ML061980037
| ML061980037 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 07/20/2006 |
| From: | Boska J NRC/NRR/ADRO/DORL/LPLI-1 |
| To: | Kansler M Entergy Nuclear Operations |
| Boska J, NRR, 301-415-2901 | |
| References | |
| TAC MC9475, TAC MC9476 | |
| Download: ML061980037 (5) | |
Text
July 20, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING AMENDMENT APPLICATION FOR CHANGES TO ADMINISTRATIVE CONTROLS (TAC NOS. MC9475 AND MC9476)
Dear Mr. Kansler:
On December 27, 2005, Entergy Nuclear Operations, Inc. (Entergy), submitted an application for a proposed amendment for Indian Point Nuclear Generating Unit Nos. 2 and 3 which would make changes to the Technical Specifications, Section 5, Administrative Controls.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). During a telephone call on July 13, 2006, the Entergy staff indicated that a response to the RAI would be provided within 60 days.
Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely,
/RA/
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286
Enclosure:
RAI cc w/encl: See next page
ML061980037 OFFICE LPL1-1/PM LPL1-1/LA IHPB/BC LPL1-1/BC NAME JBoska SLittle T. Frye RLaufer DATE 7/19/06 7/19/06 7/20/06 7/20/06
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Christopher Schwarz Vice President, Operations Support Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P. O. Box 249 Buchanan, NY 10511-0249 Assistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Department of Public Service 3 Empire State Plaza Albany, NY 12223
Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Raymond L. Albanese Four County Coordinator 200 Bradhurst Avenue Unit 4 Westchester County Hawthorne, NY 10532 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Garry Randolph PWR SRC Consultant 1750 Ben Franklin Drive, 7E Sarasota, FL 34236 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.
828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524
Enclosure REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROLS ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 DOCKET NOS. 50-247 AND 50-286 In a letter dated December 27, 2005 (Agencywide Documents Access and Management System Accession No. ML060090293), Entergy Nuclear Operations, Inc. (Entergy), submitted an application for a proposed amendment to the Technical Specifications (TSs) for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3) which would revise Section 5 on Administrative Controls. The Nuclear Regulatory Commission staff is reviewing the submittal and requests the following additional information:
Entergy has requested to change the TS on the Explosive Gas and Storage Tank Radioactivity Monitoring Program (TS 5.5.10.c for IP2 and TS 5.5.11.c for IP3). The change would allow an increase in the quantity of radioactivity in outdoor tanks not surrounded by liners, dikes, or walls, to concentrations that are 10 times the values of 10 CFR Part 20, Appendix B, Table 2, Column 2, at the nearest potable water supply and the nearest surface water supply beyond the site boundary, in the event of an uncontrolled release of the tanks' contents. The justification is based on the Technical Specification Task Force (TSTF) document TSTF-258. However, TSTF-258 applies to monitored liquid effluent releases, not to tanks. NUREG-1431, Rev. 3, Standard TSs, has the same wording as the current IP2 TS. The current wording supports the 10 CFR 50.36a criteria to keep releases to a small fraction of the public dose limit in the unlikely event of a tank failure resulting in an unmonitored release. Please justify how the revised wording would keep releases to a small fraction of the public dose limit.