requires personal follow up to get things done
- COU Pump Breaker - Trunk operated switch ou
- Post job briefs not done - where lessons learned cme from 2:00 P.M. ("1 4180) iE??- Work MGMT
- Continue action process notifications ECP.(not used) - Others had, ikedla
- Industrial Safety issues
& Takes the role of safety advocate - others are too timed.
Felt empowered e to resolve issues on his own
- *as excellent safety focus.
4111111w
October 23 alem
-10/15, 0300 G15 Digital FW 148F19 Manual Control of FWR bypass 59" 65" 67 auto trip 0530 TARP called out. Stuck at 74% open, Full close demand for 2 minutes. I&C techs
& mechanic 100% at calve.
.1.O.6._.0- 6:15 PM, 55% 1%mi. Questioe onSP. Problem with our control rod position indication Plant SD - delayed as long as possible "megawatt mentali y" Unit Trip - Awhile troubleshooting.
4:05 P.M. *
-100 guys in department - funnel concerns through him Wotal.
-Varying responses - stop work, do the work and grieve iF,-not a safety issue do this work
-24 BF19. - 300 failed to .respond -3NCOS throught the value was mechanicall bound.
-os ijiU S M for outage.-
w t*the value NCOS wanted to enter TS 3.0.3.:
-S/u of SZ done with main stm isolation, to MRS not done. (after Hurricane Isabel) Step in procedure missed. Notification written 9/2I i Reduced pwr values opened.
oade the sign off.
S9/26 during SU stm dumps not operating properly. Ran NCO out to similator to open SPS in manual, OSC to procedure..Obrvec vu cycliajy.
Off"-
"hands-offW mgmt style. . also "hands vances for field ops. I. '"
0osed locally w/o safety measures, Trunk operated switch operation, urging RCDT w/N2 .
_ . flew through system -
Wednesday, October 29 Fitz 100%
HC 80% 880mwp solar magnetic disturbances, ground current 10-21 amps on DC neutral ground. K-9 solar magnetic disturbance. Plant step 22-37 amps to 65% 1 amp - DC neutral ground SI 80% Grid stability KQ SZ need to enter Mode 6, need to restore ZB EDG for 10:00 am call today
Wednesday, October 29 1:15 P _ . ,. . \ ,Work
-March 2001 Tmg. Finished Xmas 2001 - fully qualified in Spring 2003. Cheating -
Reactor Buldifng...,.,.4 .. Cheating stopped after he wet Corroboratio so told them not to cheat.
cheating stopped during Aux Bl g - mgmt proctor.*l I I1IJ suspicious activity 4/11 - 5/06 to
-Culture - continuing training - taking a long time started to give him answers. - signing parties - Don't ask ad wrong sihgas could have caused shutdown Signing A" (good rid. b~d s s) got like 20 signatures - Tagout procedinal correct position - TB exhaust fan February 03 - ex c aton ' is to cover it up. -called Over rode red bY- (severely discipline daid he will here him out. Pro uction to get Tagout done. Fuel oil for EDG T u outage - l' vacuum pump tripped, second pump lost.seal. Make up isolation lift Wanted to rtIroblem. - aid say we kicked the float switch. Mention to Human error on value alignment. EDG surviellance readings -
Read 4480 DG ha o right 4430 kw output. Riht corroborate.
ay talk. People will not talk. H2 makeu senior trainer.
Reta lation is so pervasive no one would talk. -offered to give anonymity.
umtold him to lie to protect his identity. Bubblers empty - RFP, spray wash boosting pump. RWCC fuel pool pumps. No surveillance check 'c' shift hitched at over oil problems.*aid I wish i never hired. RACS problem not captured. Did write a notification. Will adjust SW discharge pressure reading - notification w iten and N2 makeup similar to H2. Stop using pipe wrench on nuts. Visi lock broken into. Desk broken into. Working recirc MG sets -'oil filter passing oil wrote notification.
SCWE policy - not enforced. Not supportive of policy. - Management buried under paperwork. Don't ask Don't tell. Use of MSDS for E.DG and Recirc MG Oil problems.
Can't* o home early because not qualified early. does it right. Peopl693F
."W oes it right. February 2002 - 3 said he was abhorrent. Talked about bomb or poisoning - reviewed with Ryn October 2002 being taped up.
$31/hour easy work for not much effort.
730 191003ale !.October 29, 2003 TWE - Jrull31, '5 - P' G "Overhead Crane 'B'*i.7 Tr ~ Qualified in 1997
ýTech Issues - 14 BF 19 Activator rides on 4 pins - If stuck, spray W/WD-40 (similar) an hit w/rubber mallett. Took too long to SD the unit. Prod over safety. SAP hard to use for work M mt & config con -20163897 Notification - MS 42 main stem inlet to FWPwrote 2 cks wlqWrote (1) Sept. 02 Changed codes foji R gain Mashed disparaging remarks. FW Leak - Leak s o et worse, when SD began. 'E' bus grounds - potential loss of RCPS
rewpacking off body to boneret. Knew where leak was began with mentality.
r-2 HR HY Head Bolts Reporting Boron on head of RHR HY. - deferred 5 or 10 year inspection through I or 2 inspections. March 03 grossin SI made decision to trip U-2, U-1 stayed 50% on U-1 Chg pump LO coolers plug due to iofouling. Excalating battle between union and mgmt. Last 1 / yr. CRS in middle.