July 17, 2006

Tennessee Valley Authority

ATTN: Mr. Karl W. Singer

Chief Nuclear Officer and

Executive Vice President

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT: BROWNS FERRY NUCLEAR PLANT - NRC INSPECTION REPORT

05000259/2006013, 05000260/2006013 AND 05000296/2006013

Dear Mr. Singer:

On June 23, 2006, the US Nuclear Regulatory Commission (NRC) completed an inspection at

your Browns Ferry Nuclear Plant. The enclosed inspection report documents the inspection

results, which were discussed on June 23, 2006, with Mr. B. OGrady and other members of

your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

Based on the results of this inspection no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Brian R. Bonser, Chief

Plant Support Branch 2

Division of Reactor Safety

Docket Nos. 50-259,05-260, 50-296

License No. DPR-33, DPR-52, DPR-68

Enclosure: (See page 2)

TVA 2

Enclosure: NRC Inspection Report 05000259/2006013, 05000260/2006013, and

05000296/2006013 w/Attachment: Supplemental Information

cc w/encl:

Ashok S. Bhatnagar

Senior Vice President

Nuclear Operations

Tennessee Valley Authority

Electronic Mail Distribution

Larry S. Bryant, Vice President

Nuclear Engineering & Technical Services

Tennessee Valley Authority

Electronic Mail Distribution

Brian O'Grady

Site Vice President

Browns Ferry Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

Preston D. Swafford

Senior Vice President

Nuclear Support

Tennessee Valley Authority

Electronic Mail Distribution

General Counsel

Tennessee Valley Authority

Electronic Mail Distribution

John C. Fornicola, Manager

Nuclear Assurance and Licensing

Tennessee Valley Authority

Electronic Mail Distribution

Bruce M. Aukland, Plant Manager

Browns Ferry Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

Glenn W. Morris, Manager

Corporate Nuclear Licensing

and Industry Affairs

Tennessee Valley Authority

Electronic Mail Distribution

(cc w/encl contd - See page 3)

TVA 3

(cc w/encl contd)

William D. Crouch, Manager

Licensing and Industry Affairs

Browns Ferry Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

State Health Officer

Alabama Dept. of Public Health

RSA Tower - Administration

Suite 1552

P. O. Box 303017

Montgomery, AL 36130-3017

Chairman

Limestone County Commission

310 West Washington Street

Athens, AL 35611

Masoud Bajestani, Vice President

Browns Ferry Unit 1 Restart

Browns Ferry Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Decatur, AL 35609

Robert G. Jones, General Manager

Browns Ferry Site Operations

Browns Ferry Nuclear Plant

Tennessee Valley Authority

P. O. Box 2000

Decatur, AL 35609

Distribution w/encl:

M. Chernoff, NRR

E. Brown, NRR

S. Shaeffer, RII

RIDSNRRDIRS

PUBLIC

_________________________

OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE RA RA RA

NAME LMILLER MWIDMANN BBONSER

DATE 7/17/2006 7/13/2006 7/17/2006 8/ /2006 8/ /2006 8/ /2006 8/ /2006

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

U. S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket No.: 50-259, 50-260, 50-296

License No.: DPR-33, DPR-52, DPR-68

Report No: 05000259/2006013, 05000260/2006013, 05000296/2006013

Licensee: Tennessee Valley Authority

Facility: Browns Ferry Nuclear Power Plant

Location: 10833 Shaw Road

Athens, AL

Dates: June 19-23, 2006

Inspectors: Lee Miller, Senior Emergency Preparedness Inspector

Section 1EP2, 1EP3, 1EP4, 1EP5, 4OA1

Approved by: Brian R. Bonser, Chief

Plant Support Branch 2

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000259/2006013, 05000260/2006013, 05000296/2006-013; 06/19-23/2006; Browns Ferry

Nuclear Plant, Units 1, 2, and 3; Baseline Inspection

The report covered an announced inspection by a Region II emergency preparedness

inspector. The NRCs program for overseeing the safe operation of commercial nuclear power

reactors is described in NUREG-1649, Reactor Oversight Process, Revision 3, dated

July 2000.

A. NRC-Identified and Self-Revealing Findings

Cornerstone: Emergency Preparedness

None

B. Licensee-Identified Violations.

None

3

1. REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP2 Alert and Notification System Testing

a. Inspection Scope

The inspectors evaluated the adequacy of licensee methods for testing the alert and

notification system in accordance with NRC Inspection Procedure 71114, Attachment

02, Alert and Notification System (ANS) Testing. The applicable planning standard

10 CFR Part 50.47(b)(5) and its related 10 CFR Part 50, Appendix E, Section IV.D

requirements were used as reference criteria. The criteria contained in NUREG-0654,

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and

Preparedness in Support of Nuclear Power Plants, Revision 1, was also used as

references.

The inspectors reviewed various documents which are listed in the Attachment to this

report.

b. Findings

No findings of significance were identified.

