ML062130182

From kanterella
Jump to navigation Jump to search
EA-04-131-3, Cooper
ML062130182
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/17/2006
From: Luehman J, Morell G, Nolan M
NRC/OE
To:
References
EA-04-131, FOIA/PA-2006-0007, IR-04-014 EA-04-131-3
Download: ML062130182 (2)


Text

SDP/EA REQUEST & STRATEGY FORM Case Data SDP/EA No.:

04-131 Request Date:

12/09104 Region: !IV Disputed: r-Number: [I]

Do Case Type:

Rx Related Cases:

cket No.: 05000298 Smal Entity.rx No DYes Licensee:

Nebraska Public Power District Facility / City. ooper Last Day of insp.:

J/22/04 License Insp. Rpt No Facts (EATS):

No.:

DPR-46 IR-G4-14 Keywords:

ES:

gkm Failure to properly restore the servkce water to its normal configuration following routine maintenance i* that t he icensee did not reaign the gland water following service water maintenance. The failure to realign the gland water was atitruted to inadequate insructions. The inadequate i*structions led to the cross connection of gland water resuring in a loss of service water redundancy.

Discussion (if required): One >green finding and volation of Criterion V for inadequate written instructions for restoring service water to operable status following maintenance.

NOTE: Additional SERPs were conducted on 9/204 and 9/9/04. Discussions involved the licensee's pump analysis as well as the icensee's contention that the LERF was riot a factor in determining the significance of the violation because the icensee has stated that they could evacuate to local population in approx-nately 65 minutes (bad weather included) prior to possible containment breach (up to 5.5 hrs Rx water reaches TAF and lower head breach). The SERP failed to reach a consensus on whether evacuation time estimates should be included in assessing LERF. NRR management will be briefed and asked to assist in resolving this issue.

SDP D-No xlYes Assessment Lt.j

[] White

[]'Ye11,,

NOV XI]

Yes [:No Wrongdoing WXONo DiYes 01 Ref. Date OP Rpt No.:

O1Rpt Date:

DOJ Referral?.

E No

[]Yes Ref. Date Action Date Decline El Accept Additional 01 Status 0

01 Investigating El 01 needs to be notified r-Ot/OE dispute memo needed I-] Additonal coordination needed

[_]Awaiting DOJ IE Needs coordination with DOJ Escalated Action Consequence:

ElActuall Potential E-] Reg. Impact E Willfulness Prior Esc. Action?

-- No El Yes EA:

Date:_

ID Credit?

E'No ElYes EITBD SL:E CA Credit?

EiNo E-lYes

-- TBD Supp:E CP?

El-No CP [iiBase El Double Base ElOther:.

Discretion or Order?

F"*No ° LYes Explain:

Future Action Conference?

El No ElYes El open E Closed Additional

,pi?

ED No Violation Re-panel E

PEC Letter Choice Letter Choice Call SL IV NOV Re-caucus J IRegion Issue Esc. Action I Full Package ReiAew by HO U DEDR Review I ICommission B

Disagreement I9 NCV Other Action?

A. Howell, S. Schwind, K.. Fuller, W. Walker, T. Vegel, D. Loveless, G. Shear, D. Chamberlain, G. Sanbom, K. Kennedy, D. Loveless, S. Cochrum

Participants:

Region OE J. Luehman, G. Morell, C. Nolan OGC/OI R. Franvich, R. Giibbs, D. Coe, M. Tshiltz, M.

Reinhart, S. Richards, S. Meng Wang, B. Paela, S.

Lavie, M. Honcharik, See-Meng Wong, A.. El-Program Office Bassioni, R.Bywater, S.Lavie Other hitormation insM reord was deiet in =ofaWt tReo b~

OAd.

9xm6/q-6 7'

Approved, Dir. OE: IRAI C. Nolan Date:

1/17105 L- /-

000 FO PUB DIS LOSU HOUT R

OF R CTO,

E

  • '0 L oI LC

~ePA + I