MONTHYEARML23129A3022023-04-20020 April 2023 1 to Updated Safety Analysis Report, Technical Requirements Manual, Section 3 NLS2021053, Emergency Plan Implementing Procedure2021-08-30030 August 2021 Emergency Plan Implementing Procedure ML21130A1002021-04-21021 April 2021 Revisions to Tech Requirements Manual Section 3 NLS2018042, Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.6, Revision 742018-08-13013 August 2018 Report of Change and Summary of 50.54(q) Analysis Emergency Plan Implementing Procedure 5.7.6, Revision 74 NLS2017071, Inservice Inspection Program Fifth Ten-Year Interval 10 CFR 50.55a Relief Requests2017-08-17017 August 2017 Inservice Inspection Program Fifth Ten-Year Interval 10 CFR 50.55a Relief Requests NLS2016011, Emergency Plan Implementing Procedure 5.7.2, Revision 342016-02-26026 February 2016 Emergency Plan Implementing Procedure 5.7.2, Revision 34 ML15126A4302015-04-30030 April 2015 Offsite Dose Assessment Manual, January 1, 2014 Through December 31, 2014 and Process Control Program NLS2014036, Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual, Submittal and Summary of Changes to the Process Control Program2014-05-0101 May 2014 Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual, Submittal and Summary of Changes to the Process Control Program NLS2013067, Errata for Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual Submittal and Summary of Changes to the Process Control Program2013-06-0505 June 2013 Errata for Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual Submittal and Summary of Changes to the Process Control Program NLS2013046, Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual, Submittal and Summary of Changes to the Process Control Program2013-05-0101 May 2013 Annual Radioactive Effluent Release Report, Offsite Dose Assessment Manual, Submittal and Summary of Changes to the Process Control Program ML0712403472007-05-0101 May 2007 Enclosure 2, Cooper - Offsite Dose Assessment Manual ML0619403332006-07-0707 July 2006 Gland Water Cross-tie Pump Failures Fault Trees NLS2005031, Enclosure 2, NLS2005031, Cooper Nuclear Station, Offsite Dose Assessment Manual.2005-04-27027 April 2005 Enclosure 2, NLS2005031, Cooper Nuclear Station, Offsite Dose Assessment Manual. ML0619801852004-08-0505 August 2004 Pages 1 - 2 of CNS System Operating Procedure 2.2.71, Service Water System, Revision 74 ML0619801402004-05-17017 May 2004 CNS Conduct of Operations Procedure 2.0.1.2, Operations Procedure Policy, Revision 21 ML0619504562004-01-26026 January 2004 CNS Alarm Response Procedure 2.3_B-3, Panel B - Annunciator B-3, Revision 8 ML0619504432004-01-19019 January 2004 CNS System Operating Procedure 2.2.71, Service Water System, Revision 69 ML0619504482004-01-19019 January 2004 CNS Alarm Response Procedure 2.3_SW-GLND-B, SW Gland Water Supply Panel - Annunciator 1B ML0619504302003-12-10010 December 2003 CNS Alarm Response Procedure 2.3_A-4, Panel a - Annunciator A-4 ML0412703052003-12-0404 December 2003 Offsite Dose Assessment Manual ML0619404482003-10-14014 October 2003 CNS Emergency Procedure 5.2SW - Service Water Casualties ML0628305322003-05-0707 May 2003 Vendor Manual, Byron Jackson Pump Division, Service Water Pumps, Manual No. VM-1800, Revision 23 ML0619404462003-02-22022 February 2003 Maintenance Procedure 7.2.45, SW Pump Lift Adjustment, Revision 9 ML0230101362002-06-10010 June 2002 the Strategic Improvement Plan Revision 1 - June 10, 2002 ML0230101762002-06-10010 June 2002 TIP Action Plan, Revision 1 ML0212801662002-02-0606 February 2002 Assessment Manual -ODAM - for Assesment of Gaseous & Liquid Effluents at Cooper Nuclear Station 2023-04-20