1EP3 Emergency Response Organization (ERO) Augmentation

a. Inspection Scope

The inspectors reviewed the ERO augmentation staffing requirements and the process

for notifying the ERO to ensure the readiness of key staff for responding to an event and

timely facility activation. The results of the December 20, 2005, unannounced off-hours

augmentation drill was reviewed. The inspectors conducted a review of the backup

notification systems. The qualification records of key position ERO personnel was

reviewed to ensure ERO qualifications were current. A sample of problems identified

from augmentation drills or system tests performed since the last inspection were

reviewed to assess the effectiveness of corrective actions.

The inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 03, Emergency Response Organization (ERO) Augmentation Testing.

The applicable planning standard, 10 CFR 50.47(b)(2) and its related 10 CFR 50,

Appendix E requirements were used as reference criteria.

The inspectors reviewed various documents which are listed in the Attachment to this

report.

4

b. Findings

No findings of significance were identified.

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes

a. Inspection Scope

The inspectors evaluated the associated 10 CFR 50.54(q) reviews associated with non-

administrative emergency plan, implementing procedures and EAL changes. The

revision 81 of the Emergency Plan covered the period from 03/22/2005 to 06/19/2006.

The inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 01, Emergency Action Level and Emergency Plan Changes. The

applicable planning standard, 10 CFR 50.47(b)(4) and its related 10 CFR 50, Appendix

E requirements were used as reference criteria. The criteria contained in

NUMARC/NESP-007, Methodology for Development of Emergency Action Levels,

Revision 2, Regulatory Guide 1.101 were also used as references.

The inspectors reviewed various documents which are listed in the Attachment to this

report.

b. Findings

No findings of significance were identified.

1EP5 Correction of Emergency Preparedness Weaknesses and Deficiencies

a. Inspection Scope

The inspectors reviewed the corrective actions identified through the EP program to

determine the significance of the issues and to determine if repeat problems were

occurring. The facilitys self-assessments and audits were reviewed to assess the

licensees ability to be self-critical, thus avoiding complacency and degradation of their

EP program. In addition, inspectors review licensees self-assessments and audits to

assess the completeness and effectiveness of all EP-related corrective actions.

The inspection was conducted in accordance with NRC Inspection Procedure 71114,

Attachment 05, Correction of Emergency Preparedness Weaknesses and

Deficiencies. The applicable planning standard, 10 CFR 50.47(b)(14) and its related 10

CFR 50, Appendix E requirements were used as reference criteria.

The inspectors reviewed various documents which are listed in the Attachment to this

report.

b. Findings

No findings of significance were identified.

5

4. OTHER ACTIVITIES

4OA1 Performance Indicator (PI) Verification

a. Inspection Scope

The inspectors reviewed the licensees procedure for developing the data for the

Emergency Preparedness PIs which are: (1) Drill and Exercise Performance; (2) ERO

Drill Participation; and (3) ANS Reliability. The inspectors examined data reported to the

NRC for the period April 1, 2005 to March 31, 2006. Procedural guidance for reporting

PI information and records used by the licensee to identify potential PI occurrences

were also reviewed. The inspectors verified the accuracy of the PI for ERO drill and

exercise performance through review of a sample of drill and event records. The

inspectors reviewed selected training records to verify the accuracy of the PI for ERO

drill participation for personnel assigned to key positions in the ERO. The inspectors

verified the accuracy of the PI for alert and notification system reliability through review

of a sample of the licensees records of periodic system tests.

The inspection was conducted in accordance with NRC Inspection Procedure 71151,

Performance Indicator Verification. The applicable planning standard, 10 CFR 50.9

and NEI 99-02, Revision 3, Regulatory Assessment Performance Indicator Guidelines,

were used as reference criteria. This inspection activity represents three samples on an

annual basis.

The inspectors reviewed various documents which are listed in the Attachment to this

report.

b. Findings

No findings of significance were identified.

4OA6 Meetings, including Exit

On June 23, 2006, the inspector presented the inspection results to Mr. E. Willis,

Manager - Operations, and other members of his staff acknowledged the findings. The

team lead stated that additional information would be accepted and reviewed. The

inspectors confirmed that proprietary information was not provided or taken during the

inspection.

ATTACHMENT: SUPPLEMENTAL INFORMATION

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee personnel

B. OGrady, Site Vice President

J. DeDomenico, Assistant Plant Manager

T. Elms, Manager - Operations

T. Feltman, Emergency Preparedness

B. Marks, Emergency Services - Corporate

R. Delong, Site Engineering Manager

W. Crouch, Site Licensing Manager

J. Wallace, Site Licensing Engineer

D. White, Nuclear Assurance

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Openned

None

Openned and Closed

None

Closed

None

Discussed

None

A-1 Attachment

LIST OF DOCUMENTS REVIEWED

Section 1EP2: Alert and Notification System Testing

Procedures

EPIL (Emergency Preparedness Instruction Letter) -14, Facilitation of the Prompt Notification

System and Pager Tests, Rev. 9

EPFS(Emergency Preparedness Field Support)-9, Inspection, Service, and Maintenance of the

