|
---|
Category:E-Mail
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report 2024-09-09
[Table view] |
Text
-, . " . .... ,
From:
To: <1v07T-@nrc.gov>
Date: 2/18104 2:18AM
Subject:
Re: Old E-mails Hi Jeff, an ....
I know on my crew there was myself anfr.m I I know that when there was only 10-12 signatures left on a qual card, eryone pretty much wanted to get it over with. The evaluators Qn y shift were very clear early on that he wasn't going to do OJ/J' i~d *.
done a few OJT/OJE's, but resisted vigorously.
Both management and my peers were under pressure to get me and my classmates qualified as soon as possible. As the evaluators felt more comfortable with me or my classmates, the evaluators would give more leniency especially toward the end of the card (all of the qual cards Turbine bldg, reactor bldg, auxiliary bldg, and yard bldg) .My classmates' seemed more willing to play the game and they were granted more leniency s6"oner and more often. It was a tongue in cheek thing, when one of Thy classmatesiseemed to advance a lot (get a lot of OJE's completed) suddenly, that t*'ey had bee-P"'*helped" along. These help along or "signing parties" (I use this phrase because Itwas the phrase used by my coworkers) were always lven with the premise, by the evaluators, that if it were ever "found out," they would deny everything. As the whole group benefited, it would be the whistle blowers word against their collective denial.
Then, of course, the only-Orsons who's'bredibility was at stake was the whistle blowers. At that point the ostracizing and harassment woulde stepped up again as it would now be known that.th- whistle blower was not only a contrarian, but a "Rat" '-
I do remember the people that my classmates didn't want to have do an OJE wer' WO A "_ These'gu'ys at -7 least met the spirit and Intent of the OJT/OJE process. No on' eve'r follow-ed the procedure to the letter (arm bands weren't worn, reporting a failed OJT/OJE to management for evaluation and remediation was never done due to the "harming a union brother' clause , and only a few people seemed to meet the intent, because itt*ok too much timebO too much work.
I don't know exactly what happened on other shifts as they very "campy"and Compartmentalized about who they" taked too... .
includedInconversation. ostoT wassrom listenlngaconversklton with the different shifts wheq 1would work with them:.
But when working ith guys In the field (my classmates) it Would become clear that they had not done a good OJT/O-J when thef'wouldn't know where to even start to look for things and the "i kinda blazed through that one" remark was the answer.! Blazed was anothier'word used for getting a signature without a proper OJT/IJE7--
Againhas a lot more Info, sworn testimony66 a court recorder".
I I really w oget I was evef at PSEf. I spend a riir;mum of effort trying to keep this information fresh except for "whatnot to do" on the job experience stories. I resent that I was expected to work Insuch a work environment. I continue to be troubled by the fact that the few people who shared my concerns felt disempowered and threatened (Cob secur'iqbr professional Information in this record Was deleted in accordance with the Freedom of Inform3tlo Act, F01k-`exemptions . 2
advancement). I have spent a lot of my personal time and energy trying to get these concerns heard (hundreds of hours). Right now it is 2343 hours0.0271 days <br />0.651 hours <br />0.00387 weeks <br />8.915115e-4 months <br />. I will be up at 0445 tomorrow, IfI'd known what itwas Like ,,e Creek, IwofiL names in my class I will sit down tomorrow and put together all of the and give my best recollection of events. .
I turned over all of my copies ofas they wanted to see if I could take credior anything So fir as I n wan
,. the only credit I've been given is initial radiation worker CFWining-took the requal successfully here), and respirator training I fit test.
Iwill as *I believe he has them) ifI can get copies.
When I getvem i-"m'- akeanother copy and try to remember which ones were gimme's and which ones weren't. There are hundreds of signatures. I don't know if I can accurately remember every one.
I returned a copy of a letter from David J. Vito with additional notes to a David J. Vito. Itwas addressed to you and he. Have you seen this letter?
I will continue help as much as possible. Please get a copy of ALL of tc. They will have more details then my current memory.
As I've said before, PSEG was stressful both emotionally and physically.
Every time I think about Itthe anxiety builds. My blood pressure went up an average 20 points while there (I couldn't give blobd at the bloodmobile ..
because my blood pressure was too high and my pulse rate was too high). Since I've left I'vee"o better health and a huge reduction in my anxiety level. -If you ge otes, you can ask better questions and I will be more productiv ou.
I appreciate your tenacity and believe that you will find more than I have provided, or that I was aware of. DON'T STOPI I am very tired.
Lcer CC:
--- *(..L.....