[Table view] Category:Operating Procedures
MONTHYEARML0619403332006-07-0707 July 2006 Gland Water Cross-tie Pump Failures Fault Trees ML0619801852004-08-0505 August 2004 Pages 1 - 2 of CNS System Operating Procedure 2.2.71, Service Water System, Revision 74 ML0619801402004-05-17017 May 2004 CNS Conduct of Operations Procedure 2.0.1.2, Operations Procedure Policy, Revision 21 ML0619504482004-01-19019 January 2004 CNS Alarm Response Procedure 2.3_SW-GLND-B, SW Gland Water Supply Panel - Annunciator 1B ML0619504432004-01-19019 January 2004 CNS System Operating Procedure 2.2.71, Service Water System, Revision 69 ML0619504302003-12-10010 December 2003 CNS Alarm Response Procedure 2.3_A-4, Panel a - Annunciator A-4 ML0619404482003-10-14014 October 2003 CNS Emergency Procedure 5.2SW - Service Water Casualties ML0619404462003-02-22022 February 2003 Maintenance Procedure 7.2.45, SW Pump Lift Adjustment, Revision 9 2006-07-07
[Table view] |
Text
-CLASS: CONTINUOUS 6-CNS OPERATIONS MANUAL EFFECTIVE: 12/10/03
~2' ALARM PROCEDURE 2.3-A-4 EFFECTVE: SORC/IQA OWNER: O.SGSCIQ APPROVAL: SUP V PANEL A - ANNUNCIATOR A-4 OER:MENG SPV DEPARTMENT: OPS PANEL/WINDOW LOCATION: A-4/A-1 SETPOINT dCI (3350) CIRC WATER PUMP AkTRIP EE-REL-CWP1A(30):
caused by:
- 1. -Undervoltage 1. EE-REL-(27X I-1A)
- 2. Lockout .2. EE-REL-CWP1A(86)
- 3. Power factor 3. EE-REL-CWP1A(55)
CIRC WATER and EE-REL-CWP1A(48)
PUMP A 4. Pump switch in PULL-TO-LOCK 4. CW-SW-(CWP-IA)(CS) with discharge valve 20% open and CW-MO-1 12MV
- 5. Discharge valve notfull open 5. CW-SW(CWP-1A) (CS) and CW-MO-112MV
- 6. Overload .6. EE-REL-CWPIA (50-50-51) :and EE-REL-CWP1A(50G) 1..AUTOMATIC ACTIONS 1.1 CW-MO-112MV, CW PUMP ADISCHARGE, closes.
- 2. 'OPERATOR OBSERVATION AND ACTION 2.1 If condenser vacuumlowering, concurrently enter Procedure 2.4VAC.
- NOTE.- If condenser vacuum is lowering, do not backwash pump before starting.
2.2 If-available, start another circulating water"pump.
'2.3 If liquid discharge in progress, ensure adequate dilution or secure discharge.
- 3. PROBABLE CAUSES 3.1 None.
- 4. REFERENCES 4.1 Abnormal Procedure 2.4VAC.,Loss of Condenser Vacuum..
PROCEDURE 2.3.A-4 REVISION 11 PAGE 1 OF 46
J PANEL/WINDOW LOCATION: A-41E-6 SETPOINT CIC (3445) SW GLAND WATER SUPPLY ANN-ANN-SWGWSA SUPPLYWTR SW GLAND SYS A TROUBLE caused by any SW SYSTEM A Gland Water Panel A alarm TROUBLE I.. AUTOMATIC ACTIONS 1.1 None.
- 2. OPERATOR OBSERVATION AND ACTION 2.1 Take action per Procedure 2.3_SW-GLND-A, Annunciator 1A/A-3 on'SW Gland Water Panel A.
- 3. PROBABLE CAUSES 3.1 Any alarm condition on SW Gland Water PanelA.
- 4. REFERENCES 4.1 Alarm Procedure 2.3_SW-GLND-A, SW Gland Water'Supply Panel -
Annunciator 1A.
PROCEDURE 2.3_A-4 REVISION 11 PAGE 42 OF 46