Prompt Notification System (PNS) at Browns Ferry, Sequoyah, and Watts Bar Nuclear Plants,

Rev. 1

Records and Data

Reviewed the maintenance records 2nd quarter 05 - 1st quarter 06

Miscellaneous

Observed annual maintenance on siren #10 6/20/06

Section 1EP3: Emergency Response Organization (ERO) Augmentation

Procedures

TRN-30, Radiological Emergency Preparedness Training, Rev. 12

EPIP-1, Emergency Classification Procedure, Rev. 40

EPIL-14, Facilitation of the Prompt Notification System and Pager Tests, Rev. 9

ETP-101, Site Emergency Director Training, Rev. 8 (lesson plan, handouts, written

examination)

ETP-102, Site Technical Support Center (TSC), Rev. 7 (lesson plan, handouts, lessons

learned, written examination)

ETP-103, Operations Support Center (OSC), Rev. 7, (lesson plan, handouts, lessons learned,

written examination)

Records and Data

R92060104851, Orange Team Emergency Preparedness (EP) Unannounced Staffing Drill,

12/21/05

Section 1EP4:Emergency Action Level (EAL) and Emergency Plan Changes

Procedures

EPIP-1, Emergency Classification Procedure, Rev. 40

EPIP-3, Alert, Rev. 30

EPIP-4, Site Area Emergency, Rev. 28

EPIP-5, General Emergency, Rev. 33

EPIP-6, Activation and Operation of the TSC, Rev. 23

Radiological Emergency Plan , Rev. 81

A-2 Attachment

Plans and Changes packages

Change package for Radiological Emergency Plan, Rev. 81

Change package for EPIP-1, Emergency Classification Procedure, Rev. 39

Change package for EPIP-1, Emergency Classification Procedure, Rev. 40

Change package for EPIP-3, Alert, Rev. 30

Change package for EPIP-2, Notification of Unusual Event, Rev. 27

Change package for EPIP-4, Site Area Emergency, Rev. 29

Change package for EPIP-5, General Emergency, Rev. 35

Change package for EPIP-6, Activation and Operation of the Technical Support Center (TSC) -

Rev. 24

Section 1EP5:Correction of Emergency Preparedness Weaknesses and Deficiencies

Procedures

EPIL [Emergency Preparedness Instruction Letter] -5, EP Tracking System Activities

Management Oversight System (AMOS), Rev. 5

Records and Data

Matrix of Scenarios versus Shift Manager and Site Emergency Directors

PER 101086, Reutilized scenario resulted in Shift Manager being evaluated on same scenario.

PER 79742, Ambulance Communications problems

PER 82137, EPIP-1, Table data not displayed

PER 81140, EPIP-3, Appendix A wrong date entered and faxed to Operations Duty Specialist

PER 82142, OSC Staging Area craftsmen lacking Mask fits

PER 82145, Integrated Training Drill - Containment venting not reduced or isolated

PER 82147, 2005 Integrated Training Drill - 2-AOI 100-1 two procedure change identified

PER 84027, Alternate Source Term and Standby Liquid Control system questions

PER 86493, Incorrect revision of training material used during Maintenance Block training

PER 89240, Emergency Responders - two doors marked Emergency Exits were locked shut

PER 100950, Missed Performance Indicator during 2006 Blue Team Training Drill

PER 100952, Discrepancy identified on EOI Team dispatched from OSC

PER 102322, 3 of 5 candidates misapplied the Emergency Exposure Guidelines in EPIP-15

Section 4OA1: Performance Indicator (PI) Verification

Procedures

EPIL [Emergency Preparedness Instruction Letter] -15, Emergency Preparedness Performance

Indicators, Rev. 10

Records and Data

Documentation of DEP opportunities from Operations Simulator evaluations on 04/27/2005,

06/8/2005, 07/13/2005, 10/5/2005,11/14/05, 11/19/05, 11/21/05, 11/28/05, 12/5/05, 12/12/05

Selected training records of drill/exercise participation by ERO personnel during 2005

R92051201851, 2005 Radiochemistry (Post Accident Sampling) Drill, 12/1/2005

EPIP-10, MERT, actual event 3/29/05 - contaminated injured person transported to hospital

Blue Team Training Drill package (scenario, time line, event notification forms, player logs and

completed procedures), 10/5/05

A-3 Attachment

Green Team SAMG Training Drill package (scenario, time line, event notification forms, player

logs and completed procedures), 4/26/06

Red Team Training Drill package (scenario, time line, event notification forms, player logs and

completed procedures), 7/13/06

Blue Team Training Drill package (scenario, time line, event notification forms, player logs and

completed procedures), 4/12/06

Data for Drill/Exercise Performance (1 quarter 2005 - 1 quarter 2006)

Siren weekly and monthly tests 4/05 thru 3/06

Siren Maintenance records 4/05 thru 3/06

LIST OF ACRONYMS

ANS Alert and Notification System

EAL Emergency Action Level

EP Emergency Plan

ERO Emergency Response Organization

PI Performance Indicator

A-4 Attachment