July 26, 2006 Southern Nuclear Operating Company, Inc.
ATTN: Mr. D. E. Grissette, Vice President P. O. Box 1295 Birmingham, AL 35201-1295
SUBJECT:
RADIATION PROTECTION INSPECTION - ALVIN W. VOGTLE NUCLEAR PLANT
Dear Mr. Grissette:
On September 18 - 22, and October 2 - 6, 2006, the NRC will perform the baseline Occupational Radiation Safety Inspection at the Alvin W. Vogtle Nuclear Plant, (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and Radiation Safety Sections of 711551).
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection. It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a two-day preinspection visit with your staff for August 28 - 29, 2006. The material requested will be reviewed and collected at that time.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be William Copeland of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Adam Nielsen, at (404) 562-4660, or the Plant Support Branch 1 Chief, Robert Haag, at (404) 562-4607.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/
reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA: George Kuzo for/
Robert C. Haag, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81
Enclosure:
(See next page)
SNC 2
Enclosure:
Document Request List cc w/encl:
J. T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution T. E. Tynan General Manager, Plant Vogtle Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution N. J. Stringfellow Manager-Licensing Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bentina C. Terry Southern Nuclear Operating Company, Inc.
Bin B-022 P. O. Box 1295 Birmingham, AL 35201-1295 Director, Consumers' Utility Counsel Division Governor's Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Office of the County Commissioner Burke County Commission Waynesboro, GA 30830 Director, Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Manager, Radioactive Materials Program Department of Natural Resources Electronic Mail Distribution Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 (cc w/encl contd - See page 3)
SNC 3
(cc w/encl contd)
Laurence Bergen Oglethorpe Power Corporation Electronic Mail Distribution Resident Manager Oglethorpe Power Corporation Alvin W. Vogtle Nuclear Plant Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distributioin Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington Street, SW Atlanta, GA 30334 Distribution w/encl:
C. Gratton, NRR RIDSNRRDIRS PUBLIC
Enclosure Document Request List Information Pre-Inspection Visit:
August 28 - 29, 2006 Inspection Dates:
September 18 - 22 and October 2 - 6, 2006 Inspection Procedures:
IP 71121.01 Access Control To Radiologically Significant Areas IP 71121.02 ALARA Planning and Controls IP 71122.02 Radioactive Material Processing and Transportation IP 711551 Performance Indicator Verification Note: This is a list of the documents the lead NRC inspector will obtain during the pre-inspection visit. The current version of these documents is expected unless specified otherwise. Electronic media is preferred, if readily available (The preferred file format is Word, WordPerfect, or searchable.pdf files on CDROM). The lead inspector will discuss specific information needs with the licensee staff and may request additional documents. The lead inspector is also the primary contact for questions regarding the documents requested.
Miscellaneous
- 1. Current organization chart for HP/Chemistry/Radwaste/Shipping with contact numbers.
- 2. Corrective action program procedure.
- 3. Outage schedule of major activities (Gantt chart if available).
- 4. HP Manual.
Access Controls
- 6. Procedures related to HP/access controls, e.g.
(Posting, labeling, surveys, RWPs, contamination control, dosimetry, multi-dosimetry, key control, control of divers, controls during fuel offload, etc.)
- 7. List of all non-fuel items stored in spent fuel pool (both units).
- 8. Internal dose assessments for intakes where dose was assigned since September 2005.
- 10. Most recent self-assessment or audit of access control program.
- 11. LIST of CRs related to access controls (including poor radworker or HP tech performance) issued since September 2005.
- 12. All procedures related to HP/ALARA not listed above (e.g. declared pregnant worker, shielding, etc.).
- 13. All procedures related to crudburst & cleanup.
- 14. ALARA manual (or equivalent high-level procedure).
- 15. List of top 5 dose jobs for refueling outage and ALARA planning packages if available.
- 16. Crudburst & cleanup trending point data from previous outage (dose rates and cobalt concentration). Data should be from the same unit as the current outage.
2 Enclosure
- 17. Source term reduction program guidance, including cobalt reduction.
- 18. LIST of CRs related to ALARA since April 2004. Note: you dont need to duplicate any CRs that overlap with access controls.
- 19. Most recent self-assessment or audit of ALARA program.
Shipping & Radwaste
- 20. All procedures related to transportation and solid radwaste processing.
- 21. Current PCP.
- 22. List of all shipments made since April 2004.
- 23. List of all changes made to solid and liquid radwaste processing systems since April 2004.
- 24. List of all permanently abandoned solid and liquid radwaste processing equipment.
- 25. Last two 10 CFR Part 61 analyses for each waste stream.
- 26. List of CRs related to shipping or radwaste since April2004.
- 27. Most recent self-assessment or audit of Shipping/radwaste processing program.
PI Verification (occupational and public cornerstones)
- 28. Procedure for gathering and reporting PI data.
- 29. List of all CRs since September 2005 using keywords: HRA, LHRA, VHRA, unintended dose, unlocked door, offsite dose, ODCM, etc. Again, you dont need to duplicate any CRs from above.
- 30. Monthly PI reports since September 2005.
- 31. List of all dose rate alarms >1R/hr since September 2005.
- 32. List of all dose alarms since September 2005.
- 33. All final release point effluent monitor out-of-service dates since September 2005.
- 34. Most recent gaseous and liquid effluent release permits.
- 35. 2005 Annual Effluent Report.
Lead Inspector Contact Information:
Adam Nielsen, CHP (404) 562-4727 adn@nrc.gov Mailing Address US NRC Region II ATTN: Adam Nielsen 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415
OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE RA RA RA NAME R. Haag A. Nielsen S. Schaffer DATE 7/26 /06 7/25/06 7/25/06 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO